APD FIRE STATION 1 KITCHEN REPLACEMENT
INVITATION TO BID NO. 2025C024
Municipality of Anchorage
Maintenance & Operations
Capital Projects
PO Box 196650
Anchorage, AK 99519
MUNICIPALITY OF ANCHORAGE
MAINTENANCE AND OPERATIONS
DEPARTMENT CAPITAL PROJECTS
2025C024
ASD FIRE STATION 1 KITCHEN RELACEMENT
TABLE OF CONTENTS
DIVISION 00 – BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT
Section
No. Pages
00 01 00 Cover Page............................................................................................1
00 01 10 Table of Contents ..................................................................................1
00 01 15 List of Drawings.....................................................................................1
00 11 16 Invitation to Bid......................................................................................2
00 21 13 Bidder Checklist – Instructions to Bidder ...............................................1
00 41 13 Bid Proposal ..........................................................................................2
00 43 13 Bid Bond................................................................................................1
00 52 13 Contract.................................................................................................4
00 61 13 Contract Performance and Payment Bond ............................................2
00 62 16 Certificate of Insurance..........................................................................1
00 65 13 Certificate of Compliance.......................................................................1
00 72 13 General Conditions..............................................................................59
00 73 00 Supplementary Conditions.....................................................................2
00 73 36 Equal Opportunity Special Provisions....................................................1
00 73 46 State of Alaska Labors & Mechanics Minimum Rates ...........................1
00 01 10 - 1
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 Summary ...............................................................................................3
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete .........................................................................5
DIVISION 05 – METALS
05 12 00 Structural Steel Framing ........................................................................3
05 31 00 Steel Decking ........................................................................................3
DIVISION 06 – WOOD, PLASTICS, and COMPOSITES
06 10 53 Miscellaneous Rough Carpentry............................................................6
06 40 23 Interior Architectural Woodwork...........................................................10
06 64 00 Plastics and Composites................................................................................ 4
DIVISION 07 – THERMAL and MOISTURE PROTECTION
07 21 00 Thermal Insulation .................................................................................6
07 62 00 Sheet Metal Flashing and Trim............................................................10
07 92 00 Joint Sealants ........................................................................................6
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames ...........................................................9
08 21 10 Wood Doors...........................................................................................4
08 31 13 Access doors and Frames.....................................................................5
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing................................................................7
09 29 16 Gypsum Board Assemblies ...................................................................7
09 30 00 Tiling......................................................................................................9
09 51 13 Acoustical Panel Ceilings…................................................................... 6
09 65 00 Resilient Flooring ...................................................................................6
09 65 13 Resilient Wall Base and Accessories.....................................................5
00 01 10 - 2
09 91 13 Exterior Painting ....................................................................................5
09 91 23 Interior Painting .....................................................................................6
DIVISION 10 – SPECIALTIES
10 11 00 Visual Display Units...............................................................................6
10 26 00 Wall, Door, and Area Protection ............................................................5
DIVISION 11 – EQUIPMENT
11 40 00 Food Service Equipment .....................................................................17
DIVISION 12 – FURNISHINGS
12 21 13 Horizontal window coverings .................................................................4
DIVISION 22 – PLUMBING
22 05 01 Common Work Results for Plumbing...................................................20
22 05 05 Selective Demolition for Plumbing .........................................................2
22 07 00 Plumbing Insulation ...............................................................................6
22 10 00 Plumbing Piping ....................................................................................6
22 40 00 Plumbing Fixtures..................................................................................4
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 05 00 Common Work Results for HVAC........................................................21
23 05 05 Selective Demolition for HVAC ..............................................................2
23 05 93 Testing, Adjusting, and Balancing for HVAC .........................................7
23 07 00 HVAC Insulation ....................................................................................8
23 09 00 Instrumentation and Control for HVAC ..................................................5
23 09 93 Sequence of Operations for HVAC Controls..........................................5
23 11 23 Facility Natural Gas Piping ....................................................................4
23 21 13 Hydronic Piping .....................................................................................5
23 21 16 Hydronic Specialties ..............................................................................5
23 31 00 HVAC Ducts and Casings .....................................................................7
00 01 10 - 3
This page summarizes the opportunity, including an overview and a preview of the attached documents.