A.B. Ernst Park Addition
| Agency: | City of Seattle |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| Posted Date: | Feb 15, 2026 |
| Due Date: | Mar 4, 2026 |
| Solicitation No: | PW#2023-063 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: PW#2023-063
Title: A.B. Ernst Park Addition
Addenda: 0
Release Date: 2/11/2026
Due Date: 3/4/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
Project Description: Park addition project incorporating new play area features and revising existing paving to provide an accessible entrance to the Seattle Public Library. Project includes tree vegetation and soil protection; demolition of existing pavement and walls; clearing and grubbing of site; tree removal; site regrading; removal, protection and replacement of existing artwork. Removal and haul of contaminated rubble, vegetation and soil, loading onto trucks or bins to an approved Waste Management facility, truck and bin availability to be coordinated by contractor, soil disposal by others. Import fill; accessible concrete paving; cast-in-place concrete curbs and walls; installation of new play equipment and surfacing; handrails; plantings and site furnishings. New trees, shrubs and vegetation; new storm and irrigation utilities, connections, and appurtenances. This project includes one alternate and two additives: Alternate 1 – Play Pavement Band, Additive 1 – Second Café Table, and Additive 2 – Second Trash and Recycling.
Engineer's Estimate: Base Estimate: $760,000.00, Alternate#1: $1,331.00, Additive#1: $3,651.00, Additive#2: $1,956.00.
Project Location: 723 N 35th St, Seattle, WA 98103
Timeline
See Also
Follow Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Active
DEPT OF DEFENSE
Due by 12/01/2026
South Reith Road Sidewalk 250-FT East of Military Rd S to 42nd Ave
City of Kent
Due by 11/10/2026
Follow Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Active
DEPT OF DEFENSE
Due by 12/01/2026
Project: BID - EDC - Cedar Warehouse Retaining Wall - Edmonds College Ref.
State Government of Washington
Due by 11/10/2026