Advance Notice - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project

Agency: DEPT OF DEFENSE
State: New York
Type of Government: Federal
FSC Category:
  • Y - Construction of Structures and Facilities
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 15, 2025
Due Date: Apr 29, 2025
Solicitation No: W912DS25BA009
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
Advance Notice - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project
Active
Contract Opportunity
Notice ID
W912DS25BA009
Related Notice
W912DS25S0028
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTH ATLANTIC
Office
W2SD ENDIST NEW YORK
General Information
  • Contract Opportunity Type: Special Notice (Updated)
  • Updated Published Date: Apr 15, 2025 01:44 pm EDT
  • Original Published Date: Apr 14, 2025 09:56 am EDT
  • Updated Response Date: Apr 29, 2025 02:00 pm EDT
  • Original Response Date: Apr 29, 2025 02:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jun 05, 2025
  • Original Inactive Date: Jun 05, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1KF - CONSTRUCTION OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    NY
    USA
Description

Background Information



The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The dredged material would be dredged and subsequently transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA), 5 miles southeast of Sandy Hook Point, NJ, and a stockpile placement at Lot J of the National Park Service (NPS) Sandy Hook Gateway National Recreation Area or at other stockpile site(s) identified by NPS. All stockpile site(s) are subject to change at the discretion of NPS and/or USACE. The proposed maintenance dredging would remove approximately 200,000 cubic yards of selected critical shoals from the Sandy Hook Channel. An estimated 15,000 to 20,000 CY of dredged material would be placed within the stockpile site identified above. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The dredged material is expected to consist primarily of sand and gravel.



The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.



Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. Placement at the stockpile site(s) may require scow, barge, or similar equipment with pump out capabilities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.



The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all basic work ready for use not later than ninety (90) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.



The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2025, with bid opening in July 2025. It is the intention of the government to award in August 2025 and issue the NTP within fourteen (14) calendar days of the award date.



Liquidated Damages of $2,810.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.



This is an unrestricted Procurement.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300
  • NEW YORK , NY 10278-0004
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Design & Construction Bid Documents Available: Project 47638 Title Provide Central Utility Plant

State Government of New York

Due by 10/07/2026

Follow Renovate Suite H8, Building 3 Active Contract Opportunity Notice ID FA875126Q0013 Related

DEPT OF DEFENSE

Due by 10/05/2026

70 Title: M/WBE/SDVOB Opportunities - TAB 26-6R / D215074 (Ontario/Monroe/Genesee) - Safety Improvements

The New York State Contract Reporter

Due by 9/16/2026

Water District #8 Phase 1A - Directional Drill Crossings The extension of water

Rochester Housing Authority

Due by 9/16/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.