Air Traffic Control Tower (ATCT) Replacement
| Agency: | Tampa International Airport |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 17, 2026 |
| Due Date: | Jul 29, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Air Traffic Control Tower (ATCT) Replacement
Addenda: 0
Release Date: 6/18/2026
Due Date: 7/29/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The Hillsborough County Aviation Authority (Authority) invites interested Design-Build firms (Respondent) to submit qualifications to provide professional design and construction services in accordance with Florida Statute Section 287.055 for the design and construction of the Air Traffic Control Tower (ATCT) Replacement (Project) at Tampa International Airport (TPA). This Project will be designed and constructed using the progressive Design-Build methodology.
Background
The existing ATCT facility was constructed in the early 1970s and is in need of replacement. TPA’s existing ATCT is operated, owned, and maintained by the Federal Aviation Administration (FAA). The FAA, in conjunction with the Authority, has determined that an acceptable location for the new ATCT is Site 18A, which is within an approximately 2-acre parcel located at the northwest quadrant of the Main Terminal complex.
Since the FAA’s approval, it has been determined that the ATCT location needs to be adjusted. The Authority has submitted an adjusted ATCT location to the FAA, which is approximately 40 feet west of Site 18A. The adjusted ATCT location is identified as Site 18C and is currently under review by the FAA. See Exhibit A, Conceptual Site Layout Plan, which represents the conceptual site layout plan for the ATCT facility and includes the new ATCT's adjusted location.
The Project’s location is currently under construction, featuring an elevated guideway for shuttle car service between the Main Terminal and the new Airside D. Construction is expected to be completed in February 2027. The Authority’s goal is to complete the ATCT structure and remove the cranes by March 1, 2029, ahead of Airside D’s May 2029 opening.
The Authority and the FAA are in the process of finalizing an agreement whereby the Authority will contract for and manage the design and construction of the Project. The FAA will be included as a major stakeholder in all facets and approvals of the design and construction of the Project.
The FAA will be responsible for the design, furnishing, installation, testing, and commissioning of all FAA required electronic and operational systems (FAA Equipment).
Funding for this Project is provided through a contribution from the Infrastructure Investment and Jobs Act (IIJA).
Timeline
Parking Instructions: Parking for the public to access SkyCenter is in the parking garage directly next to SkyCenter. The gate arm of the parking garage will be in the raised position. Respondent will park on Level 5 or 6 of the parking garage. Respondents will NOT park in front of the SkyCenter building or the cell phone lot.
OR
Microsoft Teams ®
Call-In: 1 813-694-2596
Conference ID: 904 614 399#
Click here to join the Microsoft Teams Meeting: https://teams.microsoft.com/meet/228524354911171?p=sNbMDZUzEBLI5r9gsm
OR
Microsoft Teams ®
Call-In: 1 813-694-2596
Conference ID: 808 917 690#
Click here to join the Microsoft Teams Meeting: https://teams.microsoft.com/meet/252030329215621?p=O8u3d6DqItJ0qLNrII
OR
Microsoft Teams ®
Call-In: 1 813-694-2596
Conference ID: 556 071 669#
Click here to join the Microsoft Teams Meeting: https://teams.microsoft.com/meet/233211664135344?p=JJcaLAqZCifsAMEd6V
OR
Microsoft Teams ®
Call-In: 1 813-694-2596
Conference ID: 531 410 753#
Click here to join the Microsoft Teams Meeting: https://teams.microsoft.com/meet/214430346710282?p=i4w5pAF7Lv5lndBXMW
OR
Microsoft Teams ®
Call-In: 1 813-694-2596
Conference ID: 368 420 615#
Click here to join the Microsoft Teams Meeting: https://teams.microsoft.com/meet/249084980022098?p=ZOobaekJVGYjVDAfl7
See Also
Description: OSF FAA BHSUD FY26 Department: Community Services Buyer: Taruna Malhotra Solicitation Number:
Palm Beach County
Due by 1/23/2030
Description: BUS STOP ADVERTISING Department: Purchasing Buyer: David Juhe Solicitation Number: RFP-680-24-036/DJ-4 Type:
Palm Beach County
Due by 2/28/2030
Description: PROMOTIONAL ITEMS, PLAQUES, TROPHIES, MEMORIAL BRICKS/STONES Department: Purchasing Buyer: Christal Bakie Solicitation
Palm Beach County
Due by 11/14/2027
Description: OSF FAA BHSUD FY26 Department: Purchasing Buyer: Jonathan Silva Solicitation Number: RPQ-680-F650559/JS-1
Palm Beach County
Due by 9/26/2029