AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 16, 2026 |
| Due Date: | Aug 4, 2026 |
| Solicitation No: | FA822426Q0003_1 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jul 16, 2026 11:06 am MDT
- Original Date Offers Due: Aug 04, 2026 12:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Aug 19, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: N041 - INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Hill Air Force Base , UT 84056USA
The Air Force is soliciting a 100% Small Business Set-Aside for a contractor to install and integrate a Government-furnished compressor and cooling system at Hill AFB, Utah.
Key Project Details:
-
The Work: The contractor will provide the labor, tools, and standard materials (piping, wiring, epoxy) to physically install two government-owned Ingersoll Rand compressors, dryers, and glycol coolers into Building 269 and connect them to the base's 460V power and air loop.
-
The Constraints: All primary machinery is Government Furnished Property (GFP). Facility drawings are Controlled Unclassified Information (CUI) requiring vetted SAM.gov access. Davis-Bacon prevailing wages apply.
-
Critical Deadlines:
-
Site Visit RSVP Deadline: 20 July 2026
-
Pre-Quote Site Visit: 23 July 2026
-
Contractor Q&A Deadline: 27 July 2026
-
Quotes Due: 04 August 2026
-
Mandatory Completion: On or before 17 August 2026 (Strict deadline to preserve the manufacturer's warranty).
-
- BLDG 1289 CP 801 777-8958 6038 ASPEN AVE
- HILL AFB , UT 84056-5805
- USA
- Willie Little
- willie.little@us.af.mil
- Phone Number 801-586-6837
- Joshua Akinwande
- joshua.akinwande.2@us.af.mil
- Phone Number 801-882-8454
- Jul 16, 2026 11:06 am MDTCombined Synopsis/Solicitation (Original)
Related Document
| Jul 30, 2026 | [Combined Synopsis/Solicitation (Updated)] AMXG Group Air Compressors, Cooling System & Pump Stations INSTALLAION |
See Also
Project: Water Leak Detection Systems and Installation Services Ref. #: KK27-2 Department: Division
State Government of Utah
Due by 10/02/2026
Project: Park City Transit V2X Equipment and Install Ref. #: PCMC27031 - TRA
State Government of Utah
Due by 9/24/2026
Project: Kaysville City- Police Department Emergency Operations Center Audiovisual System Replacement Ref. #:
State Government of Utah
Due by 9/30/2026