1809 - Addendum 1 - Conversion of St. Gabe's Boys and Girls Club - Exterior Doors and Windows Renovations

Attachment Preview

ADDENDUM #1
CONVERSION OF ST. GABE’S BOYS & GIRLS CLUB – EXTERIOR DOORS & WINDOWS RENOVATIONS
1 TUDOR ROAD
MILFORD, CT 06460
S/P+A PROJECT NO. 22.053
DATE: December 5, 2023
The following changes to the Drawings and Project Specifications shall become a part of the Drawings and
Project Specifications; superseding previously issued Drawings and Project Specifications to the extent
modified by Addendum #1.
General Information:
The pre-bid sign-in sheet is attached for reference. (1)
The deadline for RFIs is Wednesday, December 6, 2023, 10:00am.
See attached RFI log. (1)
New Specifications:
The following sections have been added and are attached as part of this addendum.
o
o 012300
o 081743
o 101400
Bid Form (2)
Alternates (2)
FRP Flush Doors and Frames (6)
Signage (2)
Changes to the Specifications:
TABLE OF CONTENTS:
o Page 1:
Division 00 – Procurement and Contract Requirements, Bid Form, Pages, revise “3” to read
“2.
Division 01 – General Requirements, add the following:
“Section 012300 Alternates
2”
o Page 2:
Division 08 – Openings:
Section 081743, Pages, revise “7” to read “6”.
Section 087113, delete in its entirety.
Division 09 – Finishes, Section 099123, delete in its entirety.
Division 12 – Furnishings, delete in its entirety.
Add the following:
Conversion of St. Gabe’s Boys and Girls Club–Exterior Doors and Windows Renovations – Milford
Addendum #1-1
ADDENDUM #1
“DIVISION 10 – SPECIALTIES
Section 101400 Signage
2”
SECTION 081613, FIBERGLASS DOORS AND FRAMES, delete in its entirety.
SECTION 087113, POWER DOOR OPERATORS, delete in its entirety.
Changes to the Drawings:
DRAWING A610, WINDOW DETAILS, delete in its entirety. A new DRAWING A610 has been added and
is attached as part of this addendum.*
The bid date remains unchanged by this addendum.
The addendum consists of sixteen (16) pages of 8½” x 11” text and one (1) 30” x 42” drawing*.
End of Addendum #1
Conversion of St. Gabe’s Boys and Girls Club–Exterior Doors and Windows Renovations – Milford
Addendum #1-2
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518
311 State Street | New London CT 06320
BID RFI LOG
Project: Conversion of St. Gabe's Boys & Girls Club - Exterior Doors & Windows
State Project/Bid #:
S/P+A Project #: 22.053
RFI Deadline: 12/06/23, 10a
Bids Due: 12/13/23, 3p
RFI #
001
002
003
004
005
006
007
008
QUESTION
Specification page SIB-1 refers to a bid date of Dec 6, 2023.
Invitation to Bid refers to Dec. 13.
Specification Table of contents indicates Section 099123-
Interior Painting and Section 123661.16 Solid Surface
Countertops, neither of these are provided in the Body of the
Specifications.
DATE
RECEIVED
RESPONSE
11/28/23 SIB refers to the deadline for RFIs, not the bid date.
11/28/23
These sections are not part of the scope. Refer to
Addendum #1.
ADDENDUM #
ISSUED
1
1
In Vestibule 100, there is what appears to be a window shown
"dark" is that new or existing.
11/28/23
The window shown between Vestibule 100 and Office
102 is a future interior window not included in this scope.
1
Wall between rm 102 and 101 is dashed, is that supposed to
be removed?
11/28/23
The dashed line is not in project scope as it was
removed in the last demo phase of the project.
1
The bid form is not included in the project manual.
11/29/23 Refer to Addendum #1.
1
Are the window sills existing or new? On A610 Sill Detail 1
indicates 'existing', Detail 4 calls for 1/2" SS sill. Is the Head
trim details 3 and 6 to be new or existing.
11/30/23
Existing window sills are the masonry opening. No new
sills are in the project scope. Refer to Addendum #1.
1
The overall Plan differs from the Code Plan regarding interior
partitions door etc. We are not to include any other work that
is not identified on A100 Correct?
11/30/23
Code Plan is for information only. Scope of work is on
Drawing A100.
1
There is a Specification section for Power Door Operators,
however none are indicate on the Door Schedule or in the
Drawings. Are any required and where?
11/30/23
Power door operators are not in the scope of work.
Refer to Addendum #1.
1
Page 1 of 1
BID FORM
(To be submitted in duplicate)
BIDDER:
__________________________________________
Name
__________________________________________
Address
To:
Purchasing Authority of the City of Milford
70 West River Street
Milford, CT 06460
Project: Conversion of St. Gabe’s Boys & Girls Club – Exterior Doors & Windows Renovations
1 Tudor Road
Milford, CT 06460
In preparing this bid, we have carefully examined the Bidding Documents for this Project. We have
visited the site and noted the conditions affecting the Work.
The Bidding Documents referred to include Drawings and Project Manual dated November 17, 2023 for
the above referenced project, prepared by Silver/Petrucelli + Associates, Inc., Hamden, Connecticut.
We propose to perform the work described in the Bidding Documents, in keeping with definitions of Article
1 of the Instructions to Bidders, for the Base Bid Sum as follows:
Base Bid:
Entire Project for the Total Cost of:
$
Dollars ($
.00).
written figure
We will commence work on the project _______ calendar days after receipt of "Notice to Proceed" or
signing of Contract (whichever is earlier). We will be able to substantially complete the project within
________ calendar days thereafter (see SIB-1, 1.1.B).
Alternates:
The undersigned proposes to furnish all Labor, Materials, Equipment and Services necessary to construct
the items listed in the Alternates described in Section 012300 for the stipulated sum of:
ADD ALTERNATE #1: 42-Inch Opening: Add to the Base Bid a total of
$
Dollars ($
.00).
written figure
The project schedule will be increased by _____ calendar days to complete the work indicated under Add
Alternate #1.
Conversion of St. Gabe’s Boys and Girls Club–Exterior Doors and Windows Renovations – Milford
Bid Form-1

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: 03-23-24-02 Bid Title: "Sewer Pipe Lining Work for State of CT

City of Danbury

Bid Due: 4/30/2024

Description Opening Date/Time Closing Date/Time Bid #13-2223 - Guilford Free Library Slate Roof

Town of Guilford

Bid Due: 6/11/2024

22078 | Town of Farmington - Bid 350 - Sidewalk Repair - Rt.

State Government of Connecticut

Bid Due: 5/09/2024

Bid Name ID Status Categories Start Date End Date Seymour Community Center Elevator

Town of Seymour

Bid Due: 6/04/2024