Addendum No. 1 ITB 23-FAC-0073 Chiller Replacement@ Mary Keller Zervignon School

Agency: New Orleans Public Schools
State: Louisiana
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Dec 5, 2025
Due Date: Dec 16, 2025
Solicitation No: 23-FAC-0073
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Addendum No. 1 ITB 23-FAC-0073 Chiller Replacement@ Mary Keller Zervignon School (12.5.25)

Attachment Preview

PIVOTAL , LLC
1515 POYDRAS STREET, SUITE 1150
NEW ORLEANS, LA. 70112
(504) 799-3653
ADDEDNDUM # 1
CHILLER REPLACEMENT @ MARY KELLER ZERVIGNON
Owner: Orleans Parish School Board (OPSB)
Program Manager: Manning Architects (Clarence Eugene III – Sr. Project Manager)
Project #: ITB23-FAC-0073
Date: 12/5/2025
Project Location: 3128 Constance Street, New Orleans, LA. 70115
POR: Pivotal Engineering LLC, Bassam Rossi Mekari, PE / 225-205-3490
I- Answers To Questions/Emails (Questions are in numerical orders,
Answers are below each question):
1. Could you please get me the value of this project for our bonding surety?
Answer: Project Budget is $840,000.00
2. Can you let us know if the pre-bid for this project will be mandatory or non-mandatory?
3. Answer: Non Mandatory
4. Can you let me know if they would accept a Building Construction license or is it only for the
Mechanical Work license?
Answer: This work is not only for contractors with Mechanical Work license. A licensed GC
can bid for this job. All subs must be licensed and insured as well and follow the State licensing
guidelines. Work is mostly mechanical.
5. Can you please email us the bid documents for this project?
Answer: Bid Docs can be emailed by Pivotal Engineering LLC based upon email request.
Page 2 of 4
II- Substitutions Requests:
As per the front-end bid documents in section 4.3, the following guidelines shall be met:
4.3 Substitutions:
4.3.1 The materials, products and equipment described in the Bidding Documents establish a standard
of quality, character, type, style, function, dimension, and appearance desired. Equivalent products may
be acceptable, as stated in La. R.S. 38:2212.T(2). It shall be the responsibility of the Architect/Engineer to
determine if a proposed substitution is equivalent. No substitutions shall be allowed after bidding, except
as may be provided in the Contract Documents.
4.3.2 No substitution will be considered unless written request for approval has been submitted by the
Proposer and has been received by the Architect/Engineer at least seven (7) working days prior to the deadline
for submission of Bids. (La. R.S. 38:2295.C) Each such request shall include the name of the material or
equipment for which it is to be substituted and a complete description of the proposed substitute including
model numbers, drawings, cuts, performance and test data and any other information necessary for an
evaluation. A statement setting forth any changes in other materials, equipment or work that incorporation
of the substitute would require shall be included. It shall be the responsibility of the Proposer to include
in his proposal all changes required of the Contract Documents if the proposed substitution is used. Prior
approval is given contingent upon supplier being responsible for any costs which may be necessary to
modify the space or facilities needed to accommodate the materials and equipment approved.
4.3.3 If the Architect approves any proposed substitution, such approval will be set forth in an
Addendum. Bidders shall not rely upon approvals made in any other manner.”
The design and dimensions are based on Trane Chillers as scheduled in our bid documents.
Acceptable Substitutions:
York, Carrier, Daikin are acceptable compatible manufacturers. However, as per our bid
specs, proposed equipment must meet at a minimum the following:
1- It is contractor s responsibility to ensure that all bid documents are adhered to.
2- Specification Section 23 64 23.13 Para 3.02 discusses that proposed manufacturers shall
have a local rep within 10 miles of the job site with qualified HVAC technicians and
engineers that can service the provided equipment.
3- Equipment must be made in the USA.
4- Engineer approval does not allow specification compromises. The contractor remains
responsible for meeting all equipment specifications.
Page 3 of 4
III- Tax Exemption
This project is tax exempt
IV- General Discussions
1- Questions form GCs hall be submitted in writing or email no later than 5 business days prior to
bid due date (Dec 16 @ 2 pm). No questions allowed thereafter.
2- All Addendums from Engineer shall be submitted 72 hours prior to bid due date.
3- GC is responsible for obtaining all addendums.
4- During phasing of the work, GC is responsible to ensure that school is conditioned at all times.
5- All CWS/CWR lines shall be properly flushed using chemicals/start up strainers prior to
connecting new Chillers.
V- Post Bid Document Checklist From OPSB
Attached Appendix A
VI- School Calendar
Attached Appendix B
VII- Prebid Meeting Agenda
Attached Appendix C
VIII- Sign In Sheet
Attached Appendix D
End of Addendum #1
Bassam Rossi Mekari, PE - Principal
Bassam Rossi Mekari
Pivotal Engineering
APPENDIX A
NOLA Public Schools
Post-Bid Document Checklist
Project Information
Project: ITB 23-FAC-0073 Chiller Replacement @ Mary Keller Zervigon School
Bid Opening Date: Tuesday, December 16, 2025
Pre-Bid Conference Date: Thursday, December 4, 2025 3128 Constance Street, NO LA 70115
All documents are due within 10 calendar days after bid opening.
Submission Rules
• Post-Bid Documents cannot be emailed.
• Submission by hand delivery, U.S. Mail, or Express Mail only.
• NOLA-PS is not responsible for delays or lost mail; late receipt = non-responsive.
Required Post-Bid Documents
Non-Collusion Affidavit
Attestation Clause
DBE Responsiveness Form 1
DBE Responsiveness Form 2
DBE Certification Checklist (Notarized)
Copy of DBE Certification Letter(s) (Provide letters for any DBE firms being claimed)
EDGAR Form
Delivery Address (Hand Delivery or Mail)
Mr. Jonathan Temple
Office of Business Partnerships
NOLA Public Schools
2401 Westbend Parkway, Suite 5055
New Orleans, LA 70114
APPENDIX B
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Z2NE--CON Project 667-22-118, Replacement Underground Water Tanks Active Contract Opportunity Notice ID

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/22/2026

Follow HUM MALSR Demo and Replacement Active Contract Opportunity Notice ID 6973GH-26-R-00111 Related

TRANSPORTATION, DEPARTMENT OF

Bid Due: 6/19/2026

Bid Number Description Date Issued Bid Open Date/Time 923456-26-17-1 Tammany Trace Solar Pedestrian

State Government of Louisiana

Bid Due: 6/10/2026

CWP-102C Southern Hills Interceptor Replacement - Williamson way & Kingston Road 30" Sewer

City of Shreveport

Bid Due: 6/16/2026