Air Handling Unit Replacement Project - To provide an Air Handling Unit Replacement at a Judicial Branch location in Bridgeport, Connecticut.

Agency: State of Connecticut Judicial Branch
State: Connecticut
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Feb 10, 2026
Due Date: Mar 5, 2026
Solicitation No: 02-2516
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Due Date Bid No Pre-Bid Date Description
Feb 19, 2026
11:30 A.M.

Mar 05, 2026
11:30 A.M.
02-2516 Jan 22, 2026 Air Handling Unit Replacement Project - To provide an Air Handling Unit Replacement at a Judicial Branch location in Bridgeport, Connecticut.


MANDATORY PRE-BID CONFERENCE
: Thursday, January 22, 2026 at 9:30 a.m.

BID LIMITED TO DAS PRE-QUALIFIED CONTRACTORS ONLY.
Click Here to View Project Manual
Click Here to View Project Drawings
Click Here to View Addendum No. 1
Click Here to View Addendum No. 2

Commodity Class: 022

Attachment Preview

PROJECT MANUAL
Bridgeport AHU Replacement
AT
Fairfield JD
1061 Main Street
Bridgeport, Connecticut 06604
HON. RAHEEM MULLINS
CHIEF JUSTICE
HON. ELIZABETH A. BOZZUTO
CHIEF COURT ADMINISTRATOR
STATE OF CONNECTICUT
JUDICIAL BRANCH FACILITIES
90 WASHINGTON STREET
HARTFORD, CONNECTICUT 06106
Judicial Branch PN# 24-017
ENGINEER:
Kohler Ronan
Engineer’s PN# 24006.04
August 8, 2025
SECTION 000105 SEALS PAGE
SEALS PAGE
SECTION 000105
PAGE 1 of 1
(Seal and Signature)
(Seal and Signature)
(Seal and Signature)
Architect Professional
Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Architect.
(Print Consultant Name)
License No.
Expiration Date
Structural Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Professional
Engineer.
Bruce Richardson
(Print Consultant Name)
CT 14167
License No.
01/31/2026
Expiration Date
Mechanical Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Professional
Engineer.
Craig Razza
(Print Consultant Name)
18681
License No.
01/31/2026
Expiration Date
END OF SECTION 000105
(Seal and Signature)
(Seal and Signature)
(Seal and Signature)
Civil Engineer Professional
Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
(Print Consultant Name)
License No.
Expiration Date
Electrical Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
Craig Razza
(Print Consultant Name)
18681
License No.
01/31/2026
Expiration Date
Fire-Protection Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
(Print Consultant Name)
License No.
Expiration Date
Kohler Ronan
24006.04
Judicial Branch
Bridgeport AHU Replacement
JB24-017
SECTION 000110 TABLE OF CONTENTS
Section No.
00 00 00
00 01 05
00 01 10
00 01 15
00 01 20
Title
Manual Cover
Project Team Seals Page
Table of Contents & Checklist
List of Drawing Sheets
Project Team List
01 10 00
01 21 00
01 22 00
01 23 00
01 25 00
01 26 00
01 29 00
01 31 00
01 32 00
01 32 10
01 33 00
01 35 16
01 40 00
01 40 01
01 50 00
01 60 00
01 73 00
01 77 00
01 78 23
01 78 39
DIVISION 01 GENERAL REQUIREMENTS
Summary of Work
Allowances
Unit Prices
Alternates
Substitution Procedures
Contract Modification Procedures
Payment Procedures
Project Management and Coordination
Construction Progress Documentation
Photographic Documentation
Submittal Procedure
Alteration Project Procedures
Quality Requirements
Statement of Special Inspections
Temporary Facilities and Controls
Product Requirements
Execution
Closeout Procedures
Operation and Maintenance Data
Project Record Documents
02 82 13
02 83 19
02 84 16
DIVISION 2 EXISTING CONDITIONS
Asbestos Abatement
Lead Paint Awareness
Handling of Lighting Ballasts and Lamps
Containing PCBs and Mercury
TABLE OF CONTENTS
SECTION 000110
PAGE 1 of 3
Page Count
1
1
3
1
1
Not
Used
6
3
5
2
4
3
5
10
8
3
9
7
11
18
10
7
10
6
9
4
20
10
4
Kohler Ronan
24006.04
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
Section No.
23 00 00
23 01 30.51
23 05 13
23 05 16
23 05 17
23 05 19
23 05 23
23 05 29
23 05 48
23 05 53
23 05 93
23 07 00
23 08 00
23 09 00
23 09 93
23 21 13
23 21 23
23 22 13
23 29 13
23 31 13
23 33 00
23 57 00
23 73 13
26 01 00
26 05 00
26 05 19
26 05 26
26 05 29
Kohler Ronan
24006.04
TABLE OF CONTENTS
SECTION 000110
PAGE 2 of 3
Title
Page Count
Not
Used
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
(HVAC)
General Provisions
29
HVAC Air-Distribution System Cleaning
6
Common Motor Requirements For HVAC
Equipment
3
Expansion Fittings And Loops For HVAC Piping
6
Sleeves And Sleeve Seals For HVAC Piping
5
Meters And Gages
7
General-Duty Valves
15
Hangers And Supports For HVAC Piping And
15
Equipment
Vibration And Seismic Controls For HVAC
Piping And Equipment
23
Identification For HVAC Piping And Equipment
8
Testing, Adjusting, And Balancing For HVAC
19
HVAC Insulation
40
Commissioning Of HVAC
5
Instrumentation And Control For HVAC,
Electrical, And Plumbing Systems
52
Sequence Of Operations For HVAC, Plumbing,
8
And Electrical Controls
Hydronic Piping
23
Hydronic Pumps
8
Steam And Condensate Heating Piping
15
Enclosed Controllers
12
Metal Ducts
20
Air Duct Accessories
22
Heat Exchangers For HVAC
6
Custom Air-Handling Units
17
DIVISION 26 ELECTRICAL
General Electrical Requirements
11
Common Work Results For Electrical
4
Conductors And Cables
8
Grounding And Bonding For Electrical Systems
6
Hangers And Supports For Electrical Systems
5
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
Section No.
26 05 33
26 05 48
26 05 53
26 24 16
26 27 26
26 28 16
28 31 11
Title
Raceways And Boxes For Electrical Systems
Vibration And Seismic Controls For Electrical
Systems
Identification For Electrical Systems
Panelboards
Wiring Devices
Enclosed Switches And Circuit Breakers
TABLE OF CONTENTS
SECTION 000110
PAGE 3 of 3
Page Count
9
8
12
9
7
6
Not
Used
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Digital, Addressable Fire-Alarm System
11
END OF SECTION 000110
Kohler Ronan
24006.04
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Green Road Drainage The project will consist of replacing the existing 36" storm

State Government of Connecticut

Bid Due: 6/17/2026

Description Opening Date/Time Closing Date/Time RFP #1287 Betty Knox Apartments Roof Replacement May

Hartford Housing Authority

Bid Due: 6/18/2026

Project ID: Title: Fort Wooster Park Improvements Addenda: 0 Release Date: 5/31/2026 Due

City of New Haven

Bid Due: 6/24/2026

Project ID: Title: 710 Sherman Pkwy Roof Replacement-NHPD Addenda: 0 Release Date: 5/13/2026

City of New Haven

Bid Due: 6/03/2026