Addendum 1 RFSOQBDC02-24/25 Pennekamp State Park - Interpretive Center

Agency: State Government of Florida
State: Florida
Type of Government: State & Local
Posted Date: May 21, 2025
Due Date: Jun 5, 2025
Solicitation No: RFSQ-12782
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Request for Statement of Qualifications Addendum 1 RFSOQBDC02-24/25 Pennekamp State Park - Interpretive Center Department of Environmental Protection (DEP)
Advertisement Status: OPEN
Last Edit Date/Time: 05/22/2025, 04:26 AM
Advertisement Number: RFSQ-12782
Agency Advertisement Number: RFSOQBDC02-24/25 AD1
Version Number: 1
Published Date/Time: 05/22/2025 04:26 AM
Start Date/Time: 05/22/2025 04:26 AM
End Date/Time:  06/05/2025 05:00 AM
Commodity Codes
Code Description
22101501 Front end loaders
22101502 Graders
22101509 Backhoes
22101511 Compactors
22101522 Track bulldozers
22101524 Mobile excavators
22101525 Wheel excavators
22101529 Skid steer loaders
22101600 Paving equipment
22101701 Earthmoving shovels
22101702 Earthmoving buckets or its parts or accessories
24101500 Industrial trucks
30121600 Asphalts
30121700 Road and railroad construction materials
30121900 Soil stabilizers and reinforcing materials
70171802 Storm water drainage
72103300 Infrastructure maintenance and repair services
72103301 Parking lot or road maintenance or repairs or services
72121101 Commercial and office building new construction service
72121400 Specialized public building construction services
72141000 Highway and road construction services
72141001 Highway and road new construction service
72141003 Highway and road maintenance service
72141100 Infrastructure building and surfacing and paving services
72141103 Highway and road paving service
72141104 Highway and road resurfacing service
72141120 Sewer line construction service
72141121 Water main construction service
72141122 Electric power line construction service
72141123 Manhole construction service
72141124 Pipe laying service
72141125 Pumping station construction service
72141126 Underground utilities construction service
72141205 Drainage system construction service
72141210 Marina construction service
72141510 Demolition services
72141511 Digging services
72151100 Plumbing construction services
72151101 Septic system construction service
72151306 Pavement marking service
72151500 Electrical system services
72152700 Concrete installation and repair services
72152704 Curb construction service
72152705 Sidewalk or ramp construction service
72152706 Driveway construction service
72152707 Retaining wall construction service
72152708 Parking lot construction service
72152709 Concrete pumping service
72152710 Foundation and footing construction service
72152902 Concrete reinforcement placing service
72153507 Construction site haul away service
76101602 Asbestos removal or encapsulation
95121700 Public buildings and structures

May 21, 2025

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

John Pennekamp Coral Reef State Park

Interpretive Center

DEP Solicitation NO. RFSOQBDC02-24/25

TO APPLICANTS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Government Operations Consultant II, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000. Failure to do so may be grounds for rejection of the Bid.

________________________________________________________________________

Signature of Contractor and Date

The Following statements supersede & supplement the corresponding items in the specifications & drawings:

1. Question: On page 2 of 3 of the RFSOQ under Preliminary Scoring, it states that we must include the Revised Current Contractor’s Experience Questionnaire and Financial Information—Form Number DMS-CM01 dated 7/2016 (Attachment A) with our response. The Florida Department of Management Services (DMS) currently provides a fillable version of this form revised in 8/2024. Can you please confirm whether we may use the most recent version in place of the 7/2016 form referenced in the RFSOQ?

Answer:  You may not use the fillable form.

2. Question: Please provide the current status of the construction drawings.

Answer: Construction Documents are at 90% with expected delivery of Final CDs June 10, 2025.

3. Question: Will the park remain fully operational during construction? If so, please specify which areas of the park are expected to remain accessible to the public and any associated operational requirements or restrictions.

Answer: Yes, the Park will remain open. This includes existing exhibits building and concessionaire building with any associated operations.

4. Question: Is the project intended to be completed in phases? If yes, please provide a detailed phasing plan or outline the expected sequencing of work.

Answer: The Construction Management (CM) firm will determine the sequencing plan.

5. Question: Please clarify the scope of road work included in the project. Specifically, provide details regarding any road reconfiguration, widening, resurfacing, or new roadway construction anticipated.

Answer: The new roadway is to be installed, accessing East side of Park and parking lot reconfiguration for Visitor Center/beach area and parking reconfigured by boat ramp, and including resurfacing.

6. Question: Will the access road to Far Beach and the picnic pavilions remain open throughout the construction period? If partial closures are expected, please provide scheduling or alternate access requirements.

Answer: Yes, it will remain open. Scope includes installing a temporary access road to the Far East Beach.

7. Question: What is the projected start date for construction?

Answer: Estimated January 2, 2026

8. Question: What is the estimated duration for construction?

Answer: 18 months

9. Question: Will the project pursue LEED or FGBC (Florida Green Building Coalition) certification? If so, please specify the targeted certification level.

Answer: No, LEED or FGBC will not be pursued.

10. Question: Will the demolition of the existing facilities be part of the scope of work associated with this RFP?

Answer: Demolition of the existing visitor center will be included within the scope of work. Asbestos testing and abatement, if necessary, will be the responsibility of the CM once all living organisms are relocated to the new Visitors Center.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Please direct all questions to:
Name: Laurinda Micheels
Phone: (850) 245-2781
Address: 3800 Commonwealth Blvd., MS520 Tallahassee, FL 32399-3000
Email: Laurinda.Micheels@FloridaDEP.gov
Click here to view the original advertisement
Description Date/Time
Addendum 1 RFSOQBDC02-24/25 Pennekamp State Park - Interpretive Center May 22, 2025, 4:26:07 AM
For questions on a specific advertisement, contact the agency advertisement owner. Advertisements include the contact information for the agency advertisement. The agency advertisement owner is the point of contact for vendors with specific questions.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: CRA-839-052826 Title: CRA Roofing Rehab - 839 Le Blanc Way Addenda:

Escambia County

Bid Due: 6/12/2026

Description: Convention Center - Cooling Tower Water Line Replacement (RE Department: Facilities Development

Palm Beach County

Bid Due: 6/22/2031

Description: Summit Library Administration Renovations Department: Procurement Buyer: Jeromy Calderon Solicitation Number: RPQ-680-F25-0090/JC-1-1

Palm Beach County

Bid Due: 8/14/2030

Follow Cape Canaveral National Cemetery Ornamental Grass Renovation and Irrigation National Shrine Project

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/23/2026