Addendum #2 BDC07-25/26 Office of Resilience & Coastal Protection-SE Region Quayside Dock Shoreline

Agency: State Government of Florida
State: Florida
Type of Government: State & Local
Posted Date: Nov 9, 2025
Due Date: Nov 19, 2025
Solicitation No: ITB-14296
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Invitation to Bid Addendum #2 BDC07-25/26 Office of Resilience & Coastal Protection-SE Region Quayside Dock Shoreline Department of Environmental Protection (DEP)
Advertisement Status: OPEN
Last Edit Date/Time: 11/07/2025, 10:56 PM
Advertisement Number: ITB-14296
Agency Advertisement Number: BDC07-25/26
Version Number: 1
Published Date/Time: 11/07/2025 10:56 PM
Start Date/Time: 11/07/2025 10:56 PM
End Date/Time:  11/19/2025 05:30 AM
Commodity Codes
Code Description
72141200 Marine construction services
72141204 Dock construction service
72141211 Pier construction service
72152300 Carpentry services

November 7, 2025

NOTICE TO APPLICANTS

ADDENDUM NO. TWO (2)

DEP- Office of Resilience & Coastal Protection - SE Region – Quayside Dock Shoreline Stabilization

DEP BID NO. BDC07-25/26

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

  1. Question:  Fixed Dock and Gangway Connection
    No section detail is provided for the joint between the fixed dock and the gangway.
    By code, an inclined gangway must maintain continuous handrails within the level area, which requires the gangway to be narrower—allowing at least 6 in per side (1 ft total) for clearance between railings to avoid collision or hand entrapment.
    ?? Please clarify how the handrail connection will be handled and whether the width of either element will be adjusted to provide the required 1 ft difference.

Answer: Gangway is a submittal item in the project plans. Contractor to submit shop drawings for approval

  1. Question:   Floating Dock Stability
    The gangway transfers approximately 650–800 lb to the floating dock. Because this load is offset about 1 ft from the edge, it will create a torsional moment that tends to tilt the float and overstress the pile guides.
    ?? Please clarify how this unbalanced loading condition will be prevented, and whether the gangway landing will be centered on the float.

Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.

  1. Question:   Transition Plate and Access Area
    A transition plate (typically 4–5 ft long) is required and must include guardrails.
    With only a 5 ft wide float and an off-center gangway, the remaining flat walk surface is less than 1 ft wide, which is not code-compliant nor safe.
    ?? Please clarify the intended transition-plate length and landing configuration ensuring safe, ADA-compliant access.

Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Please direct all questions to:
Name: Alisha Sadler
Phone: (850) 245-3127
Address: 3900 Commonwealth Blvd. MS#520 Tallahassee, FL 32399-3000
Email: Alisha.Sadler@FloridaDEP.gov
Click here to view the original advertisement
Description Date/Time
Addendum #2: Office of Resilience & Coastal Protection - SE Region -Quayside Dock Shoreline Nov 7, 2025, 10:55:56 PM
For questions on a specific advertisement, contact the agency advertisement owner. Advertisements include the contact information for the agency advertisement. The agency advertisement owner is the point of contact for vendors with specific questions.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Invitation to Bid District Seven Storm Drain Video Inspection Services Florida Department of

State Government of Florida

Bid Due: 6/08/2026

Description: WOOD DESTROYING ORGANISM (WDO) INSPECTION, REPORT & EXTERMIN Department: Purchasing Buyer: Jordan

Palm Beach County

Bid Due: 10/31/2030

Advertisement Detail Department of Transportation Invitation to Bid Inspection and Roof Repair Systems-Florida's

State Government of Florida

Bid Due: 11/12/2080

Description Department / Buyer Solicitation Number / Type / Category Closing Date and

Palm Beach County