Argon Piping Supply, Installation and Testing

Agency: ENERGY, DEPARTMENT OF
State: South Dakota
Type of Government: Federal
FSC Category:
  • 47 - Pipe, Tubing, Hose, Fittings
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 238990 - All Other Specialty Trade Contractors
  • 541380 - Testing Laboratories
Posted Date: Apr 1, 2026
Due Date: Apr 30, 2026
Solicitation No: 04012026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
Argon Piping Supply, Installation and Testing
Active
Contract Opportunity
Notice ID
04012026
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Apr 01, 2026 04:29 pm CDT
  • Original Response Date: Apr 30, 2026 03:00 pm CDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: May 15, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Lead , SD
    USA
Description

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.



This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above


Attachments/Links
Contact Information
Contracting Office Address
  • Kirk Rd. & Pine St.
  • Batavia , IL 60510
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Apr 01, 2026 04:29 pm CDTSources Sought (Original)
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now