| Agency: | City of DeBary |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 1, 2026 |
| Due Date: | May 4, 2026 |
| Solicitation No: | 16-26 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Date | Time | Mandatory | Location |
| 3/17/2026 | 11:00 AM | Yes |
DeBary City Hall
16 Colomba Road DeBary, FL 32713 |
| Date | Time | Location |
| Question | Date Asked | Answer | Date Answered |
| What is the engineer`s estimate? | 3/2/2026 9:07:38 AM | ||
| Are the CAD files available? | 3/2/2026 9:08:21 AM | ||
| Will burning onsite be permitted for the clearing and grubbing stage of the project? | 3/17/2026 9:59:41 PM | ||
|
Question from Vendor: I had reached out about the E One system for this job the other day. I got back with the vendor and these were her concerns.
Tim, see posted below - the lift station detail they show is not an EONE station nor are the notes from an EONE spec although they call for an entire EONE system (may have just been grabbed from another project) but nonetheless want to ensure that they are ok with the drawings ive provided for the EONE package. • The most important id want to confirm is that the station has been sized considering the future expansion to the facility. I see "Future Events Building", "Future Operations Building", "Future Maintenance Building" - NOT IN CONTRACT.....shown on C4.0. The proposed station is rated for 3,000 GPD • Confirm 240V I Phase will be available to the EONE panel • EONE does not have an H20 traffic rated lid, my quote does not include the fiberglass valve box • The proposed EONE station I have quoted has a manifold inside the station with a single 1-1/4" discharge out of the basin (we can revise to a parallel discharge out of station if external valve box is required) typically a single small curb box with 1 1-1/4" EONE SS check valve (per their detail sheet in upper right of lift station page) would be utilized instead of the larger fiberglass shown |
3/19/2026 8:04:40 AM | ||
| Would it possible to extend the Questions due time till Monday, I am waiting on suppliers` info to make sure I don`t have any further questions. | 3/23/2026 1:55:06 PM |
| Code | Description |
| [912-23] | Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) |
| [913-36] | Construction, Parking Lot and Alley |
| [913-45] | Construction, Sewer and Storm Drain |
| [958-26] | Construction Management Services |
| Publication | Date |
| Daytona News Journal | 3/1/2026 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 6/09/2026
RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View
City of Tampa
Bid Due: 6/11/2026
Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to
Orange County
Bid Due: 6/04/2026
Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract
DEPT OF DEFENSE
Bid Due: 6/09/2026