| Agency: | Town of Hingham |
|---|---|
| State: | Massachusetts |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 18, 2025 |
| Due Date: | Jul 7, 2025 |
| Solicitation No: | WRWS61125 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: WRWS61125
Title: Accord Pond Pipe and Apparatus Installation
Addenda: 0
Release Date: 6/18/2025
Due Date: 7/7/2025
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.
According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: DPW-062226-1100 Bid Title: Dense Grade & Crushed Stone Materials Category: Request
City of Attleboro
Bid Due: 6/22/2026
Bid Number Title Bid Notice Release Date Bid Package File Instructions Addendum Bid
City of Somerville
Bid Due: 6/24/2026
Bid Number: DPW-61026-1100 Bid Title: Hot Mix Picked up by City Category: Request
City of Attleboro
Bid Due: 6/24/2026
Bid Number: IFB 2027-1A Bid Title: Materials without labor, for the DPW, as
Dracut town
Bid Due: 7/01/2026