| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 26, 2026 |
| Due Date: | Mar 9, 2026 |
| Solicitation No: | 34544 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
In 2024, the Town of Mansfield contracted with Design Learned Inc. (DLI) to provide a study with conceptual design to determine the size of the replacement Animal Control facility needed. This study addressed the current and future Animal Control needs of the Town while taking into account new state Animal Shelter requirements that go in into effect on January 1, 2029. The study determined the required size of the facility needed with a conceptual floor plan and building design. In 2025 the Town of Mansfield contracted with Jacobson Engineering to conduct a feasibility study to determine if the new facility would be able to be built on the existing site currently occupied by the Town of Mansfield Animal Control Shelter. The DLI Study and Jacobson Engineering Study Development Documents are included as Appendix A.
Sheri Baczanski 4 SOUTH EAGLEVILLE ROAD STORRS CT, 06268 United States Tel: 8604293331 Fax: baczanskise@mansfieldct.org
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: PW2026-01 Bid Title: REQUEST FOR QUALIFICATIONS Replacement of Bridge No 06956
Town of Clinton
Bid Due: 8/27/2026
Heroes Tunnel Proj.167-108 & 92-689: Route 15 Interchange 46 Improvements Start Date :
State Government of Connecticut
Bid Due: 8/26/2026
RFP #2026-01 Masuk High School Softball Field Renovation Project PROJECT OVERVIEW. The Monroe
State Government of Connecticut
Bid Due: 8/19/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
City of Stamford
Bid Due: 8/20/2026