Arkema Interim Action-Phase 1 2026

Agency: Port of Tacoma
State: Washington
Type of Government: State & Local
NAICS Category:
  • 541620 - Environmental Consulting Services
  • 562910 - Remediation Services
Posted Date: Aug 5, 2026
Due Date: Sep 10, 2026
Solicitation No: 072026-1051
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Arkema Interim Action-Phase 1 2026

Bid Number:

072026-1051

Estimated Cost Range:

$6,500,000 to $7,000,000, plus Washington State Sales Tax (WSST)

Procurement Summary:

The Work required for this Project includes:

Containment Wall: the work consists of constructing a continuous wall with a self-hardening slurry that consists of a mixture of ground granulated blast furnace slag, select clay and water to form a low permeability barrier to contain groundwater. The wall shall be keyed into the second site aquitard by vibrating beam methods.
Site Preparation and Wall Area Capping: the existing site will require preparation, excavation, fill, grading, demolition, surcharge, and temporary work prior to containment wall installation. An impervious cap consisting of imported soil, geotextile and a PVC liner will be placed over the wall area following wall installation to reduce stormwater infiltration within the containment wall.
Stormwater Conveyance Improvements: one new 30-inch outfall and one existing 36-inch outfall will be modified as part of the Work. Outfall construction and modification include piping, vaults, headwalls, steel piling installation, check valves and cofferdams. A collection and conveyance system will be installed to connect the wall cap area to new and existing outfalls.

Notes:

Special Conditions: Partial funding of this project is being provided by the Washington State Department of Ecology. All terms and conditions included in the grant agreement between the Port of Tacoma and Washington State Department of Ecology are fully incorporated into the agreement with the Contractor.
Pre-Bid Conference and Site Tour not mandatory.
PA000000403
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation Information Title "Repost" Samish River Unit Tree and Shrub Planting Project Reference

State Government of Washington

Due by 10/30/2026

Follow Methow Valley Road Pile Burn Active Contract Opportunity Notice ID 1167022 Related

AGRICULTURE, DEPARTMENT OF

Due by 9/23/2026

Follow Cle Elum 1-90 Phase 3 Planting Active Contract Opportunity Notice ID 1120177

AGRICULTURE, DEPARTMENT OF

Due by 9/24/2026

Follow Clear & Clearwater Creek Restoration Active Contract Opportunity Notice ID 1169181 Related

AGRICULTURE, DEPARTMENT OF

Due by 9/24/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.