Amerine Station Road Extension Project
| Agency: | City of Maryville |
|---|---|
| State: | Tennessee |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 10, 2026 |
| Due Date: | Sep 1, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Amerine Station Road Extension Project
A project to extend the existing Amerine Station Road approximately 650 feet to the relocated Woodland Acres Road currently under construction.
Sealed bids will be received by the Purchasing Agent at the City of Maryville Municipal Building in the Engineering Conference Room (lower level) - 416 W. Broadway Ave., Maryville, Tennessee, 37801, until 2:00 p.m., local time, September 1, 2026, at which time bids will be publicly opened and read aloud. Sealed bids shall be a paper copy of the completed bid documents.
Amerine Station Extension Plan Set #01-27
Amerine Station Extension Bid Book #01-27
A project to extend the existing Amerine Station Road approximately 650 feet to the relocated Woodland Acres Road currently under construction.
Sealed bids will be received by the Purchasing Agent at the City of Maryville Municipal Building in the Engineering Conference Room (lower level) - 416 W. Broadway Ave., Maryville, Tennessee, 37801, until 2:00 p.m., local time, September 1, 2026, at which time bids will be publicly opened and read aloud. Sealed bids shall be a paper copy of the completed bid documents.
Amerine Station Extension Plan Set #01-27
Amerine Station Extension Bid Book #01-27
Attachment Preview
AMERINE STATION ROAD EXTENSION
2026
CITY OF MARYVILLE, TENNESSEE
ENGINEERING & PUBLIC WORKS DEPARTMENT
CONSTRUCTION PLANS
MAYOR:
ANDY WHITE
Vice MAYOR:
FRED METZ
COUNCIL MEMBERS:
TOMMY HUNT
SARAH HERRON
DREW MILES
PROJECT NO. 2017-0220-01
CITY MANAGER:
GREG McCLAIN
PUBLIC WORKS:
BRIAN BOONE, P.E.
ENGINEERING:
CHUCK ROWAN, P.E.
PROJECT LOCATION
BLOUNT CO.
204 W. Bessemer Street Alcoa, TN. 37701 ph. 865.980.3500
NO EXCLUSIONS
NO EQUATIONS
PROJECT
LOCATION
Index Of Sheets (Const.)
SEE SHEET NO. 2
N
0
4000 8000 12000
SCALE : 1" = 4000'
RIGHT-OF-WAY PROJECT LENGTH = 0.125 MILES
SPECIAL NOTES
PROPOSALS MAY BE REJECTED BY THE CITY OF MARYVILLE IF
ANY OF THE UNIT PRICES CONTAINED THEREIN ARE OBVIOUSLY
UNBALANCED, EITHER EXCESSIVE OR BELOW.
THIS PROJECT TO BE CONSTRUCTED UNDER THE STANDARD
SPECIFICATIONS OF THE TENNESSEE DEPARTMENT OF
TRANSPORTATION DATED JANUARY 1, 2021 INCLUDING ALL THE
LATEST SUPPLEMENTS AND ADDITIONAL SPECIFICATIONS AND
SPECIAL PROVISIONS CONTAINED IN THE PLANS AND IN THE
PROPOSAL CONTRACT.
SURVEY PERFORMED BY C2RL ENGINEERS, INC. ON 3/11/16
GENERAL NOTES
1. CONTRACTOR SHALL HAVE AN APPROVED STAMPED AND SIGNED COPY OF THE SITE PLANS ON SITE TO
WORK FROM AT ALL TIMES. THESE PLANS WILL HAVE THE RED APPROVAL STAMP FROM THE CITY OF
MARYVILLE AND WILL BE SIGNED AND DATED.
GRADING
1. ANY AREA THAT IS DISTURBED OUTSIDE LIMITS OF CONSTRUCTION DURING THE LIFE OF THIS PROJECT
SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE.
2. THE CONTRACTOR SHALL NOT DISPOSE OF ANY MATERIAL IN A REGULATORY FLOOD WAY AS DEFINED
BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY WITHOUT APPROVAL BY SAME. ALL MATERIAL
SHALL BE DISPOSED OF IN UPLAND (NON-WETLAND) AREAS AND ABOVE ORDINARY HIGH WATER OF ANY
ADJACENT WATERCOURSE. THIS DOES NOT ELIMINATE THE NEED TO OBTAIN ANY OTHER LICENSES OR
PERMITS THAT MAY BE REQUIRED BY ANY OTHER FEDERAL, STATE OR LOCAL AGENCY.
3. NO SITE GRADING CAN COMMENCE UNTIL A GRADING PERMIT HAS BEEN ISSUED AND NO GRADING
PERMIT WILL BE ISSUED UNTIL ALL EROSION AND SEDIMENT CONTROL IS IN PLACE ACCORDING TO THE
SITE SPECIFIC SWPPP, AND PASSES INSPECTION. CONTACT DOUG CHAPMAN FOR INSPECTION AT (865)
273-3518.
4. TOTAL DISTURBED AREA - 1.67 ACRES
SEEDING & SODDING
1. SOD SHALL BE PLACED AT LOCATIONS SHOWN ON THE PLANS TO PREVENT DAMAGE TO ADJACENT
FACILITIES AND PROPERTY DUE TO EROSION ON ALL NEWLY GRADED CUT & FILL SLOPES AS WORK
PROGRESSES.
2. ITEM No. COM 801-01, SEEDING (WITH MULCH), SHALL BE USED WHERE EROSION CONTROL BLANKET OR
SOD ARE NOT APPLIED.
3. A CITY OF MARYVILLE INSPECTOR IS TO BE ONSITE WHEN SEEDING AND MULCHING TAKE PLACE. PROOF
OF PURCHASE SHOULD BE RETAINED TO SHOW THAT THE MIXTURE AMOUNTS AND SEED AND STRAW
ARE IN ACCORDANCE WITH THE TDEC EROSION AND SEDIMENT CONTROL MANUAL.
DRAINAGE
1. THE CONTRACTOR SHALL SHAPE DITCHES TO THE SPECIFIED DESIGN. THIS WORK WILL NOT BE
MEASURED AND PAID FOR DIRECTLY, BUT THE COST WILL BE INCLUDED IN THE COST OF OTHER ITEMS.
2. EXCAVATION BEDDING AND BACKFILL FOR PIPE WILL NOT BE MEASURED AND PAID FOR DIRECTLY, BUT
WILL BE INCLUDED IN THE PRICE BID PER LINEAR FOOT OF PIPE (PIPE CULVERTS, STORM SEWERS,
CONDUITS, ALL OTHER CULVERTS AND MINOR STRUCTURES).
3. THE CUTTING OF INLET AND OUTLET DITCHES WHERE SHOWN ON PLANS OR AS DIRECTED BY THE
ENGINEER WILL BE MEASURED AND PAID FOR AS ITEM No. 203.01 ROAD AND DRAINAGE EXCAVATION
(UNCLASSIFIED).
4. WHERE A CULVERT PIPE IS MOVED TO A NEW LOCATION OTHER THAN THAT SHOWN ON THE PLANS,
INCREASING OR DECREASING THE AMOUNT OF CULVERT EXCAVATION, NO INCREASE OR DECREASE IN
THE AMOUNT OF PAYMENT WILL BE MADE DUE TO SUCH CHANGE.
5. DURING CONSTRUCTION OF DRAINAGE STRUCTURES ALL COST ASSOCIATED WITH MAINTAINING THE
FLOW OF WATER AND TRAFFIC, AT THESE STRUCTURES, DURING THE PHASED CONSTRUCTION OF THIS
PROJECT ARE TO BE INCLUDED IN THE UNIT PRICE OF THE DRAINAGE STRUCTURES AND TRAFFIC
CONTROL ITEMS.
6. ALL STORMWATER PIPES AND STRUCTURES REQUIRE INSPECTION BEFORE COVERING. CONTACT DOUG
CHAPMAN FOR INSPECTION AT (865) 273-3518.
7. ALL STORMWATER CONSTRUCTION SHALL CONFORM TO MARYVILLE LAND DEVELOPMENT AND PUBLIC
WORKS STANDARDS.
8. AS-BUILT DRAWINGS WILL BE REQUIRED FOR ALL STORMWATER INFRASTRUCTURE INSTALLED AS PART
OF THIS PROJECT. AS-BUILT DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED WITH A COMPLETED
AS-BUILT CHECKLIST FOUND IN APPENDIX D, SHEETS D-1 THROUGH D-3 OF THE CITY OF MARYVILLE
STORMWATER MANAGEMENT MANUAL.
MISCELLANEOUS
1. NOTHING IN THE GENERAL NOTES OR SPECIAL PROVISIONS SHALL RELIEVE THE CONTRACTOR FROM HIS
RESPONSIBILITIES TOWARD THE SAFETY AND CONVENIENCE OF THE GENERAL PUBLIC AND THE
RESIDENTS ALONG THE PROPOSED CONSTRUCTION AREA.
FINAL PAVEMENT MARKING
1. PERMANENT PAVEMENT LINE MARKINGS SHALL BE 4" SPRAY THERMOPLASTIC (40 mil.) INSTALLED TO
PERMANENT STANDARDS AT THE END OF EACH DAY'S WORK. SHORT UNMARKED SECTIONS SHALL NOT
BE ALLOWED. PAVEMENT MARKINGS WILL BE MEASURED AND PAID FOR UNDER ITEM No. COM 716-13.06,
SPRAY THERMO PVMT MRKNG (40 mil.) (4" LINE), THE CONTRACTOR SHALL HAVE THE OPTION OF USING
REFLECTORIZED PAINT INSTALLED TO PERMANENT STANDARDS AT THE END OF EACH DAY'S WORK AND
THEN INSTALLING THE PERMANENT MARKINGS AFTER THE PAVING OPERATION IS COMPLETED. THE
TEMPORARY MARKINGS FOR THE FINAL SURFACE WILL NOT BE MEASURED AND PAID FOR DIRECTLY, BUT
THE COSTS ARE TO BE INCLUDED IN THE UNIT PRICE BID FOR THE PAVEMENT MARKINGS.
SIGNING
1. THE LETTERS, DIGITS, ARROWS, BORDERS, AND ALPHABET ACCESSORIES ON ALL FLAT SHEET SIGNS
SHALL BE APPLIED BY SILK SCREENING PROCESS, EXCEPT THAT CUT DIRECT APPLIED COPY SHALL BE
USED ON ALL FLAT SHEET SIGNS WITH A GREEN BACKGROUND. THE LETTERS, DIGITS, ARROWS,
BORDERS, AND ALPHABET ACCESSORIES ON ALL EXTRUDED PANEL SIGNS SHALL BE DEMOUNTABLE AND
ATTACHED TO THE SIGN FACE, AS OUTLINED IN THE STANDARD SPECIFICATIONS.
2. AFTER THE SIGN LOCATIONS HAVE BEEN STAKED, BUT PRIOR TO ORDERING ANY MATERIAL FOR THE
SUPPORTS, THERE SHALL BE A FIELD INSPECTION AND APPROVAL BY THE CITY OF MARYVILLE.
UTILITY
1. THE LOCATIONS OF UTILITIES SHOWN WITHIN THESE PLANS ARE APPROXIMATE ONLY. EXACT LOCATIONS
SHALL BE DETERMINED IN THE FIELD BY CONTACTING THE UTILITY COMPANIES INVOLVED. NOTIFICATION
BY CALLING TENNESSEE ONE CALL SYSTEM, INC. AT 1-800-351-1111 AS REQUIRED BY TCA 65-31-106 WILL
BE REQUIRED.
2. UNLESS OTHERWISE NOTED, ALL UTILITY ADJUSTMENTS WILL BE PERFORMED BY THE UTILITY OR IT'S
REPRESENTATIVE. THE CONTRACTOR AND UTILITY OWNERS WILL BE REQUIRED TO COOPERATE WITH
EACH OTHER IN ORDER TO EXPEDITE THE WORK REQUIRED.
3. THE CONTRACTOR WILL PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD EXISTING
UTILITIES FROM DAMAGE DURING CONSTRUCTION OF THIS PROJECT. IN THE EVENT THAT SPECIAL
EQUIPMENT IS REQUIRED TO WORK OVER AND AROUND THE UTILITIES, THE CONTRACTOR WILL BE
REQUIRED TO FURNISH SUCH EQUIPMENT. THE COST OF PROTECTING UTILITIES FROM DAMAGE AND
FURNISHING SPECIAL EQUIPMENT WILL BE INCLUDED IN THE PRICE BID FOR OTHER ITEMS OF
CONSTRUCTION.
4. PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR CONTACTING
OWNERS OF ALL AFFECTED UTILITIES IN ORDER TO DETERMINE THE EXTENT TO WHICH UTILITY
RELOCATIONS AND/OR ADJUSTMENTS WILL HAVE UPON THE SCHEDULE OF WORK FOR THE PROJECT.
WHILE SOME WORK MAY BE REQUIRED 'AROUND' UTILITY FACILITIES THAT WILL REMAIN IN PLACE, OTHER
UTILITY FACILITIES MAY NEED TO BE ADJUSTED CONCURRENTLY WITH THE CONTRACTOR'S
OPERATIONS. ADVANCE CLEAR CUTTING MAY BE REQUIRED BY THE ENGINEER AT ANY LOCATION WHERE
CLEARING IS CALLED FOR IN THE SPECIFICATIONS AND CLEAR CUTTING IS NECESSARY FOR A UTILITY
RELOCATION. ANY ADDITIONAL COST WILL BE INCLUDED IN THE UNIT PRICE BID FOR THE CLEARING ITEM
SPECIFIED IN THE PLANS.
5. FOR THE INSTALLATION OF BURIED UTILITIES (PIPES AND CABLES), TRENCHES SHALL BE BACKFILLED
DAILY AS CONSTRUCTION PROCEEDS. BACKFILLED TRENCHES SHALL BE SEEDED AND MULCHED OR
SODDED DAILY IF POSSIBLE, BUT NO LATER THAN SEVEN (7) DAYS AFTER BEING BACKFILLED, AND
TEMPORARY SPOIL OF EXCAVATED EARTH SHALL BE LOCATED WITHIN EROSION PREVENTION AND
SEDIMENT CONTROL (ESPC) MEASURES OR RECEIVE SEPARATE EPSC MEASURES. IF TRENCHES ARE
NOT BACKFILLED OVERNIGHT, APPROPRIATE ESPC MEASURES WILL BE INSTALLED BY THE CONTRACTOR
UNTIL SUCH TIME AS THE TRENCH IS BACKFILLED.
6. AS-BUILT DRAWINGS WILL BE REQUIRED FOR ALL CITY OF MARYVILLE UTILITIES RELOCATED OR
INSTALLED AS A PART OF THIS PROJECT.
A GRADING PERMIT WILL NOT BE ISSUED UNTIL A NOTICE OF
COVERAGE FROM THE TENNESSEE DEPARTMENT OF
ENVIRONMENT AND CONSERVATION (TDEC) HAS BEEN ISSUED.
PROJECT CONTACTS
OWNER
CITY OF MARYVILLE
BRIAN BOONE, P.E.
416 W. BROADWAY AVE.
MARYVILLE, TN 37801
(865) 273-3500
ELECTRIC
CITY OF MARYVILLE
JAMES BOND
332 HOME AVE.
MARYVILLE, TN 37801
(865) 273-3328
STORMWATER
CITY OF MARYVILLE
JANA BROWN, P.E.
416 W. BROADWAY AVE.
MARYVILLE, TN 37801
(865) 273-3512
TRAFFIC / ROADS
CITY OF MARYVILLE
CHUCK ROWAN, P.E.
416 W. BROADWAY AVE.
MARYVILLE, TN 37801
(865) 273-3506
FIRE DEPARTMENT
CITY OF MARYVILLE
JOHN CRAW
402 W. BROADWAY AVE.
MARYVILLE, TN 37801
(865) 273-3615
COMMUNICATIONS
AT&T
GREG PEARMAIN
9733 PARKSIDE DR.
KNOXVILLE, TN 37922
(865) 335-5971
NATURAL GAS
ATMOS ENERGY
SETH BRADBURN
2833 W. MARKET ST.
JOHNSON CITY, TN 37604
(423) 440-4521
WATER / SEWER
CITY OF MARYVILLE
TREVOR HENDRIX, P.E.
332 HOME AVE.
MARYVILLE, TN 37801
(865) 273-3359
DEV. SERVICES / PLANNING
CITY OF MARYVILLE
VALENTINA AMON
416 W. BROADWAY AVE.
MARYVILLE, TN 37801
(865) 273-3509
LEGEND
EXISTING
W
900
B.M.
IRON ROD FOUND
IRON PIPE FOUND
AXLE FOUND
UTILITY POLE
GUY
TELEPHONE PEDESTAL
VALVE
WATER METER
FIRE HYDRANT
HEADWALL
MANHOLE
CLEANOUT
TREE
TREE LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
WATER LINE
SANITARY SEWER LINE
REINFORCED CONCRETE PIPE (STORM)
PROPERTY LINE
CHAIN LINK FENCE
WOODEN FENCE
OVERHEAD POWER LINE
BENCH MARK
NEW
RCP
CD
FR
IP
OP
SF
CE
FIRE HYDRANT (SEE CITY OF MARYVILLE STANDARD WATER DETAILS)
WATER VALVE
A1
STORM MANHOLE
19
A7
CATCH BASIN
19
K7
CONCRETE ENDWALL
19
REINFORCED CONCRETE PIPE (STORM)
G1
ROCK CHECK DAM
20
A1
FILTER RING
20
A11
INLET PROTECTION
20
G11
OUTLET PROTECTION
20
A6
TEMPORARY SILT FENCE
20
G6
CONSTRUCTION ENTRANCE / EXIT
20
SOD
INDEX
1 TITLE SHEET
2 INDEX, LEGEND, GENERAL NOTES
3 ESTIMATED ROADWAY QUANTITIES
4 TYPICAL SECTIONS
5 PROPERTY MAP
6 PRESENT LAYOUT
7 PLAN & PROFILE
8 GRADING & DRAINAGE
9 UTILITIES - WATER
9A UTILITIES - SANITARY SEWER
10 EROSION PREVENTION & SEDIMENT CONTROL NOTES
11 EROSION PREVENTION & SEDIMENT CONTROL PLAN - INITIAL
12 EROSION PREVENTION & SEDIMENT CONTROL PLAN - FINAL
13 SIGNING & PAVEMENT MARKING
14 PAVEMENT EDGE DROP-OFF & TRAFFIC CONTROL NOTES
15 TEMPORARY TRAFFIC CONTROL PLAN
16 ROADWAY CROSS SECTIONS - STA. 1+28.12 to STA. 5+00
17 ROADWAY CROSS SECTIONS - STA. 5+50 to STA. 8+03.33
18 ROADWAY DETAILS
19 DRAINAGE DETAILS
20 EROSION CONTROL DETAILS
21 CITY OF MARYVILLE STORMWATER CONSTRUCTION DETAILS
22 CITY OF MARYVILLE STANDARD DETAIL DRAWINGS - WATER
0224
9.9.25
TCC
JRW
2
CATCH BASINS AND MANHOLES
STRUCTURE
NAME
HW-1
MH-2
CI-3
CI-4
HW-5
CI-6
CI-7
HW-8
STATION
2+07.58
2+99.77
3+05.69
3+05.69
3+00
6+15.27
6+16.27
6+16.55
OFFSET
(FT)
61.14 LT
32.9 LT
15.75 LT
15.75 RT
30 RT
15.75 LT
15.75 RT
31.33 RT
GRATE/TOP
ELEV.
1016.0
1016.6
1016.6
1021.4
1021.4
INVERT
ELEV.
1010.7
1011.3
1011.8
1012.6
1013.5
1016.4
1016.8
1017.1
STORM DRAINAGE PIPES
FROM
STRUCTURE OUTLET
NAME
ELEV.
MH-2
1011.3
CI-3
1011.8
CI-4
1012.6
HW-5
1013.5
CI-6
1016.4
CI-7
1016.8
HW-8
1017.1
TO
STRUCTURE
NAME
HW-1
MH-2
CI-3
CI-4
CI-3
CI-6
CI-7
INLET
ELEV.
1010.7
1011.4
1012.3
1012.7
1012.3
1016.5
1016.9
%
GRADE
0.60
2.30
0.91
5.93
1.32
0.91
1.47
LENGTH
(FT)
100.5
17.4
33.0
13.5
311.4
33.0
13.6
EARTHWORK BALANCE
COMPUTATIONS
ROAD & DRAINAGE EXCAVATION (CUT)
570 CY
LESS TOPSOIL IN CUT AREAS (ASSUME 8" DEPTH)
390 CY
TOTAL EXCAVATED MATERIAL AVAILABLE FOR EMBANKMENT
180 CY
EMBANKMENT REQUIRED (FILL)
1341 CY
TOTAL EMBANKMENT REQUIRED (COMPACTED VOLUME)
TOTAL EMBANKMENT ADJUSTED FOR SHRINKAGE (20%)
PLUS TOPSOIL IN FILL AREAS
PLUS UNDERCUT OF UNDESIRABLE MATERIAL (ESTIMATED)
LESS EXCAVATED MATERIAL
1341 CY
1609 CY
857 CY
450 CY
180 CY
TOTAL BORROW MATERIAL NEEDED
2736 CY
NOTES
15, 16
17
18, 19
3, 7
3
3, 8
20
1
1
1, 9
1, 10
1, 11
12
13
14
14
2
6
6, 21
6
5
4
ESTIMATED ROADWAY QUANTITIES
ITEM NO.
DESCRIPTION
105-01
201-01
203-01
203-03
203-04
203-04.02
203-05
203-06
COM 209-08.01
209-08.03
209-08.07
COM 209-40.34
303-01
307-01.08
403-01
411-01.10
501-05.90
607-03.02
607-05.02
611-01.02
COM 611-07.01
611-13.02
701-01.01
701-02
COM 702-01.01
712-04.01
712-07.03
COM 713-11.01
713-16.20
713-16.21
716-02.05
716-02.06
COM 716-13.06
717-01
740-07.01
795-01.06
795-06.07
795-11.02
COM 801-01
801-03
803-01
CONSTRUCTION STAKES, LINES AND GRADES
CLEARING & GRUBBING
ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)
BORROW EXCAVATION (UNCLASSIFIED)
PLACING & SPREADING TOPSOIL
STRIPPING & STOCKPILE TOPSOIL
UNDERCUTTING
WATER
TEMPORARY FILTER BARRIER (FILTER RING)
TEMPORARY SILT FENCE (WITHOUT BACKING)
ROCK CHECK DAM
CATCH BASIN PROTECTION
MINERAL AGGREGATE, TYPE A BASE, GRADING D
ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2
BITUMINOUS MATERIAL FOR TACK COAT (TC)
ACS MIX (PG64-22) GRADING D
REMOVE EXISTING BITUMINOUS MATERIAL
18" CONCRETE PIPE CULVERT (CLASS III)
24" CONCRETE PIPE CULVERT (CLASS III)
MANHOLES > 4' - 8' DEPTH
CONCRETE PIPE ENDWALLS
CATCH BASINS, TYPE 13 > 4' - 8' DEPTH
CONCRETE SIDEWALK (4")
CONCRETE DRIVEWAY
EXTRUDED MOUNTABLE CURB (CITY OF MARYVILLE MODIFIED)
FLEXIBLE DRUMS (CHANNELIZING)
TEMPORARY BARRICADES (TYPE III)
"U" SECTION STEEL POSTS
SIGNS (STOP SIGN R1-1 30" x 30")
SIGNS (SPEED LIMIT SIGN R1-6 12" x 18")
PLASTIC PAVEMENT MARKING (STOP LINE)
PLASTIC PAVEMENT MARKING (TURN LANE ARROW)
SPRAY THERMO PVMT MRKING (40 mil) (4 IN LINE)
MOBILIZATION
GEOGRID REINFORCEMENT (BX1100 OR APPROVED EQUAL)
8 IN DIP SLIP JOINT WATERLINE
CONNECT TO 12 IN WATERLINE
FIRE HYDRANT ASSEMBLY
SEEDING (WITH MULCH)
WATER (SEEDING & MULCHING)
SODDING (NEW SOD)
ESTIMATED
QUANTITY
1
1
180
2736
1249
739
450
12
2
881
6
4
1695
297
2
197
1
405
118
1
3
4
6688
928
1258
23
32
2
1
1
27
2
2392
1
200
601
1
1
3030
6
300
UNITS
LS
AC
CY
CY
CY
CY
CY
MG
EACH
LF
EACH
EACH
TON
TON
TON
TON
LS
LF
LF
EACH
EACH
EACH
SF
SF
LF
EACH
LF
EACH
EACH
EACH
LF
EACH
LF
LS
SY
LF
EACH
EACH
SY
MG
SY
NOTES:
1. INCLUDES COST OF LABOR, EXCAVATION, AND ANY BEDDING MATERIAL NEEDED FOR COMPLETE INSTALLATION.
2. GEOGRID WILL BE INSTALLED IN LOCATIONS AND QUANTITIES AS DIRECTED BY THE ENGINEER ON SITE TO HELP STABILIZE POOR QUALITY SUBGRADE MATERIAL IN
LIEU OF UNDERCUTTING.
3. ALL EROSION PREVENTION & SEDIMENT CONTROL DEVICES SHALL BE INSTALLED ACCORDING TO THE TDEC EROSION AND SEDIMENT CONTROL HANDBOOK.
4. SOD TO BE PLACED IN DRAINAGE CHANNEL AS SHOWN IN THE TDEC EROSION AND SEDIMENT CONTROL HANDBOOK.
5. ALL DISTURBED AREAS NOT STABILIZED BY OTHER MEANS SHALL BE SEEDED & MULCHED.
6. ALL WATER AND SEWER CONSTRUCTION SHALL COMPLY WITH THE CITY OF MARYVILLE WATER AND SEWER DEPARTMENT RULES, REGULATIONS, RATES AND
POLICIES. 2019.
7. FILTER BARRIER TO BE STONE FILTER RING AS SHOWN IN DETAIL A1 ON SHEET 20.
8. CATCH BASIN PROTECTION TO BE AS SHOWN IN DETAIL A9 ON SHEET 20.
9. MANHOLE TO BE AS SHOWN IN DETAIL A1 ON SHEET 19.
10. ENDWALLS TO BE STRAIGHT TYPE AS SHOWN IN DETAIL K7 ON SHEET 19.
11. CATCH BASINS TO BE AS SHOWN IN DETAIL A7 ON SHEET 19.
12. CONCRETE SIDEWALK TO BE AS SHOWN IN DETAIL F11 ON SHEET 18.
13. EXTRUDED MOUNTABLE CURB SHALL BE CITY OF MARYVILLE MODIFIED AS SHOWN IN DETAIL A1 ON SHEET 18.
14. ITEMS 712-04.01 AND 712-07.03 SHALL BECOME THE PROPERTY OF THE CITY OF MARYVILLE AFTER CONSTRUCTION.
15. ALL BORROW EXCAVATION AREAS SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER BEFORE BEING USED FOR EMBANKMENT.
16. CONTRACTOR SHALL CONTACT THE ENGINEER TO AMEND THE SWPPP TO INCLUDE ALL BORROW AREAS.
17. TO INCLUDE REMOVAL AND STOCKFILE OF TOPSOIL.
18. ASSUMES 8" TOPSOIL DEPTH.
19. TOPSOIL PARTIALLY REMOVED DURING CONSTRUCTION OF TEMPORARY CONNECTOR ROAD. QUANTITY SHOWN HERE ASSUMES THAT MATERIAL HAS ALREADY
BEEN REMOVED AND STOCKPILED.
20. CONTRACTOR TO REMOVE EXISTING ASPHALT ROAD AND BASE STONE AS NEEDED FOR NEW CONSTRUCTION.
0224
9.9.25
TCC
JRW
3
4:1 FILL
2'
5'
2'
SIDEWALK
11' LANE
CL
11' CENTER TURN LANE
11' LANE
2'
5'
2'
SIDEWALK
2%
2%
2%
2%
3
T
EXISTING SUBGRADE & BINDER
TYPICAL OVERLAY SECTION - AMERINE STATION RD. - PHASE 2
STA. 1+28.12 to STA. 1+78.05
NOT TO SCALE
60" MIN. COVER
1'
8" WATERLINE
4:1 CUT
EXISTING GRADE (TYP.)
4:1 FILL
2'
5'
2'
SIDEWALK
11' LANE
CL
11' CENTER TURN LANE
11' LANE
2'
5'
2'
SIDEWALK
2%
2%
2%
2%
3
2
1
T
24" (MIN.) SUBGRADE
COMPACTED TO 98%
CONCRETE
CURB (TYP.)
A1
18
TYPICAL TANGENT SECTION - AMERINE STATION RD. - PHASE 2
STA. 1+78.05 to STA. 8+23.33
NOT TO SCALE
60" MIN. COVER
1'
8" WATERLINE
4:1 CUT
EXISTING GRADE (TYP.)
AMERINE STA. ROAD - PHASE 2
(FULL BUILD)
PAVING SCHEDULE
1
MINERAL AGGREGATE BASE @ 8" DEPTH
303-01 MINERAL AGGREGATE, TYPE "A" BASE, GRADING "D"
BINDER "B-M2" @ 3" DEPTH (APPROX. 113 LB/SY)
2
307-01.08 ASPHALT CONCRETE MIX (PG 64-22)
(BPMB-HM) GRADE B-M2
3
SURFACE 'D' @ 1 12" DEPTH (APPROX. 132.5 LB/SY)
411-01.10 ACS MIX (PG 64-22) GRADE D
TACK COAT 403-01 BITUMINOUS MATERIAL FOR TACK COAT
T
0.05-0.10 GAL/SY (GENERAL USE)
0.08-0.12 GAL/SY (MILLING-COLD PLANE)
0224
9.9.25
TCC
JRW
4
0+00
5+00
APARTMENTS
IR(O)
6N4.4495°'30'38" W
IR(O)
CHURCH OF GOD
MAP 058D, GRP B, PARCEL 31.00
PLAT 1683B
WDB 634, PG 346
0+50
6+00
1+00
MARYVILLE HOUSING AUTHORITY
MAP 047M, GRP B, PARCEL 13.02
WDB 675, PG 209
N 47°40'35" E
24.61'
DRAINAGE ESMT#1
3160.73 Sq. Feet
0.07 Acres
BARN
HOUSE
211.17'
IR(O)
WILLIAM TEFFETELLER
MAP 047M, GRP B, PARCEL 25.00
WDB 231, PG 275
1+50
S/W
SLOPE ESMT #3
97.16 Sq. Feet
2+00
N 38°07'56" E
3.02'
N 38°07'56" E
20.62'
DRAINAGE ESMT#3
1741.19 Sq. Feet
0.04 Acres
2+50
N 37°44'57" W
59.73'
S 37°44'57" E
95.84'
TRACT 2B
MATTHEW KOBOLAK
MAP 047M, GRP B, PARCEL 26.00
WDB 2629, PG 1622
S 32°01'51" E
5.88'
N 38°07'56" E
60.11'
N 54°08'33" W
35.61'
10' CONST. ESMT
S 56°33'56" E
43.48'
N 54°08'33" W
57.98'
3+00
(Slope Esmt)
N 35°00'19" E
3.24'
SLOPE ESMT #2
417.14 Sq. Feet
0.01 Acres
IP(O)
S 37°44'57" E
9.35'
SLOPE ESMT #1
11.82 Sq. Feet
(R.O.W.)
S 54°09'35" E
25.33'
N 54°09'35" W
N 52°03'07" W
25.34'
S 35°50'25" W
0.93'
208.85'
N 35°00'19" E
10.42'
S 54°09'35" E
20.00'
N 35°50'25" E
20.00'
(R.O.W.)
3+50 S 56°53'43" E
30.64'
(Slope Esmt)
S 55°35'55" E
12.52'
S 54°08'33" E
209.31'
(Slope Esmt)
N 54°08'33" W
115.72'
SHED
4+00
(Slope Esmt)
S 51°36'58" E
57.43' (Slope Esmt)
S 44°52'14" E
15.48'
SHED
N 54°09'35" W
20.00'
DRAINAGE ESMT#2
400.00 Sq. Feet
0.01 Acres
S 35°50'25" W
20.00'
PROPOSED RIGHT OF WAY
12551.95 Sq. Feet
0.29 Acres
S 54°08'33" E
4+50 IR(N)
7.12'
(R.O.W.)
(R.O.W.)
A=121.55'
R=830.00'
D=8°23'27"
B=S 49°56'49" E
C=121.44'
5+00
10' CONST. ESMT
IR(N)
PROPOSED RIGHT OF WAY
23226.26 Sq. Feet
0.53 Acres
TRACT 2A
MATTHEW KOBOLAK
MAP 047M, GRP B, PARCEL 26.00
WDB 2629, PG 1622
N 54°09'35" W
9.96'
(R.O.W.)
BARN
(R.O.W.)
A=112.76'
R=770.00'
D=8°23'27"
B=N 49°56'49" W
C=112.66'
IR(N)
(R.O.W.)
N
45°45'06" W
5+50 IR(N)
6+00 (R.O.W.)
N
75'ST4R8°A05N'5S8"MEISSION
90.16'
45°45'06" W
LINE
EASEMENT
99.01'
6+50
IR(N)
S 45°45'06" E
99.01'
20.00'
N 44°14'54" E
20.00'
N 45°45'06" W
20.00'
DRAINAGE ESMT#4
400.00 Sq. Feet
0.01 Acres
IR(N)
S 44°14'54" W
20.00'
S 52°13'20" E
TRACT 3B
HUNTER & EMILY RAMSEY
MAP 047M, GRP B, PARCEL 29.04
WDB 2625, PG 1478
A=88.69'
R=620.00'
D=8°11'47"
B=N 49°50'59" W
C=88.62'
SLOPE ESMT #5
1181.78 Sq. Feet
0.03 Acres
7+00
S 53°35'57" E
103.96'
A=22.97'
R=50.00'
D=26°19'14"
B=N 67°06'30" W
C=22.77'
(R.O.W.)
A=79.49'
7+50
R=50.00'
D=91°05'03"
B=N 80°30'36" E
C=71.38'
IR(N)
S 50°28'38" E
17.67'
S 68°02'25" W
5.16'
IR(N)
1N4515.7°34'6'22" W
IR(O)
N 52°47'52" W
HOUSE
TRACT 3A
HUNTER & EMILY RAMSEY
MAP 047M, GRP B, PARCEL 29.04
WDB 2625, PG 1478
(R.O.W.)
A=100.11'
R=680.00'
N 43°51'19" W
23.79'
D=8°26'06"
B=N 49°58'08" W
C=100.02'
N 46°45'13" W
30.57'
A=59.51'
R=680.00'
D=5°00'51"
B=S 51°40'45" E
C=59.49'
IR(N)
SLOPE ESMT #4
312.48 Sq. Feet
0.01 Acres
N 49°14'28" W
33.78'
A=29.64'
R=50.00'
D=33°57'50"
B=S 37°12'16" E
(R.O.W.) C=29.21'
A=77.79'
R=50.00'
D=89°08'10"
B=N 09°37'06" W
IR(N)
C=70.18'
IR(O)
8+00
8+08.78
0
30
60
90
SCALE: 1" = 30'
460.96'(Total)
IR(O)
IR(O)
A=80.55'
R=223.41'
D=20°39'31"
B=S 25°02'38" W
C=80.12'
361.57'
AXLE
JAMES & MELONEY WALKER
MAP 047, PARCEL 55.01
PLAT BK 2, PG 569
WDB 650, PG 540
IR(O)
IR(O)
A=42.75'
R=59.60'
D=41°05'48"
B=S 52°44'35" W
C=41.84'
END PROPOSED RIGHT OF WAY
0224
9.9.25
RRW
RRW
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Bid Title: FY2027-093 - Outdoor Pool Renovation Category: Bids & RFPs Status: Open
City of Oak Ridge
Due by 9/17/2026
Title & Description: RFB #1418 Roof Replacement at Woodland Middle RFB #1418 Legal
Williamson County Schools
Due by 9/10/2026
Submittal Deadline: September 30, 2026 02:00 PM local time Nashville Bid Project: in
Tennessee Board of Regents
Due by 9/30/2026
Project: Alvin C. York Campus Roof Replacements Alvin C. York Institute Jamestown, Fentress
State Government of Tennessee
Due by 9/17/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.