Area 3 Turning Radii Improvements

Agency: State Government of Louisiana
State: Louisiana
Type of Government: State & Local
Posted Date: May 11, 2026
Due Date: Jun 2, 2026
Solicitation No: 923456-26-15-1
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number Description Date Issued Bid Open Date/Time
923456-26-15-1
Area 3 Turning Radii Improvements

Original: 923456-26-15-1
05/11/2026 06/02/2026
2:00:00 PM CT

Contact Information for Bid # 923456-26-15-1

Department Non State - St. Tammany Parish Government
Section Purchasing
Dept Code 923456
Contact Shawn Hoover
Address
21454 Koop Dr
Suite 2F
Mandeville, LA 70471
Phone 985-898-2520
Fax 985-898-5227
Email sdhoover@stpgov.org

Attachment Preview

ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
NOTICE OF QUOTE REQUEST
ST. TAMMANY PARISH
Sealed quotes will be received by the Department of Procurement until 2:00 p.m., Tuesday, June
2, 2026, and then opened at that time by the Procurement Staff for the following project:
Quote # 26-15-1 – Area 3 Turning Radii Improvements
This Quote package is available online at www.bidexpress.com or LaPAC
https://wwwcfprd.doa.louisiana.gov/osp/lapac/dspBid.cfm?search=department&term=185.It is
the Vendor’s responsibility to check Bid Express or LaPAC frequently for any possible addenda
that may be issued. The Parish is not responsible for a vendor’s failure to download any addenda
documents required to complete a submission.
The project classification is:
Highway, Street and Bridge Construction
Paper Quotes must be sealed. In addition, the outside of the envelope, box, or package containing
the Quote should be marked with the following information. Name and Address, State
Contractor’s License Number (if the estimated cost of the work is $50k or more), Quote Number,
and the Quote Name. Quotes submitted without this information may be deemed non-responsive.
Quotes will be received by the St. Tammany Parish Government Department of Procurement,
located at 21454 Koop Dr., Suite 2F, Mandeville LA. 70471 from each quoter or his agent and
given a written receipt, by certified mail with return receipt requested, or electronically at
www.bidexpress.com.
The Procurement Department can be contacted by telephone at (985) 898-2520, or via e-mail at
Procurement@stpgov.org. St. Tammany Parish Government reserves the right to reject any or all
quotes and to waive informalities.
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA| 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2026.1
QUOTE REQUEST
ST. TAMMANY PARISH GOVERNMENT
AREA 3 TURNING RADII IMPROVEMENTS
Quote Number: 26-15-1
Quote Deadline:Tuesday, June 2, 2026
May 7, 2026
TABLE OF CONTENTS
PART I: OVERVIEW ................................................................................................................. 1
1.1 Background ..................................................................................................................1
1.2 Definitions ....................................................................................................................1
1.3 Schedule of Events.......................................................................................................1
1.4 Quote Submittal............................................................................................................2
PART II: SCOPE OF WORK/SERVICES .................................................................................. 3
2.1 Scope of work/Services ................................................................................................3
2.2 Period of Agreement.....................................................................................................3
2.3 Price Schedule .............................................................................................................3
2.4 Deliverables..................................................................................................................3
2.5 Licensing Required.......................................................................................................4
PART III: EVALUATION ............................................................................................................ 4
PART IV: PERFORMANCE STANDARDS................................................................................ 4
4.1 Performance Requirements..........................................................................................4
4.1.1 Shop drawings, Brochures and Samples .............................................................. 4
4.1.2 Record Drawings .................................................................................................. 5
4.1.3 Progress of Work .................................................................................................. 5
4.1.4 The Parish’s Right to Proceed with Portions of the Work ...................................... 6
4.1.5 Time of Completion............................................................................................... 7
4.1.6 Extensions of Time for Change Orders ................................................................. 8
4.1.7 Liquidated Damages ............................................................................................. 8
4.1.8 Labor, Materials, Equipment, Supervision, Permits and Taxes ............................. 9
4.1.9 Quantities of Estimate, Changes in Quantities, Extra Work..................................11
4.1.10 Injuries to Persons and Property ..........................................................................13
4.1.11 Sanitary Provisions ..............................................................................................16
4.1.12 Rights of Way ......................................................................................................16
4.1.13 Protection and Restoration of Property and Landscape .......................................16
4.1.14 Contractor’s Responsibility for Work ....................................................................17
4.1.15 Tests and Inspections; Correction and Removal of Defective Work .....................17
4.1.16 Subsurface Conditions .........................................................................................19
4.1.17 Removal and Disposal of Structures and Obstructions ........................................19
4.1.18 The Parish’s Right to Occupancy .........................................................................21
4.1.19 Survey Horizontal and Vertical Control ................................................................21
4.2 Compliance With Applicable Laws..............................................................................21
4.3 Site Visitation..............................................................................................................21
PART V: GENERAL PROVISIONS ..........................................................................................22
5.1 Legibility/Clarity ..........................................................................................................22
5.2 Confidential Information, Trade Secrets, and Proprietary Information .........................22
5.3 Quote Clarifications Prior to Submittal ........................................................................23
5.3.1 Pre-Quote Conference .........................................................................................23
5.3.2 Respondent Inquiry Periods.................................................................................23
5.4 Errors and Omissions in Quote...................................................................................24
5.5 Performance Bond......................................................................................................24
5.6 Changes, Addenda, Withdrawals................................................................................25
5.7 Withdrawal of Quote ...................................................................................................25
5.8 Material in the Quote Request ....................................................................................25
5.9 Waiver of Administrative Informalities .........................................................................26
5.10 Quote Rejection..........................................................................................................26
5.11 Ownership of Quote....................................................................................................26
5.12 Cost of Offer Preparation............................................................................................26
5.13 Non-negotiable Contract Terms..................................................................................26
5.14 Taxes .........................................................................................................................26
5.15 Quote Validity .............................................................................................................26
5.16 Prime Contractor Responsibilities ...............................................................................26
5.17 Use of Subcontractors ................................................................................................27
5.18 Written or Oral Discussions/Presentations..................................................................27
5.19 Acceptance of Quote Content.....................................................................................28
5.20 Evaluation and Selection ............................................................................................28
5.21 Contract Negotiations .................................................................................................28
5.22 Contract Award and Execution ...................................................................................28
5.23 Notice of Intent to Award ............................................................................................28
5.24 Affidavits.....................................................................................................................29
5.25 Insurance Requirements.............................................................................................29
5.26 Subcontractor Insurance.............................................................................................33
5.27 Indemnification and Limitation of Liability....................................................................34
5.27.1 Duty to Defend…………………………………………………………………………..34
5.27.2 Contractor Liabilitiy……………………………………………………………………...34
5.27.3 Force Majeure…………………………………………………………………………...34
5.27.4 Indemnification…………………………………………………………………………...34
5.27.5 Intellectual Property Indemnification………………………………………………......34
5.28 Payment .....................................................................................................................35
5.28.1 Payment for Services...........................................................................................35
5.28.2 Acceptance and Final Payment(s) .......................................................................36
5.29 Termination ................................................................................................................38
5.29.1 Termination of the Contract for Cause .................................................................38
5.29.2 Termination of the Contract for Convenience .......................................................38
5.29.3 Termination for Non-Appropriation of Funds ........................................................38
5.29.4 Effects of Termination ..........................................................................................38
5.29.5 Default of Contractor............................................................................................38
5.30 Assignment.................................................................................................................40
5.31 No Guarantee of Quantities ........................................................................................40
5.32 Audit of Records.........................................................................................................40
5.33 Civil Rights Compliance..............................................................................................40
5.34 Record Retention........................................................................................................40
5.35 Record Ownership......................................................................................................40
5.36 Content of Contract/ Order of Precedence..................................................................40
5.37 Contract Changes.......................................................................................................40
5.38 Substitution of Personnel............................................................................................41
5.39 Governing Law ...........................................................................................................41
5.40 Anti-Kickback Clause..................................................................................................41
5.41 Clean Air Act ..............................................................................................................41
5.42 Energy Policy and Conservation Act...........................................................................41
5.43 Clean Water Act .........................................................................................................41
5.44 Anti-Lobbying and Debarment Act ..............................................................................42
Quote Package includes the following Attachments:
Attachment “A” – Pricing Sheet, Unit Price Form, and Project Specifications
Attachment “B” – Sample Contract
Attachment “C” – Insurance Requirements
Attachment “D” – Affidavits
Attachment “E” – Sample Corporate Resolution
Attachment “F” – Sample Certificate of Insurance
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Ama Park Renovations Department: Parks and Recreation, Procurement Category: All RFPs / Advertisements

ST. Charles Parish

Bid Due: 6/23/2026

Bid Number Description Date Issued Bid Open Date/Time 50018-260028 Concrete Repair Project Phase

State Government of Louisiana

Bid Due: 6/16/2026

Event: ITB - St. Bernard Nbhd Campus Stormwater Resilience Project Event: 4692-0 Reference:

City of New Orleans

Bid Due: 6/04/2026

WATER MAIN REPLACEMENTS AND EXTENSIONS AT SCATTERD LOCATIONS THROUGHOUT ORLEANS PARISH Contract #:

Sewerage and Water Board of New Orleans

Bid Due: 7/08/2026