Birmingham Airport Authority(Alabama) Government Bid and Contract Opportunities

Results 1 - 50 of 185
Bid Summary

[AL] Restriping Entrance, Exits and Lower-Level Curbs RFQ

Restriping Entrance, Exits and Lower-Level Curbs RFQ (03/20/2025)

Birmingham Airport Authority | Alabama

Posted on 3/20/2025
Due by 4/07/2025

[AL] Valet Parking Concessions RFP

Valet Parking Concessions RFP (03/20/2025)

Birmingham Airport Authority | Alabama

Posted on 3/20/2025
Due by 4/30/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA Addendum #1

Removal and Install of Uninterruptible Power Supply for TSA Addendum #1 (03/18/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA Pre-bid Presentation

Removal and Install of Uninterruptible Power Supply for TSA Pre-bid Presentation (03/10/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025

[AL] Valet Parking RFP

Valet Parking RFP (03/18/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 4/23/2025

[AL] Air Cargo Building 2 Power Supply Addendum #2

Air Cargo Building 2 Power Supply Addendum #2 (03/17/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 4/04/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA RFP

Removal and Install of Uninterruptible Power Supply for TSA RFP (03/03/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025

[AL] Taxiway H Realignment and Strengthening Invitation to Bid

Taxiway H Realignment and Strengthening Invitation to Bid (03/17/2025)

Birmingham Airport Authority | Alabama

Posted on 3/17/2025
Due by 4/17/2025

[AL] Air Cargo Building 2 Power Supply Addendum #1

Air Cargo Building 2 Power Supply Addendum #1 (03/13/2025)

Birmingham Airport Authority | Alabama

Posted on 3/13/2025
Due by 4/04/2025

[AL] Copiers for the Office RFQ

Copiers for the Office RFQ (03/13/2025)

Birmingham Airport Authority | Alabama

Posted on 3/13/2025
Due by 3/31/2025

[AL] Removal and Installation of Uninterruptible Power Supply for TSA Checkpoint Prebid Sign In

Removal and Installation of Uninterruptible Power Supply for TSA Checkpoint Prebid Sign In (03/11/2025)

Birmingham Airport Authority | Alabama

Posted on 3/11/2025
Due by 3/24/2025

[AL] Civil Engineering Services: Runway 24 Approach End Pavement Strengthening Design Addendum #1

Civil Engineering Services: Runway 24 Approach End Pavement Strengthening Design Addendum #1 (03/07/2025)

Birmingham Airport Authority | Alabama

Posted on 3/07/2025
Due by 3/13/2025

[AL] Air Cargo Building 2 Power Supply RFQ

Air Cargo Building 2 Power Supply RFQ (03/06/2025)

Birmingham Airport Authority | Alabama

Posted on 3/06/2025
Due by 3/18/2025

[AL] Christmas Installation and Removal 2025 Pre-Bid Presentation

Christmas Installation and Removal 2025 Pre-Bid Presentation (03/04/2025)

Birmingham Airport Authority | Alabama

Posted on 3/04/2025
Due by 3/12/2025

[AL] Christmas Installation and Removal 2025 Pre-Bid Sign in Sheet

Christmas Installation and Removal 2025 Pre-Bid Sign in Sheet (03/04/2025)

Birmingham Airport Authority | Alabama

Posted on 3/04/2025
Due by 3/12/2025

[AL] Removal and Installation of Uninterruptible Power Supply for TSA Checkpoint

Removal and Installation of Uninterruptible Power Supply for TSA Checkpoint (02/27/2025)

Birmingham Airport Authority | Alabama

Posted on 2/27/2025
Due by 3/24/2025

[AL] Christmas Installation and Removal 2025

Christmas Installation and Removal 2025 (02/13/2025)

Birmingham Airport Authority | Alabama

Posted on 2/14/2025
Due by 3/12/2025

[AL] Civil Engineering Services: Runway 24 Approach End Pavement Strengthening Design

Civil Engineering Services: Runway 24 Approach End Pavement Strengthening Design (02/13/2025)

Birmingham Airport Authority | Alabama

Posted on 2/14/2025
Due by 3/13/2025

[AL] Rideshare Wayfinding Design and Installation Sign In Sheet

Rideshare Wayfinding Design and Installation Sign In Sheet (02/06/2025)

Birmingham Airport Authority | Alabama

Posted on 2/07/2025
Due by 2/14/2025

[AL] Rideshare Wayfinding Design and Installation Pre-bid Presentation

Rideshare Wayfinding Design and Installation Pre-bid Presentation (02/06/2025)

Birmingham Airport Authority | Alabama

Posted on 2/07/2025
Due by 2/14/2025

[AL] Rideshare Wayfinding Design and Installation

Rideshare Wayfinding Design and Installation (01/27/2025)

Birmingham Airport Authority | Alabama

Posted on 1/28/2025
Due by 2/14/2025

[AL] Infrastructure Equipment Addendum #1

Infrastructure Equipment Addendum #1 (01/14/2025)

Birmingham Airport Authority | Alabama

Posted on 1/15/2025
Due by 1/21/2025

[AL] Uninterruptible Power Supply for TSA Checkpoint Addendum #1

Uninterruptible Power Supply for TSA Checkpoint Addendum #1 (01/14/2025)

Birmingham Airport Authority | Alabama

Posted on 1/15/2025
Due by 1/21/2025

[AL] Rideshare Wayfinding Design and Installation- Addendum #1

Rideshare Wayfinding Design and Installation- Addendum #1 (01/13/2025)

Birmingham Airport Authority | Alabama

Posted on 1/14/2025
Due by 1/17/2025

[AL] Infrastructure Equipment RFQ

Infrastructure Equipment RFQ (01/07/2025)

Birmingham Airport Authority | Alabama

Posted on 1/07/2025
Due by 1/21/2025

[AL] Rideshare Wayfinding Design and Installation

Rideshare Wayfinding Design and Installation (12/03/2024)

Birmingham Airport Authority | Alabama

Posted on 1/07/2025
Due by 1/13/2025

[AL] Uninterruptible Power Supply for TSA Checkpoint RFQ

Uninterruptible Power Supply for TSA Checkpoint RFQ (01/07/2025)

Birmingham Airport Authority | Alabama

Posted on 1/07/2025
Due by 1/21/2025

[AL] CCTV Replacement Phase 1- Addendum #2

CCTV Replacement Phase 1- Addendum #2 (12/19/2024)

Birmingham Airport Authority | Alabama

Posted on 12/19/2024
Due by 1/06/2025

[AL] CCTV Replacement Phase 1- Addendum #1

CCTV Replacement Phase 1- Addendum #1 (12/11/2024)

Birmingham Airport Authority | Alabama

Posted on 12/11/2024
Due by 1/03/2025

[AL] Invitation to Bid ATO Space Fitup T-2304 & 2305 - Addendum #2

Invitation to Bid ATO Space Fitup T-2304 & 2305 - Addendum #2 (12/09/2024)

Birmingham Airport Authority | Alabama

Posted on 12/09/2024
Due by 12/12/2024

[AL] Invitation to Bid ATO Space Fitup T-2304 & 2305 - Pre-bid Presentation

Invitation to Bid ATO Space Fitup T-2304 & 2305 - Pre-bid Presentation (12/04/2024)

Birmingham Airport Authority | Alabama

Posted on 12/05/2024
Due by 12/12/2024

[AL] Invitation to Bid ATO Space Fitup T-2304 & 2305 - Pre-bid Sign-in Sheet

Invitation to Bid ATO Space Fitup T-2304 & 2305 - Pre-bid Sign-in Sheet (12/04/2024)

Birmingham Airport Authority | Alabama

Posted on 12/05/2024
Due by 12/12/2024

[AL] CCTV Replacement Phase 1- Pre-bid Presentation

CCTV Replacement Phase 1- Pre-bid Presentation (12/03/2024)

Birmingham Airport Authority | Alabama

Posted on 12/03/2024
Due by 12/20/2024

[AL] CCTV Replacement Phase 1- Pre-bid Sign-in Sheet

CCTV Replacement Phase 1- Pre-bid Sign-in Sheet (12/03/2024)

Birmingham Airport Authority | Alabama

Posted on 12/03/2024
Due by 12/20/2024

[AL] Design and Upgrade LAN Infrastructure and Wi-Fi Systems- Wi-Fi Site Survey

Design and Upgrade LAN Infrastructure and Wi-Fi Systems- Wi-Fi Site Survey (11/25/2024)

Birmingham Airport Authority | Alabama

Posted on 11/25/2024
Due by 12/13/2024

[AL] FAA Part 139 Live Burn & Classroom Simulator Rental for Triennial Exercise

FAA Part 139 Live Burn & Classroom Simulator Rental for Triennial Exercise (11/25/2024)

Birmingham Airport Authority | Alabama

Posted on 11/25/2024
Due by 12/10/2024

[AL] Design and Upgrade LAN Infrastructure and Wi-Fi Systems- Addendum #1

Design and Upgrade LAN Infrastructure and Wi-Fi Systems- Addendum #1 (11/25/2024)

Birmingham Airport Authority | Alabama

Posted on 11/25/2024
Due by 12/13/2024

[AL] Restroom and SARA Renovations - Addendum #1

Restroom and SARA Renovations - Addendum #1 (11/18/2024)

Birmingham Airport Authority | Alabama

Posted on 11/18/2024
Due by 11/27/2024

[AL] Invitation to Bid ATO Space Fitup T-2304 & 2305

Invitation to Bid ATO Space Fitup T-2304 & 2305 (11/15/2024)

Birmingham Airport Authority | Alabama

Posted on 11/15/2024
Due by 12/12/2024

[AL] Design and Upgrade LAN Infrastructure and Wi-Fi Systems - Pre-Bid Presentation

Design and Upgrade LAN Infrastructure and Wi-Fi Systems - Pre-Bid Presentation (11/14/2024)

Birmingham Airport Authority | Alabama

Posted on 11/14/2024
Due by 12/02/2024

[AL] CCTV Replacement Phase 1 RFP

CCTV Replacement Phase 1 RFP (11/12/2024)

Birmingham Airport Authority | Alabama

Posted on 11/12/2024
Due by 12/20/2024

[AL] Design and Upgrade LAN Infrastructure and Wi-Fi Systems

Design and Upgrade LAN Infrastructure and Wi-Fi Systems (11/04/2024)

Birmingham Airport Authority | Alabama

Posted on 11/04/2024
Due by 12/02/2024

[AL] X-Marker L-893 Certified Runway Closure Marker

X-Marker L-893 Certified Runway Closure Marker (11/04/2024)

Birmingham Airport Authority | Alabama

Posted on 11/04/2024
Due by 11/18/2024

[AL] Pressure Wash and Clean the Metal Awning Addendum #1

Pressure Wash and Clean the Metal Awning Addendum #1 (10/29/2024)

Birmingham Airport Authority | Alabama

Posted on 10/29/2024
Due by 11/05/2024

[AL] Elevator and Escalator Maintenance Service Addendum#1

Elevator and Escalator Maintenance Service Addendum#1 (10/24/2024)

Birmingham Airport Authority | Alabama

Posted on 10/24/2024
Due by 11/01/2024

[AL] Pressure Wash and Clean the Metal Awning RFQ

Pressure Wash and Clean the Metal Awning RFQ (10/22/2024)

Birmingham Airport Authority | Alabama

Posted on 10/22/2024
Due by 11/05/2024

[AL] Restroom and SARA Renovations RFQ

Restroom and SARA Renovations RFQ (10/22/2024)

Birmingham Airport Authority | Alabama

Posted on 10/22/2024
Due by 11/27/2024

[AL] Elevator and Escalator Maintenance Service RFP

Elevator and Escalator Maintenance Service RFP (10/18/2024)

Birmingham Airport Authority | Alabama

Posted on 10/18/2024
Due by 11/01/2024

[AL] Installation of Soft Play Kids Play Area Addendum #1

Installation of Soft Play Kids Play Area Addendum #1 (10/11/2024)

Birmingham Airport Authority | Alabama

Posted on 10/11/2024
Due by 10/18/2024

[AL] Installation of Soft Play Kids Play Area- Addendum #1

Installation of Soft Play Kids Play Area- Addendum #1 (10/04/2024)

Birmingham Airport Authority | Alabama

Posted on 10/04/2024
Due by 10/10/2024
Results 1 - 50 of 185

City Index