Addendum #1 - Bid #25-10, Ritchen School Roofing Improvement Project
| Agency: | Oxnard School District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 27, 2026 |
| Due Date: | Jun 2, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Bid #25-10, Ritchen School Roofing Improvement Project
Attachment Preview
Wednesday, May 27, 2026
ADDENDUM #1 – RITCHEN SCHOOL
OXNARD SCHOOL DISTRICT
BID #25-10 – RITCHEN SCHOOL ROOFING IMPROVEMENT PROJECT 2026
NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK:
You are hereby notified of the following changes, clarifications or modifications to the original Contract
Documents, Project Manual, Drawings, Specifications, and subsequent Addenda. This Addendum shall
supersede the original; Contract Documents, and previous Addenda wherein it contradicts the same and shall
take precedence over anything to the contrary therein. All other conditions remain unchanged.
CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS, DRAWINGS AND
SPECIFICATIONS:
CLARIFICATION/CHANGES/ADDITIONS TO THE PROJECT MANUAL:
1. Include in base bid a $40,000 allowance for damaged wood replacement at Ritchen School.
2. Install vertical Kynar “L” metal panels at designated metal wall panel to stucco terminations; see map
for locations. “L” panels are to be a minimum of 8”x8” by height of wall. Include underlayment and
sealants as needed. Submit shop drawing for review and approval. Color to be selected by Owner
3. See Attached map for coping replacement areas.
QUESTIONS AND ANSWERS:
1. Page 10 of 17 Per 2.8 “Roof Insulation and Insulation Accessories” B. Roof Insulation c. is calling
No insulation size” and ¼” dens deck but on page 12 of 15 the spec’s is calling for 1” see D.2 can you
please confirm will it be 2.5” or 1”?
A: Per the specification the total thickness of Polyiso insulation is 1”. Coverboard is ¼”
2. Per 075416 page 10 of 15 2.9 Walkway Materials we need a walk pad layout or liner feet so we all could
bid apples to apples?
See page 14 of 15 3.8 Walkway Installation calling to install walk pad at all rooftop units and roof hatch
with a walkway path from roof hatch to all roof tops (HVAC units) provide walk pad layout?
A: Duplicate question. See addendum for clarification
3. At walls where there is wall panels there is no counterflashing do we install a skirt metal?
With new insulation the Base flashing at wall is going to be around 4" will that be acceptable?
A: Yes, skirt metal is required where missing.
Yes, 4-6” base flashing have been approved
4. At existing duct supports has L brackets can you provide a detail so we all bid apples to apples?
A: See 3.7 Item C
END OF ADDENDUM #1
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
EXT REC | CON26-0001 Marina Dredging - SF First Format : Sell |
City and County of San Francisco
Due by 12/31/2026
Walnut Creek WTP Filters Improvements [Sign In] Current Construction Bid Opportunities Title: Walnut
East Bay Municipal Utility District
Due by 11/10/2026
RFx Name: BPM013421 RFx Begin Date (UTC+0): RFI - NOTICE OF FUNDING AVAILABILITY
County of San Diego
Due by 11/19/2026
Basic Information Title Progressive Design-Build Independent Cost Estimator Services for the Kane Spring
State Government of California
Due by 11/19/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.