25-031 2025 ADA Sidewalks Improvement Project

Agency: City of Pensacola
State: Florida
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: May 9, 2025
Due Date: Jun 6, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: 25-031 2025 ADA Sidewalks Improvement Project
Category: Bids
Status: Open
Description:

Scope of Work

The goal of this project is the installation of new sidewalk and replacement of dilapidated sidewalks identified as needing repairs. These sidewalks serve neighborhoods with poor walkability.

The 2025 Sidewalk project also includes the improvement of several driveway sections that intersect the sidewalks within the ROW. Those improvements shall be constructed to the provided standard driveway detail. The standard sidewalk is 4” thick but shall be 6” thick where the sidewalk crosses a driveway apron. On streets lined with concrete curbs, a curb cut will be required for the driveway improvements. On streets without curbs, the specified driveway dimensions still apply, but driveways do not require “tie-ins” or construction of new curb. This project also calls for the placement of thermoplastic pavement striping for crosswalks and for the installation of detectable warning plates for pedestrians. Thermoplastic shall be placed beginning at the edge of asphalt.

  • Note that “Q” Street plan set shall be considered a Bid Alternate in its entirety. All work called for in the plans shall be tracked separately from the Scott and Anderson plans.

Utility coordination is the responsibility of the contractor. Surveys indicate the presence of buried utilities in the project areas.


All the project areas are relatively flat, but erosion and sedimentation control measures should be taken where needed to prevent soil runoff away from the project areas. Additionally, work will be performed near vehicular traffic. Maintenance of Traffic (MOT) plans are required and shall be furnished by the contractor.

This project has a 90 calendar-day completion goal following Notice to Proceed.

2025 ADA SIDEWALK PROJECT

Sidewalk Repair

BASE BID

Street Name

Street Segment & Linear Feet

Anderson St.

N. Davis Hwy. to 9 th Ave. (463 ft.)

Scott St.

9 th Ave. to 12 th Ave. (997 ft.)

BID ALTERNATE

N. “Q” St.

Jackson St. to Cervantes St. (670 ft.)

Publication Date/Time:
5/7/2025 8:00 am
Closing Date/Time:
6/6/2025 2:30 pm
Related Documents:
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:

City of St. Petersburg

Bid Due: 6/09/2026

RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View

City of Tampa

Bid Due: 6/11/2026

Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to

Orange County

Bid Due: 6/04/2026

Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract

DEPT OF DEFENSE

Bid Due: 6/09/2026