Addendum No. 1 for Bid Number 2026.06 – Little Chocolate Bayou Park Bridge – Public Access for Calhoun County, Texas

Attachment Preview

G&W E N G I N E E R S, I N C .
205 W. Live Oak Port Lavaca, TX 77979 p: (361)552-4509 f: (361)552-4987
TBPE Firm Registration No. F4188 TBPLS Firm Registration No. 10022100
April 16, 2026 – 10:00A.M.
G&W Project #: 9115.031
Little Chocolate Bayou Park Bridge – PRE-BID Conference – MEETING MINUTES
Held at Little Chocolate Bayou Park Pavillion in Port Lavaca, Texas
Attendees:
See Sign in Sheet attached to these minutes.
Meeting Minutes:
- Opening and introduction of Engineer and County Personnel
Scott – Start of the explanation of Project and funding sources requirements
- Labor Standards explanation
Scott – Project specifics explanation starting with the bid documentation and spec book
- Bid opening date stated (05/14/26 2:00 pm.) including explanation of bid drop off and bid
opening procedure
- Last Questions must be sent by 04/23/26 5pm on civcast.
- Explanation of bid submittal checklist
- Explanation of bid schedule, -$40,000 contingency and, %5,000 Testing allowance are to be
added to the contractors bid price
- Explanation of bid form required for a complete bid
- Explanation of bid acknowledgement and calendar day estimation
- Brief explanation of bidder’s qualification
- Explanation of section 3 documentations
- Explanation of the spec notes, and acknowledgement that an addendum will be made after
the last question deadline.
- Explanation of in the instance of overlapping requirements the most stringent requirement
takes priority.
- Talk of the possibility of reusing the existing handrail
- Discussion on closing the bridge area as a second entrance is available for use.
Demi - Talked about the Sam.gov requirements and that proof that application to the registry is started
at the time of bid if bidder is not yet listed on the site.
- Discussion of subcontractors.
Scott - Discussion on foundation piles and span of channel
- Explanation that engineer will work with contractor on the tides and location for the erosion
prevention mat
- Explanation of the 22 ft bridge slab with pedestrian walking lane.
Engineering Consulting Planning Surveying
G&W E N G I N E E R S , I N C .
Question – Question on the size of the I-beams for the span as certain sizes will take additional time for
delivery.
Question - Question on painted steel note differing from specs.
Question – Question on the possibility of coating the beams, exact beams and coating would need to be
submitted and approved by engineer.
Scott - Discussion on planned concrete structures.
- Explanation on what would happen if rainwater was to get into the drill shaft before the
concrete was poured.
- Explanation on that if a cave-in were to happen to the holes it may require a clean out before
pouring.
Question – Can the CAM method or prestressed concrete pilings be used instead for drill shafts?
Question – Will the Engineer provide control points? – Engineer will provide control points to
contractor
Scott - Explanation on the length of the beams being 49’-10”
- Explanation on the type of guard rails for the bridge. @ TxDOT traffic rails, 1 TXDOT
pedestrian rail.
- Explanation that the demolition for the project is one bid item. The county will confirm
disposal location of creosote treated timber.
- Contractor will need to coordinate with the county about checking for power onsite.
- Reminder that the work area is partially over water so storm water from the construction
activities is a concern.
- Explanation of possible laydown area for materials / equipment.
No Further questions were asked regarding the plans and specifications and the meeting was adjourned.
Engineering Consulting Planning Surveying
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Supervised Visitation Services Solicitation ID: HHS0012909 | Due Date: 3/31/2029 | Due Time:

State Government of Texas

Bid Due: 3/31/2029

Follow Sponsorship Solicitation for MWR Elements of DAF Sports Programs Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 12/09/2026

UTS/A126 Business and Administrative System Support (BASS) Services Solicitation ID: UTS-A126 Due Date:

State Government of Texas

Bid Due: 7/13/2026

ANNUAL CONTRACT FOR CONCENTRATED DEODORIZING DISINFECTANT FOR ANIMAL CARE SERVICES (ACS) Solicitation ID:

State Government of Texas

Bid Due: 6/29/2026