25A: Pleasant Valley WWPS Replacement
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 14, 2026 |
| Due Date: | May 27, 2026 |
| Solicitation No: | GHID2025ACONST |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: THIS PROJECT IS RESTRICTED TO CONTRACTORS THAT HAVE BEEN PREQUALIFIED THROUGH THE CONTRACTOR PREQUALIFICATION EVENT POSTED ON BONFIRE (HTTPS://UTAH.BONFIREHUB.COM/OPPORTUNITIES/220940). ONLY CONTRACTORS APPEARING ON THE PREQUALIFIED BIDDERS LIST ARE ELIGIBLE TO SUBMIT A BID. BIDS SUBMITTED BY NON-PREQUALIFIED CONTRACTORS WILL BE DEEMED NON-RESPONSIVE AND WILL NOT BE CONSIDERED.
The project consists of installing a new wastewater pump station to replace the existing Pleasant Valley Wastewater Pump Station. Construction tasks include excavation for an approximate 30 foot deep wet well and dry well, construction of a masonry building, installation of new sewer piping, and a force main to connect to the existing force main. The project includes site work, electrical, mechanical, and piping within the pump house. The project is located at 5990 West 2920 South in West Valley City, Utah.
The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following:
Mobilization/Demobilization.
Preservation of existing WWPS until replacement is ready to be commissioned.
Excavation for installation of new wet well and dry well structures.
Installation of concrete wet well, dry well, and masonry pump station building.
Installation of all electrical and mechanical equipment inside the wet well, dry well, and
building
Installation of pumps and piping
Installation of new Sewer inlet piping
Installation of new forced main piping
Site work, including landscaping, sidewalk, asphalt, etc.
Demolition of existing WWPS once the new pump station is online.
See Also
Project: General Contractor/Construction Services for Taylorsville High School and West Kearns Elementary Ref.
State Government of Utah
Due by 9/29/2026
Project: NS27-109 Tooele County School District - Copper Canyon Elementary Fencing Upgrades Ref.
State Government of Utah
Due by 9/29/2026
Project: DFCM Construction - Prequalified General Stage II - General- New Storage Building
State Government of Utah
Due by 10/08/2026
Bid # Description Contact Closing Date & Time IFB DG012398 Beef Handling Facility
Utah State University
Due by 10/23/2026