| Description | Opening Date | Closing Date |
|
ADDENDUM No. 2 - Stevens Park Projects |
June 16, 2026 10:30 AM |
June 26, 2026 3:30 PM |
TOWN OF STRATHAM
Department of Public Works
70 Bunker Hill Avenue * Stratham, NH 03885 * 603-772-5550
ADDENDUM NO. 2
Issued: June 16, 2026
Town of Stratham - Department of Public Works
RFPs 05-26-01, 05-26-02, and 05-26-03
Stevens Park Pavilion, Parking Area Improvements, and Pickleball Courts
PICKLE BALL COURTS
Questions & Answers
o
1. Fencing
All new fencing shall match existing tennis court fencing in height, appearance, and
o
general configuration.
New fencing shall tie into the existing tennis court fence. Bidders may provide an
o
alternate price for replacement of the existing fencing.
o
The waiting area shall be fully enclosed.
o
Access to the courts shall be from the exterior only.
o
Existing fencing consists of galvanized posts with black fabric.
Windscreen shall be provided around the full perimeter of the pickleball court
o
fencing.
o
Fence posts shall be sized appropriately to support the windscreen system.
Chain link fabric shall be sized and specified as appropriate for pickleball court
applications.
o
2. Retaining Wall
The retaining wall shown on the plans is part of this contract.
o
3. Underground Utilities
o
Future underground utility infrastructure shown on the plans shall be included.
o
Utility conduits shall terminate in field boxes.
Conduit installation shall generally follow the Typical Utility Trench Detail shown on
the plans.
o
4. Asphalt Surface
Selection of asphalt mix shall be at the contractor's discretion. Bidders may provide
PARKING LOTa l/te PrAnaVtIeN pGr icing for virgin mix if desired.
Questions & Answers
o
1. Plan Coordination
The Town is not providing additional delineation of work items between RFP
packages at this time. Bidders shall rely on the scope contained within each individual
RFP.
o
2. Parking Lot Reconstruction
The existing parking lot shall be removed and repaved as shown on the plans.
Page 1 of 3
o
3. Fencing
The proposed wooden fence between the parking lot and pickleball courts and fields
shown on the plans is not part of this project and will be completed separately.
o
4. Walkways and Curbing
o
Walkways shall be asphalt.
No granite curb is required adjacent to walkways unless otherwise directed.
o
5. Electrical and Lighting
o
No light poles are included in this project.
Any transformer location and associated requirements shall be coordinated through
PAVILION / RtEhSeT cRoOntOraMcSto r's electrical design and installation approach.
Questions & Answers
o
1. General Project Information
o
Permit fees will be waived by the Town.
The Town has not established a project budget or completion date at this time.
o
Project timing and scope may be influenced by available funding.
No allowance for unforeseen conditions is included at this time.
o
2. Building Design and Layout
The contractor shall provide and coordinate all architectural, mechanical, electrical,
o
and plumbing design necessary to complete the project.
Restroom layout, fixture counts, accessibility requirements, ventilation, electrical
distribution, lighting, finishes, accessories, and similar building components shall be
o
developed in coordination with the Town during final design and project planning.
The Town reserves the right to finalize material selections, finishes, fixtures,
accessories, and related details following award.
o
3. Exterior Materials
o
Exterior siding shall be determined during final design and planning.
Roofing shall be Everlast OMNI Series bronze corrugated metal roofing, consistent
with other recent Town projects.
o
4. Structural and Geotechnical Requirements
The General Contractor shall be responsible for geotechnical investigation and
o
verification of soil bearing capacity.
Structural fill depths, footing subgrade preparation, and related recommendations
o
shall be determined by the contractor and/or design professionals as required.
Questions regarding specific structural details have been referred to the project
engineer and will be addressed if additional information becomes available with the
engineers we've worked with on the project thus far.
o
5. Site Work and Utilities
o
Grading around the pavilion shall be included in this contract.
o
Water service routing may be modified as necessary.
Utility connections shall terminate in the utility closet located between the restroom
o
areas.
The mower storage area shown on the plans is no longer required and shall be
o
disregarded.
Future utility extensions between the pavilion and pickleball courts remain under
review and will be finalized during project planning.
Page 2 of 3
o
6. Septic System
The septic design has been reviewed and approved by NHDES.
o
7. Miscellaneous
o
Changing stations shall be provided in at least one restroom.
Hardware finishes, connection hardware colors, and other aesthetic selections shall
be determined during final design and planning.
All other terms and conditions of the RFP remain unchanged.
Page 3 of 3
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
REQUEST FOR PROPOSAL (RFP) RFP - DPW - Clay Hill Water Main Phase
City of Claremont
Bid Due: 8/05/2026
Follow Repair Taxiway Shoulders Active Contract Opportunity Notice ID W50S8A26BA011 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 8/21/2026
Follow MWF FHQ Roof Improvement Active Contract Opportunity Notice ID 12445526Q0067 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/17/2026
Follow 608-20-101 Loop Road Phase One West Active Contract Opportunity Notice ID 36C24126R0069
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/28/2026