A24-007 Water Cooled Xray System

Agency: DEPT OF DEFENSE
State: Oklahoma
Type of Government: Federal
FSC Category:
  • 66 - Instruments and Laboratory Equipment
NAICS Category:
  • 334519 - Other Measuring and Controlling Device Manufacturing
Set Aside: Total Small Business Set-Aside (FAR 19.5)
Posted Date: Jan 8, 2025
Due Date: Jan 21, 2025
Solicitation No: FA812525Q0027
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
A24-007 Water Cooled Xray System
Active
Contract Opportunity
Notice ID
FA812525Q0027
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR FORCE MATERIEL COMMAND
Sub Command
AIR FORCE SUSTAINMENT CENTER
Office
FA8125 AFSC PZIMA
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Jan 08, 2025 12:04 pm CST
  • Original Date Offers Due: Jan 21, 2025 03:00 pm CST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Feb 05, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 6680 - LIQUID AND GAS FLOW, LIQUID LEVEL, AND MECHANICAL MOTION MEASURING INSTRUMENTS
  • NAICS Code:
    • 334519 - Other Measuring and Controlling Device Manufacturing
  • Place of Performance:
    Tinker AFB , OK 73145
    USA
Description

A24-007 Water Cooled Xray System 76 AMXG Request for the purchase of 4 ea.



Water Cooled Xray System to include the following:



Input Line Requirements:



Automatically adapts to input line voltage100-130Vac, 50/60Hz, 20 Amperes maximum.



200-250Vac, 50/60Hz, 10 Amperes maximum.



10 to 160kV, 0.5mA to 5.0mA (800 watts max.)



Constant potential, end-grounded anode, liquid cooled version.



X-Ray Tube Window: Beryllium 0.8mm (directional) 40° directional.



Radiation Output: 14R/min at 50cm filtered with 0.5 inches (12.7mm).



aluminum at 160kV, 5mA.



Radiation Leakage: Less than 2.0 Roentgens per hour at 1 meter from the X-Ray tube target.



Effective Focal Spot: Standard: 0.7mm x 1.0mm (0.03in x 0.04in) EN125430.5mm x 0.5mm (0.02in x 0.02in) nominal IEC60336.



Ambient Temp: 100% duty cycle @ 120°F (49°C).



Duty Cycle: 100%.



Storage Temp: -30°F to 160°F (-35°C to 71°C).



Anode Cooling: Liquid coolant solution closed loop between X-Ray tube anode and cooling unit.



Liquid Cooling Unit Weight: 54lbs. (15.4kg) approx.



Tube Head Dimensions: No greater than 7.25" Diameter, 30" Length.



Liquid Cooled: 29lbs. (13.15kg) X-Ray Control Unit: X-Ray Control Unit Weight: 26lbs. (11.8kg) approx.



Safety Devices:



Tubehead Pressure Relief Valve



Tubehead Thermal Cut-Out



Tubehead Pressure Gauge



Tubehead Low Pressure Cut-Out @ 25psi (1.72 Bar)



Coolant Flow Sensor (liquid cooled only)



Control Unit Safety Keyswitch



Microcomputer-based Self Diagnostics



Continuous Exposure Parameter Display



Standard Accessories:



Operation manual



Tubehead carrying case



Tubehead Cable- 100’ with strain relief



Extra key (1) for Control Unit Safety Lock



Power cable - 25’ with strain relief



Coolant hose - twin, 50’ with self-sealing terminations



(liquid cooled only)



Cooler power cable



GUI Control Software for the GUI is specifically designed for controlling series systems. As an alternative to the front panel control, the GUI will allow the user to control all necessary functions of the system from a user-friendly windows-based menu. Additionally, the GUI can be used as a diagnostic tool when the system is controlled via the front panel.


Attachments/Links
Contact Information
Contracting Office Address
  • CP 405 734 9107 3001 STAFF DR STE 2S76
  • TINKER AFB , OK 73145-3303
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Jan 08, 2025 12:04 pm CSTSolicitation (Original)

Related Document

Jan 8, 2025[Sources Sought (Original)] A24-007 Water Cooled Xray System
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow F107 Balancing Tooling Tinker AFB Active Contract Opportunity Notice ID Related Notice

DEPT OF DEFENSE

Due by 9/18/2026

Follow MARKET SURVEY/CAPABILITY ASSESSMENT FOR NATIONAL TEST EQUIPMENT PROGRAM (NTEP) OFFICE (AJW-1610) BLANKET

TRANSPORTATION, DEPARTMENT OF

Due by 9/26/2026

Follow Portable Optical Emission Spectroscopy Testing System Active Contract Opportunity Notice ID FA812526Q0075

DEPT OF DEFENSE

Follow EXPLOSIVE/NARCOTIC DETECTION WORKSTATION Active Contract Opportunity Notice ID FA441926Q0054 Related Notice Department/Ind.

DEPT OF DEFENSE

Due by 9/18/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.