A&E Install Lightning Protection Systems Ph B; FTQW 18-0503
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Nov 6, 2025 |
| Due Date: | Dec 4, 2025 |
| Solicitation No: | 18-0503 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Nov 06, 2025 01:48 pm AKST
- Original Date Offers Due: Dec 04, 2025 10:00 am AKST
- Inactive Policy: Manual
- Original Inactive Date: Dec 04, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: C219 - ARCHITECT AND ENGINEERING- GENERAL: OTHER
-
NAICS Code:
- 541330 - Engineering Services
-
Place of Performance:
Eielson AFB , AK 99702USA
The 354th Eielson Contracting Squadron is seeking qualification packages for A&E service for the project below:
The work included in the scope of A-E Title I Services (Design Phase Services) for this design project encompasses design of Lightning Protection Systems; assessment of the buildings; collecting/reviewing project data and records; developing design concepts and cost estimates; attendance and participation in review meetings; and making revisions requested by the Government. The contractor is expected to submit intermediate design documents and ultimately produce a complete design based on specified requirements and comments received during the 65%, 95%, and 100% design review meetings.
This information will be utilized to prepare comprehensive drawings, schedules, specifications, and cost estimates for all facets of work and disciplines/trades involved in the construction project. The primary objective is to develop a biddable set of construction documents tailored to address the unique challenges presented by the extreme Arctic conditions at Eielson AFB, AK.
The contract schedule set fourth in the statement of work requires a delivery of 100% in 180 calendar days.
If this is something your firm is interested in and accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF-330 (Architect-Engineer Qualification-Standard Form 330), and PPQ (Past Performance Questionnaire) to 354CONS.PKA.Designs@us.af.mil.
- ADMIN ONLY NO REQTN CP 907 377 5207 2310 CENTRAL AVE STE 3
- EIELSON AFB , AK 99702-2200
- USA
- Kimberly Graham
- kimberly.graham.3@us.af.mil
- Phone Number 9073773989
- SrA Christopher Prince
- christopher.prince.3@us.af.mil
- Phone Number 9073773326
- Nov 06, 2025 01:48 pm AKSTSolicitation (Original)
Related Document
| Oct 27, 2025 | [Sources Sought (Original)] A&E Install Lightning Protection Systems; FTQW 18-0503 |
See Also
Follow FTW511 Soldier Performance Readiness Center and FTW515 Unaccompanied Enlisted Housing, Fort Wainwright,
DEPT OF DEFENSE
Due by 10/07/2026
Bid Name ID Status Categories Start Date End Date General Documents That Pertain
City of Ketchikan
Due by 1/06/2030
RFP SCF26-1197 Yagheli Shesh Qenq'a ANPCC I, II, III Renovations Design and Documentation
Southcentral Foundation (SCF)
Due by 10/13/2026
Follow EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK Active Contract Opportunity
DEPT OF DEFENSE
Due by 10/13/2026