Accord Pond Pipe and Apparatus Installation
| Agency: | Town of Hingham |
|---|---|
| State: | Massachusetts |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 30, 2025 |
| Due Date: | Jul 21, 2025 |
| Solicitation No: | WRWS61125 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: WRWS61125
Title: Accord Pond Pipe and Apparatus Installation
Addenda: 2
Release Date: 6/18/2025
Due Date: 7/21/2025
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.
According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.
See Also
Bid Number: 27-12 Bid Title: Saint Louis Park Phase 2, addenda 4 issued
City of Lowell
Due by 11/10/2026
Bid Solicitation: BD-21-1021-DFS-DFS01-58331 Header Information Bid Number: BD-21-1021-DFS-DFS01-58331 Description: DFSMH RFR for Sand
Commonwealth of Massachusetts
Due by 12/31/2026
Bid Solicitation: BD-23-1030-CPO1-CPO1-78412 Responses Due in 3272 Days, 4 Hours, 30 Minutes Header
Commonwealth of Massachusetts
Due by 8/01/2031
Header Information Bid Number: BD-26-1026-DOE02-DOE01-129121 Description: 27TALWP1 | Screening Curricular Materials for Alignment
Commonwealth of Massachusetts
Due by 6/29/2029