Adendum No.2 2026-01 Windows/Doors

Agency: Huntsville Housing Authority
State: Alabama
Type of Government: State & Local
NAICS Category:
  • 238150 - Glass and Glazing Contractors
  • 238350 - Finish Carpentry Contractors
Posted Date: Jan 7, 2026
Due Date: Jan 13, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Adendum No.2 2026-01 Windows/Doors

Toggle Conten

ADDENDUM NO. 2
January 7, 2026
HUNTSVILLE HOUSING AUTHORITY
INVITATION FOR BIDS (IFB) IFB NO. 2025-11
WINDOW AND EXTERIOR DOOR REPLACEMENT AT BROOKSIDE
This addendum to subject IFB is to provide answers requested on January 6, and 7, 2026
Question: In that the units for construction will be occupied, who will notify the tenants when construction starts in their unit?
Answer: HHA will notify tenants prior to construction start in their units. Contractors will coordinate with HHA. Contractors will not directly notify tenants unless otherwise directed.
Question: Who will ensure the Contractor will be able to enter based on the schedule from 8am- 4:30pm- cst?
Answer: HHA’s Property Manager or Site Supervisor will ensure access and coordinate scheduling. Contractor must adhere to these hours.
Question: Will HHA have someone on the construction site to oversee the tenant’s while construction is ongoing?
Answer: HHA’s Property Manager or Site Supervisor will monitor the site as closely as possible.
Question: In that construction will take place Monday- Friday, will five (5) days be counted against the 180 days required for completion in lieu of seven (7) days?
Answer: The 180 days refers to calendar days, but HHA may consider “working days” in the schedule. Clarification should be requested in writing from HHA.
Question: Based on the nature of this project, will the Contractor be allowed to invoice for stored materials?
Answer: This is not automatically allowed. Contractors must review the IFB terms-usually, invoicing for stored materials requires prior approval and proper documentation.
Question: Will HHA allow for materials to be stored in their facility?
Answer: Storage on-site is rarely allowed. Contractors must arrange their own storage or get explicit HHA consent.
Question: Is Goudy correct that the liquidated damage is $500/ day?
Answer: Based on the IFB, yes, $500/day is the liquidated damage for project delay.
Question: According to Goudy’s window supplier vinyl clad windows have been discontinued. Do HHA know of a supplier that can be contacted for this type of window?
Answer: It is the contractor’s responsibility to find a supplier that can adhere to the specifications of the IFB.
Question: What window color (s) will be used for this project?
Answer: The IFB specifications defines the window color as a standard: white or tan for occupied housing units.
Question: Who will perform the measurements of the windows?
Answer: The Contractor is responsible for precise measurements. HHA may provide approximate dimensions for bidding purposes.
Question: Will the windows have grills in the glass?
Answer: The windows are glass windows. The contractor will be replacing like-for-like windows.
Question: Are blinds in the existing windows, if yes who will be responsible for removal & installation?
Answer: Yes. The Contractor is responsible for careful removal and reinstallation.
Question: Presently, in reference to the existing doors are their screens doors. If yes, will the Contractor remove & dispose of these doors as well as the entrance & exit doors?
Answer: Yes. Removal and disposal of existing doors is the Contractor’s responsibility, including screens.? The IFB speaks to 2-in-1 doors that combine the main door and screen into one unit.
Question: Will stops be required to go behind all doors.?
Answer: Stops behind doors are installed to meet required building code and to ensure proper operation of new doors.
Question: In the door spec it calls for an insulated steel or fiberglass exterior door. Does this apply to the storm door? The hardware package calls for a grade 1 or lockset, door viewer, and a deadbolt. This is not typical storm door hardware. Would standard hardware be accepted?
Answer: The specification for an insulated steel or fiberglass exterior door applies only to the main entrance/exit door, not the storm door. Storm doors are typically aluminum or vinyl and are not required to meet the same insulation or structural standards. Hardware package (Grade 1 lockset, door viewer, deadbolt) requirements are intended for the main exterior door. Storm doors typically come with standard latch hardware, not Grade 1 locksets or deadbolts. Standard storm door hardware is acceptable
Question: The IFB calls out 485 windows, is these 485 openings or are twin windows counted as 2 windows each?
Answer: The 485 windows refer to window units or openings, not individual sashes. Twin windows or paired windows: Each opening is typically counted as one window unit, even if it has two sashes side by side.
Question: Is the contractor responsible for making the windows egress compliant?
Answer: Yes, the Contractor is responsible for installing windows in a manner that meets building code egress requirements.
Documentation must be received sealed, in-hand, and time-stamped by the HHA no later than 2:00 PM CST on January 13, 2026. CAUTION: LATE SUBMISSION WILL BE HANDLED IN ACCORDANCE WITH THE PROVISIONS IN THE INSTRUCTIONS TO BIDDERS.
This addendum forms a part of the Contract Documents and modifies the original IFB. All other terms and conditions in the original IFB dated December 22, 2025 remains the same.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

BID # Bid Title Issue Date Due Date Open Date Contact Invitation to

Purchasing Association of Central Alabama (PACA) - Jefferson County

Bid Due: 6/02/2026

WEAVER ROAD EAST REALIGNMENT - GRADE, DRAIN, BASE, AND PAVE Engineering Bid/RFP #:

Mobile County

Bid Due: 6/24/2026

Follow Repair of Hangar Doors Active Contract Opportunity Notice ID W50S6N-26-Q-A020 Related Notice

DEPT OF DEFENSE

Bid Due: 6/05/2026

Sourcing Project Number: SRC0000033844 Solicitation Label: ABC Surrender Obligation General Contractor Status: Open

State Government of Alabama

Bid Due: 6/09/2026