ANCA Annual Preventative Maintenance
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Oklahoma |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Aug 15, 2026 |
| Due Date: | Aug 18, 2026 |
| Solicitation No: | Serv_C26-122 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Aug 14, 2026 03:40 pm CDT
- Original Response Date: Aug 18, 2026 10:00 am CDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Sep 02, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: J039 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT
-
NAICS Code:
- 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
-
Place of Performance:
Tinker AFB , OK 73145USA
The Air Force intends to solicit and issue a sole source contract to ANCA CNC Machines under the authority of RFO 6.103-1(b) for the following:
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform annual Preventive Maintenance (PM), Calibration, and Certification on the TX7 LINEAR equipment. The ultimate objective is to ensure the equipment operates continuously at Original Equipment Manufacturer (OEM) specifications, thereby preventing work stoppages and enabling the supported shops to accurately complete their production jobs at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix.
Estimated Period of Performance: 1 September 2026 – 31 August 2031
System for Award Management (SAM) is required to receive any award. Contractors can register electronically at https://www.sam.gov/portal/public/SAM/. The NAICS code for this requirement is 811310 with a size standard of $12.5M
Interested persons may identify their interest and capability to respond to the requirement by submitting a proposal. Electronic procedures will be used for this solicitation through Beta.sam.gov at https://sam.gov/content/home. No telephone requests. See Note 22. Authority is 10 USC 2304 (c)(1).
Foreign Participation: No
For further information contact:
Sheridan Robison, Contracting Officer
- CP 405 734 9107 3001 STAFF DR STE 2S76
- TINKER AFB , OK 73145-3303
- USA
- Sheridan Robison
- Sheridan.robison@us.af.mil
- Aug 14, 2026 03:40 pm CDTPresolicitation (Original)
See Also
Follow Repair of B-2 Wingtip Power Supply Active Contract Opportunity Notice ID FA811726RB008
DEPT OF DEFENSE
Due by 9/16/2026
Bid ID: IFB 27-508 Addendum: 0 Bid Due Date: 9/23/2026 Description: John Deere
City of Tulsa
Due by 9/23/2026
Follow Makino CNC Machines Preventative Maintenance Active Contract Opportunity Notice ID FA812526Q0074 Related
DEPT OF DEFENSE
Follow HVAC Replacement/Repair Base-wide Active Contract Opportunity Notice ID W50S8U-26-R-A014 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 9/16/2026