Air Compressor
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Rhode Island |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jun 27, 2025 |
| Due Date: | Jul 3, 2025 |
| Solicitation No: | N6660425Q0140 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jun 27, 2025 01:48 pm EDT
- Original Published Date: Jun 05, 2025 03:32 pm EDT
- Updated Date Offers Due: Jul 03, 2025 02:00 pm EDT
- Original Date Offers Due: Jun 16, 2025 02:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jul 18, 2025
- Original Inactive Date: Jul 01, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 4310 - COMPRESSORS AND VACUUM PUMPS
-
NAICS Code:
- 333912 - Air and Gas Compressor Manufacturing
-
Place of Performance:
Newport , RI 02841USA
Please see attached documentation for all details about this opportunity.
AMENDMENT 0001- June 9, 2025
This solicitation is amended to correct a typographical error on the solicitation and to answer questions from Industry.
1. In the RFQ, page 2, where the labor matrix referred to the "full five (5) years" the document is corrected to read "full three (3) years". The amended document N6660425Q0140-0001 is added to this notice.
2. The specification document is corrected to remove the words "oil free".
3. The Site Visit document is revised to correct the contact email address for the Visit Control Center to: nuwc_npt_access_control@navy.mil
4. QUESTION:
On the Combined Synopsis and Solicitation document, there is a request for a labor matrix. Is the matrix shown the preferred style?
ANSWER: The offeror may propose additional labor categories as required to perform the SOW tasking. Total labor hours for the year shall not exceed 40 hours.
5. QUESTION:
The request on this document is for 5 years, but the SOW is for 3 years after the1 year warranty period. Presuming we are servicing during the first year of operation also, I see that as 4 years total. Am I reading one of the documents incorrectly?
ANSWER: RFQ document updated to three (years), per Answer 1 above. Warranty under CLIN 0001, for year one (1), shall include annual preventive maintenance services.
6. QUESTION: The bid asks for maintenance costs for three years. Maintenance on Sullair air compressors is based on hours of operation. Do you know how many hours per year the compressor operates? One shift (8 hours/day), two shifts (16 hours per day ), three shifts (24 hours per day) or 24/7. A single shift is approximately 2,000 hours. Need to know this to quote maintenance costs.
ANSWER: 16 hours/day.
7. QUESTION: The performance 240 cfm is the performance of a lubricated air compressor not an oil free compressor. An oil free 50 hp air compressor only delivers about 216 cfm. Please confirm if want an Oil Free air compressor.
ANSWER: A lubricated air compressor is acceptable. Oil carryover is unavoidable for lubricated air compressors. The requirement for oil free air is that the discharge from the proposed ‘system’ (compressor, dryer and filter) achieve ISO 8573-1 Air Quality 2.4.2 as the current system provides. The Specifications document has been updated, per Answer 2 above.
AMENDMENT 0002- June 16, 2025
Amended to incluse questions and answers from Industry.
1. QUESTION: Compressor discharge to be 1.5" type L copper tubing using existing Kaeser discharge line to the 2" copper header. New union and isolation valve will be installed.
ANSWER: Yes.
2. QUESTION: Voltage of compressor is 460/3/60. Dryer voltage is 230/1/60
ANSWER: Yes.
3. QUESTION: New dryer to include a 1.0u (micron) prefilter and a .01u (micron) afterfilter
ANSWER: Yes.
4. QUESTION: Access to building is thru the ground height overhead door on the side of the building.
ANSWER: Yes.
5. QUESTION: Aisleways to be free and clear of obstructions when we arrive to place compressor.
ANSWER: Yes.
6. QUESTION: Use of NUWC Newport fork truck to move the compressor from the overhead door area to the compressor room is allowed.
ANSWER: Operated by NUWC personnel, otherwise Contractor must provide their own.
7. QUESTION: New dryer bypass and piping to include Gardner Denver discharge will be 2" copper tubing type L.
ANSWER: Yes.
8. QUESTION: Maintenance costs are based on 4,000 hours of operation annually.
ANSWER: Yes.
AMENDMENT 0003 - June 27 2025
The solicitation was amended to offer clarification on the CLIN structure and quote format requirement. As a result of this modification the response time has been extended through July 3, 2025.
- 1176 HOWELL ST
- NEWPORT , RI 02841-1703
- USA
- Maria Diaz-Sotomayor
- maria.d.diaz-sotomayor.civ@us.navy.mil
- Phone Number 4018322028
- Jun 27, 2025 01:48 pm EDTCombined Synopsis/Solicitation (Updated)
- Jun 27, 2025 12:44 pm EDT Combined Synopsis/Solicitation (Updated)
- Jun 19, 2025 12:04 am EDT Special Notice (Updated)
- Jun 16, 2025 09:23 am EDT Combined Synopsis/Solicitation (Updated)
- Jun 12, 2025 09:20 am EDT Combined Synopsis/Solicitation (Updated)
- Jun 11, 2025 09:57 am EDT Combined Synopsis/Solicitation (Updated)
- Jun 05, 2025 03:32 pm EDT Combined Synopsis/Solicitation (Original)
Related Document
| Jun 5, 2025 | [Special Notice (Updated)] Air Compressor |
| Jun 5, 2025 | [Combined Synopsis/Solicitation (Original)] Air Compressor |
| Jun 11, 2025 | [Combined Synopsis/Solicitation (Updated)] Air Compressor |
| Jun 12, 2025 | [Combined Synopsis/Solicitation (Updated)] Air Compressor |
| Jun 16, 2025 | [Combined Synopsis/Solicitation (Updated)] Air Compressor |
See Also
RFQ27006937 |RIDOT: Salt Brine Mixing Tanks (2) & Pump System RIDOT is soliciting
State Government of Rhode Island
Due by 9/17/2026
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Due by 9/16/2026
Bid Number: B27001 Bid Title: Pump Station Wet Well Cleaning Category: Bids/RFQs Status:
Town of Narragansett
Due by 9/16/2026