Addendum No. 1 ITB 25-FAC-0027 Plumbing Repairs at Vorice J. Waters Elementary School

Agency: New Orleans Public Schools
State: Louisiana
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Jan 7, 2026
Due Date: Jan 15, 2026
Solicitation No: 25-FAC-0027
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Addendum No. 1 ITB 25-FAC-0027 Plumbing Repairs at Vorice J. Waters Elementary School (1.7.26)

Attachment Preview

THOMPSON ENGINEERING
JANUARY 7, 2026
PLUMBING REPAIRS AT VORICE J. WATERS
ELEMENTARY SCHOOL
PROJECT NO. ITB NO. 25-FAC-0027
A/E PROJECT NO. 25-1130-0043
ORLEANS PARISH SCHOOL BOARD
OWNER
ADDENDUM NO. 1
NOTICE TO BIDDERS:
This Addendum shall be considered part of the Contract Documents for the same above-
mentioned project as though it had been issued at the same time and incorporated
integrally therewith. Where provisions of the following supplementary data differ from
those of the original Contract Documents, this Addendum shall govern and take
precedence.
Acknowledge receipt of the addendum by inserting its number on the Bid Form of the Bid
Documents. Failure to do so will cause the bid response to be rejected.
Bidders are hereby notified that they shall make any necessary adjustments in their
estimates on account of this Addendum. It will be construed that each Bidder's proposal
is submitted with full knowledge of all modifications and supplemental data specified
herein.
AD1.1
A Pre-Bid Conference was held at 10:00 A.M. on January 6, 2026. Attached
are the Meeting Memorandum and Sign-In Sheet numbered AD1-3 through
AD1-5.
AD1.2
Drawings, Sheet No. 2, General Notes. Add the following general notes:
21. Contractor shall coordinate laydown areas with school staff and
provide temporary fencing around all work areas and laydown areas for
school safety.
22. Contractor shall perform pre and post video inspections on the sewer
lines to confirm limits of repair necessary to fix the toilet backup issue
and to confirm that repair work is satisfactory. Contractor shall
ADDENDUM NO. 1 - PAGE 1 OF 5
THOMPSON ENGINEERING
ADDENDUM NO. 1
provide the pre-construction video to the owner and engineer of record
for review prior to starting repair work. Contractor shall provide post
construction video to the owner and engineer of record for final
approval.
ADDENDUM NO. 1 - PAGE 2 OF 5
THOMPSON ENGINEERING
MEMORANDUM
PROJECT NO:
ITB25-FAC-0027 (25-1130-0043)
PROJECT NAME:
Plumbing Repairs @ Vorice J. Waters
DATE:
01-06-2025
BY:
Alec Simonson
PHONE CALL:
MEETING:
NUMBER:
LOCATION: Vorice Waters
TO:
ATTENDING: See sign in sheet attached
COMMENTS: Pre-Bid Meeting Notes:
Alec Simonson (Engineer of Record) begins meeting by going over the advertisement and
informing that bids are due January 15, 2026 by 2 pm delivered to the Orleans Parish School
Board per the advertisement.
Alec also discussed the addendums and the deadline for questions, which is Friday
January 9 at 2 pm. All questions should be sent Alec Simonson (asimonson@meyer-e-
l.com). It is stressed that all questions must be in writing in order to be answered by
addendum.
Alec described the scope of work of the project including the new backflow preventor
installation & sewer repairs underneath the school building.
Contractor questions & general discussion included the following:
o OPSB plans for work to be performed during the summer to allow for minimal
disruption to school operations. Ben Franklin does have a summer school program,
but they may be able to use another campus if needed.
ADDENDUM NO. 1 - PAGE 3 OF 5
o There was a question of the requirement for temporary fencing. The contractor will
be responsible for providing temporary fencing around all work areas for school
safety.
o There was a question about the budget for the project. The engineering estimate for
the work was approximately $430,000.
All meeting attendees proceeded to walk to the project site to go over the scope of work in
greater detail. Contractors are encouraged to visit the site to thoroughly examine the
existing conditions prior to bidding. Alec requests that any questions to clarify the scope
of repairs be sent in as soon as possible.
The final addendum will be posted by Monday January 12, 2026 by 2 pm.
.
ADDENDUM NO. 1 - PAGE 4 OF 5
ADDENDUM NO. 1 - PAGE 5 OF 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number Description Date Issued Bid Open Date/Time 123457-SB1862 ANNA T. JORDAN COMMUNITY

State Government of Louisiana

Bid Due: 6/30/2026

ITB 26-FAC-0076 Roof Replacement at Ellis L. Marsalis Jr. School (6.3.26) New! 370.21

NOLA Public Schools

Bid Due: 7/07/2026

WATER MAIN REPLACEMENTS AND EXTENSIONS AT SCATTERD LOCATIONS THROUGHOUT ORLEANS PARISH Contract #:

Sewerage and Water Board of New Orleans

Bid Due: 7/08/2026

Follow GIWW ? Gulf Intracoastal Waterway, Algiers Lock, New Maintenance Building, Orleans Parish,

DEPT OF DEFENSE

Bid Due: 7/14/2026