PROJECT MANUAL
Bridgeport AHU Replacement
AT
Fairfield JD
1061 Main Street
Bridgeport, Connecticut 06604
HON. RAHEEM MULLINS
CHIEF JUSTICE
HON. ELIZABETH A. BOZZUTO
CHIEF COURT ADMINISTRATOR
STATE OF CONNECTICUT
JUDICIAL BRANCH FACILITIES
90 WASHINGTON STREET
HARTFORD, CONNECTICUT 06106
Judicial Branch PN# 24-017
ENGINEER:
Kohler Ronan
Engineer’s PN# 24006.04
August 8, 2025
SECTION 000105 – SEALS PAGE
SEALS PAGE
SECTION 000105
PAGE 1 of 1
(Seal and Signature)
(Seal and Signature)
(Seal and Signature)
Architect Professional
Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Architect.
(Print Consultant Name)
License No.
Expiration Date
Structural Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Professional
Engineer.
Bruce Richardson
(Print Consultant Name)
CT 14167
License No.
01/31/2026
Expiration Date
Mechanical Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am
a duly registered Professional
Engineer.
Craig Razza
(Print Consultant Name)
18681
License No.
01/31/2026
Expiration Date
END OF SECTION 000105
(Seal and Signature)
(Seal and Signature)
(Seal and Signature)
Civil Engineer Professional
Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
(Print Consultant Name)
License No.
Expiration Date
Electrical Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
Craig Razza
(Print Consultant Name)
18681
License No.
01/31/2026
Expiration Date
Fire-Protection Engineer
Professional Certification:
I hereby certify that these
documents were prepared or
approved by me and that I am a
duly registered Professional
Engineer.
(Print Consultant Name)
License No.
Expiration Date
Kohler Ronan
24006.04
Judicial Branch
Bridgeport AHU Replacement
JB24-017
SECTION 000110 – TABLE OF CONTENTS
Section No.
00 00 00
00 01 05
00 01 10
00 01 15
00 01 20
Title
Manual Cover
Project Team Seals Page
Table of Contents & Checklist
List of Drawing Sheets
Project Team List
01 10 00
01 21 00
01 22 00
01 23 00
01 25 00
01 26 00
01 29 00
01 31 00
01 32 00
01 32 10
01 33 00
01 35 16
01 40 00
01 40 01
01 50 00
01 60 00
01 73 00
01 77 00
01 78 23
01 78 39
DIVISION 01 GENERAL REQUIREMENTS
Summary of Work
Allowances
Unit Prices
Alternates
Substitution Procedures
Contract Modification Procedures
Payment Procedures
Project Management and Coordination
Construction Progress Documentation
Photographic Documentation
Submittal Procedure
Alteration Project Procedures
Quality Requirements
Statement of Special Inspections
Temporary Facilities and Controls
Product Requirements
Execution
Closeout Procedures
Operation and Maintenance Data
Project Record Documents
02 82 13
02 83 19
02 84 16
DIVISION 2 EXISTING CONDITIONS
Asbestos Abatement
Lead Paint Awareness
Handling of Lighting Ballasts and Lamps
Containing PCBs and Mercury
TABLE OF CONTENTS
SECTION 000110
PAGE 1 of 3
Page Count
1
1
3
1
1
Not
Used
□
□
□
□
□
6
□
3
□
5
2
4
□
3
□
5
□
10
□
8
□
3
□
9
□
7
□
11
□
18
□
10
□
7
□
10
□
6
□
9
□
4
20
□
10
□
□
4
Kohler Ronan
24006.04
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
Section No.
23 00 00
23 01 30.51
23 05 13
23 05 16
23 05 17
23 05 19
23 05 23
23 05 29
23 05 48
23 05 53
23 05 93
23 07 00
23 08 00
23 09 00
23 09 93
23 21 13
23 21 23
23 22 13
23 29 13
23 31 13
23 33 00
23 57 00
23 73 13
26 01 00
26 05 00
26 05 19
26 05 26
26 05 29
Kohler Ronan
24006.04
TABLE OF CONTENTS
SECTION 000110
PAGE 2 of 3
Title
Page Count
Not
Used
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
(HVAC)
General Provisions
29
□
HVAC Air-Distribution System Cleaning
6
□
Common Motor Requirements For HVAC
Equipment
3
□
Expansion Fittings And Loops For HVAC Piping
6
□
Sleeves And Sleeve Seals For HVAC Piping
5
□
Meters And Gages
7
□
General-Duty Valves
15
□
Hangers And Supports For HVAC Piping And
15
□
Equipment
Vibration And Seismic Controls For HVAC
Piping And Equipment
23
□
Identification For HVAC Piping And Equipment
8
□
Testing, Adjusting, And Balancing For HVAC
19
□
HVAC Insulation
40
□
Commissioning Of HVAC
5
□
Instrumentation And Control For HVAC,
Electrical, And Plumbing Systems
52
□
Sequence Of Operations For HVAC, Plumbing,
8
□
And Electrical Controls
Hydronic Piping
23
□
Hydronic Pumps
8
□
Steam And Condensate Heating Piping
15
□
Enclosed Controllers
12
□
Metal Ducts
20
□
Air Duct Accessories
22
□
Heat Exchangers For HVAC
6
□
Custom Air-Handling Units
17
□
DIVISION 26 ELECTRICAL
General Electrical Requirements
11
□
Common Work Results For Electrical
4
□
Conductors And Cables
8
□
Grounding And Bonding For Electrical Systems
6
□
Hangers And Supports For Electrical Systems
5
□
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
Section No.
26 05 33
26 05 48
26 05 53
26 24 16
26 27 26
26 28 16
28 31 11
Title
Raceways And Boxes For Electrical Systems
Vibration And Seismic Controls For Electrical
Systems
Identification For Electrical Systems
Panelboards
Wiring Devices
Enclosed Switches And Circuit Breakers
TABLE OF CONTENTS
SECTION 000110
PAGE 3 of 3
Page Count
9
8
12
9
7
6
Not
Used
□
□
□
□
□
□
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Digital, Addressable Fire-Alarm System
11
□
END OF SECTION 000110
Kohler Ronan
24006.04
JUDICIAL BRANCH
Bridgeport AHU Replacement
JB24-017
This page summarizes the opportunity, including an overview and a preview of the attached documents.