Bid Solicitation: BD-25-1020-DCRCU-DC260-108647
|
|
Responses Due in 15 Days, 15 Hours, 29 Minutes
|
|
Header Information
|
|
Bid Number:
|
BD-25-1020-DCRCU-DC260-108647
|
Description:
|
Amelia Earhart Dam Control Tower Rehabilitation
|
Bid Opening Date:
|
10/31/2024 12:00:00 PM
|
|
Purchaser:
|
CAROL BERNARDI
|
Organization:
|
Department of Conservation and Recreation
|
|
Department:
|
DCRCU - DCR CONTRACTS UNIT
|
Location:
|
DC260 - Construction contracts unit
|
|
Fiscal Year:
|
25
|
Type Code:
|
SS - Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
P15-2984-C3A
|
Required Date:
|
10/31/2024
|
Available Date
:
|
10/15/2024 04:52:41 PM
|
|
Info Contact:
|
Contact CAROL BERNARDI at (617)312-6912
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
A strongly encouraged pre-bidding conference will be held on October 16, 2024, at 10:00am at The Amelia Earhart Dam 100 Noonan Place, Somerville, MA.
|
|
Bulletin Desc:
|
|
|
|
Ship-to Address:
|
Robert Boncore
Department of Conservation & Recreation
10 Park Plaza
Suite 6620
Boston, MA 02116
US
Email: Robert.Boncore@mass.gov
Phone: (857)354-1358
FAX: (617)626-1449
|
Bill-to Address:
|
Robert Boncore
Department of Conservation & Recreation
10 Park Plaza
Suite 6620
Boston, MA 02116
US
Email: Robert.Boncore@mass.gov
Phone: (857)354-1358
FAX: (617)626-1449
|
Print Format:
|
|
File Attachments:
|
Contractor Signatory form
Environmental preferred products form
Prompt Pay Discount
Business Reference Form
Create a Quote Job Aid
instructions, Terms and Conditions 7-1-20
Updated Standard Contract Form 7-1-20.docx
Commonwealth Terms and Conditions for Information Technology Contracts 7-1-20.pdf
Updated EFT form.pdf
Mass W-9 Form April 2022.pdf
form_standard-contract (4).docx
instructions_standard-contract-form.pdf
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
SBPP (Small Business Purchasing Program) Eligible?:
|
YES
|
See SBPP requirements and exceptions at www.mass.gov/sbpp :
|
|
|
Item # 1:
(
72-10
-
20
)
|
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
|
|
U N S P S C Code:
|
72-10-20
Coating and caulking and weather and water and fireproofing
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
30-17
-
16
)
|
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
|
|
U N S P S C Code:
|
30-17-16
Windows
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
72-10
-
24
)
|
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
|
|
U N S P S C Code:
|
72-10-24
Painting and paper hanging
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
72-15-40-10-0000
)
|
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
|
|
U N S P S C Code:
|
72-15-40
Specialty building and trades services
|
72-15-40-10
|
|
Elevator installation maintenance and repair service
|
|
72-15-40-10-0000
|
|
Elevator installation maintenance and repair service
|
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
46-19
-
00
)
|
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
The structure is surrounded by water on all sides. Access to the Tower is via moveable walkways not designed for heavy loads. Delivery of supplies may require cranes or other special handling techniques. The tower is about 70 feet tall from deck level to roof and the only current access to the upper floor is a narrow spiral staircase.
|
|
U N S P S C Code:
|
46-19-00
Fire protection
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|