Solar PV and Electric Vehicle Charger Design, Installation and Operation

Agency: Lake County
State: California
Type of Government: State & Local
NAICS Category:
  • 221114 - Solar Electric Power Generation
  • 237130 - Power and Communication Line and Related Structures Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 541330 - Engineering Services
Posted Date: May 26, 2023
Due Date: Jun 12, 2023
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: Project No. 23-11
Bid Title: Solar PV and Electric Vehicle Charger Design, Installation and Operation
Category: County General
Status: Open

Description:

Statement of Purpose. The primary purpose of this Request for Qualifications and Proposals (RFQ/P) is to identify qualified providers/developers of solar PV installations and EV charging stations to support the County of Lake (“Lake County” or “the County”) in developing a costeffective renewable energy project at their neighboring Courthouse/Administration and District Attorney Buildings in Lakeport, CA, with up to three (3) dual-port EV Charging Stations potentially included in the project. As proposal options (Add Alternates), the County is also interested in incorporating battery energy storage system (BESS) and an islandable Microgrid Energy Management System (MEMS). The County seeks proposals from qualified Proposers for the design and engineering, procurement of materials, permitting, installation, interconnection, and all associated documentation, maintenance, and warranties of turn-key Solar PV, EV Charging Stations, and optionally, BESS and MEMS (collectively referred to as “Systems”) to be located at 375 3rd St. in Lakeport, CA. It is anticipated that the Systems within the scope of this project will be purchased outright by the County, thus alternate financing structures are not requested in the proposal.


Additional (External) Document List

Publication Date/Time:
4/20/2023 12:00 AM
Publication Information:
https://optony.app.box.com/s/ziulrlnkvwe6wrxdsu8vp2zt7lj1uuye
Closing Date/Time:
6/12/2023 5:00 PM
Submittal Information:
facilities@lakecountyca.gov
Addendum Date/Time:
5/1/2023 - 5/11/2013
Plan & Spec Available:
Please see BID Description for Additional (external) documents
Miscellaneous:
Thursday, 6/1/2023 at 5:00 PM PT Deadline for submittal of Proposals
Week of 6/12/2023 Vendor interviews
Friday, 6/23/2023 Select firm for negotiations.
June-August 2023 Vendor contract negotiations
Friday, 8/11/2023 Deadline for County meeting agenda item submittal
Early September 2023 County meeting for approval of contract
September-November 2023 System due diligence, design, and engineering
November-December 2023 County Building Department Review and Approval
December 2023-May 2024 Construction of system and permission to operate
Related Documents:

Attachment Preview

ATTACHMENT B: SYSTEM TECHNICAL SPECIFICATIONS AND REQUIREMENTS
Table of Contents
1. SITE ACCESS ................................................................................................................................................................ 2
2. PROJECT MANAGEMENT ....................................................................................................................................... 2
2.1 Project Manager.......................................................................................................................................................... 2
2.2 Project Schedule.......................................................................................................................................................... 2
2.3 Submittals ................................................................................................................................................................... 3
2.4 Solar and Storage Incentives ....................................................................................................................................... 4
2.5 Interconnection ........................................................................................................................................................... 4
3. SYSTEM DESIGN......................................................................................................................................................... 4
3.1 Design Review Process/ Phases .................................................................................................................................. 4
3.2 Contractors’ License Classification .............................................................................................................................. 5
3.3 Design Submittals........................................................................................................................................................ 5
3.3.1 Plan Set ................................................................................................................................................................... 5
3.3.2 Production Modeling .............................................................................................................................................. 6
3.4 Permits and approvals................................................................................................................................................. 6
3.5 Technical Requirements .............................................................................................................................................. 7
3.5.1 General Considerations .......................................................................................................................................... 7
3.5.2 Electrical Design Standards ..................................................................................................................................... 7
3.5.3 Modules .................................................................................................................................................................. 7
3.5.4 Battery Cells ............................................................................................................................................................ 8
3.5.5 Inverters.................................................................................................................................................................. 8
3.5.6 Electrical Balance of System Components .............................................................................................................. 8
3.5.7 Mounting Systems .................................................................................................................................................. 9
3.5.8 Corrosion Control.................................................................................................................................................... 9
3.5.9 Roofing Requirements .......................................................................................................................................... 10
3.5.10 Shade Structure Requirements ........................................................................................................................ 11
3.5.11 Ancillary Equipment Enclosures ....................................................................................................................... 11
3.5.12 Placards and Signage ........................................................................................................................................ 11
3.5.13 Infrastructure for Ground Mount Systems ....................................................................................................... 12
3.5.14 Wiring and Cabling Runs................................................................................................................................... 12
3.5.15 Grounding and Bonding.................................................................................................................................... 13
3.5.16 Shade Structure Lighting .................................................................................................................................. 13
3.5.17 Monitoring System, DAS, and Reporting .......................................................................................................... 14
3.5.18 FAA Requirements ............................................................................................................................................ 15
3.6 Warranties................................................................................................................................................................. 16
4. PROCUREMENT/CONSTRUCTION ....................................................................................................................16
5. TESTING AND COMMISSIONING........................................................................................................................18
6. OPERATIONS AND MAINTENANCE ..................................................................................................................23
1
1. SITE ACCESS
Contractor shall conform to all County rules and requirements for accessing sites. The County or the
applicable Authority Having Jurisdiction may regulate road usage, road closures, number of vehicles,
access points, etc. Site visits shall be approved, and proper check-in requirements must be followed.
Contractor shall provide signage and/or electronic notification of possible operational impacts upon
County request. Unless otherwise determined by County, Contractor shall be responsible for
providing bathroom and storage facilities for all workers on-site, and shall be responsible for
procuring, installing, securing, and removing temporary security fencing and scaffolding.
2. PROJECT MANAGEMENT
2.1 Project Manager
Contractor shall assign a Project Manager from their firm upon execution of the Agreement and
receipt of Notice to Proceed. The Project Manager shall ensure that all contract, schedule, and
reporting requirements of the Project are met and shall be the primary point of contact for the
County.
2.2 Project Schedule
A Project Schedule is to be prepared and submitted to the County within 10 days of Agreement
execution. The County will review and approve the Project Schedule prior to the initiation of work.
Updates shall be submitted every other week, though the County may allow less frequent updates at
their discretion. The submittal shall be a Critical Path Method (CPM) schedule describing all Project
activities including design, equipment procurement, construction, and commissioning. In particular,
Contractor shall include County review of submittals on the Critical Path. The schedule shall also
reflect the requirement that construction activities must be coordinated to minimize impacts on
normal operations at each site, including ongoing construction activities.
Sufficient information shall be shown on the Project Schedule to enable proper control and
monitoring of the Work. The Project Schedule shall show the intended time for starting and
completing each activity; the duration of each activity; submittal and approval times; design; delivery
of materials, equipment and software; all testing; and other significant items related to the progress
of the Work. The Project Schedule shall include a CPM network diagram of sufficient detail to show
how Mandatory Milestones are intended to be met. If a schedule submitted by Contractor includes
changes affecting the achievement of Mandatory Milestones, Contractor should clearly identify and
justify those changes.
Contractor is encouraged to phase the Work in a way that supports efficient and effective delivery of
design and build services. The following Mandatory Milestones shall be reflected in the schedule and
2
where applicable, represents the dates upon which each milestone is to be achieved for all sites in
this Agreement.
Mandatory Milestones
Mandatory Milestone
Date
50% Schematic Design submittal
90% Design Development submittal
100% Construction Documents submittal for
permitting
Approved Construction Documents
Notice to Proceed
Mobilization
Substantial Completion
Final Completion
2.3 Submittals
Contractor shall provide the following submittals as part of the performance of the Work. The cost of
developing and providing submittals shall be included in the Project price.
Agreement Submittals
Submittal
I. System Design
a. System Design Documentation
b. Warranties
c. Testing Plan
d. Power production modeling
II. Procurements and Construction
a. Safety Plan
b. As-built Documentation
III. Testing
a. Acceptance Test Results
b. Startup Test Results
c. Monitoring Data (Proving Period)
d. Proving Period Report
Submittal Date
At each design milestone
At Construction Documents milestone
At Construction Documents milestone
At Construction Documents milestone
30 days before commencement of
construction
After completion of Proving Period
After Acceptance Test
After Startup Test
Continually throughout Proving
Period
30 days after System Startup
Exhibit D.1
Section
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
3
IV. Training
TBD
a. Training Materials
30 days before Training Session
TBD
b. Monitoring Manual
30 days before Training Session
TBD
c. Operations & Maintenance
Manual
30 days before Training Session
TBD
2.4 Solar and Storage Incentives
Where applicable, Contractor shall submit applications for all available energy incentives or, should
the County already have submitted such applications, assume responsibility for all future
requirements (agreements, submittals, etc.) related to these programs. This includes actions
necessary to ensure compliance with all interconnection agreements and related documents for
County participation and utilization of the benefits of each applicable program. Contractor shall
attend all site verification visits conducted by the applicable public utility or Governmental Authority
and shall assist the County in satisfying the requirements of the incentive program. Contractor shall
be responsible for providing updated documentation to incentive program administrators
throughout the project, as required by rules of the relevant incentive programs.
2.5 Interconnection
Contractor shall be responsible for preparing, submitting, and procuring interconnection application
through appropriate utility and department. Contractor shall accept responsibility for payment for
utility interconnection studies and/or project management that are anticipated and required. All
anticipated utility work (e.g. transformer installation, meter addition) shall be the responsibility of
the Contractor. At project completion, Contractor shall confirm Permission To Operate with the
utility, and shall verify most financially-beneficial rate schedule and billing for the County.
Contractor must comply with all interconnection requirements. Systems installed as part of this
project will be connected under a Net Energy Metering Aggregation (NEMA) Agreement, unless
specified otherwise by County or its agents. Contractor shall be responsible for ensuring the system
design qualifies for a NEMA agreement, as applicable.
3. SYSTEM DESIGN
3.1 Design Review Process/ Phases
The County will review and approve design documentation based on the requirements in this RFP
and as detailed in Section 3.3 of this document. The County may request additional documents as
needed. Prior to the first design submission, the Contractor and County shall agree upon precise
4
organization and format of the design submittals. The County will review all submittals, provide
written comments, and conduct Design Review Meetings for each stage of the process. Contractor
shall provide additional detail, as required, at each successive stage of the Design Review. Contractor
shall not order equipment and materials until Schematic Design submittals have been approved.
Contractor shall not begin construction until Construction Documents have been approved and all
required permits have been obtained. The County will formally approve, in writing, each phase of the
design and is the sole arbiter of whether each phase of the design has been completed. The
Contractor shall not enter a subsequent design phase without the approval of the County.
Contractor is responsible for providing designs approved by the appropriate professional engineers
registered in the State of California. Costs for engineering reviews and approvals shall be borne by
the Contractor. System designs must consider County aesthetic issues and not conflict with any
current County operations.
3.2 Contractors’ License Classification
The County requires that Respondents possess, at the time of submission of a Proposal, at the time
of award of the Agreement and at all time during construction activities, a General Engineering
Contractor License (A), General Building Contractor License (B), Electrical Contractor License (C-10),
or Solar Contractor License (C-46). It shall be acceptable for a Respondent that does not possess a C-
10 or C-46 License to list a Subcontractor with a C-10 or C-46 License.
3.3 Design Submittals
3.3.1 Plan Set
Contractor shall prepare a comprehensive submittal package for each phase of the Work that will be
reviewed and approved by the County. At a minimum, each submittal package shall include the
elements required to convey in sufficient detail the following for each phase of the design, as
applicable:
Site Layout Drawings, with distances from roof edges and existing buildings and equipment
Underground Utilities
Construction Specifications (trenching, mounting, etc.)
Equipment Layout Drawings
Electrical Single-Line and Three-Line Diagrams
Module Stringing Diagrams
Electric Wire and Conduit Schedule
Electrical Warning Labels & Placards Plans
5

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Number Title Type Due Date Issue Date Status DR113478 EV Crossover Vehicles IFB

LA Metro

Bid Due: 10/06/2023

Description Opening Date/Time Closing Date/Time Enclosed Custom Mobile Trailer - Request for Quotations

City of Arcadia

Bid Due: 10/12/2023

Title Start Date End Date Time Left Addendums RFQ #TLARC-RFQ-23-0010 - One (1)

Riverside County

Bid Due: 10/11/2023

Follow PURCHASE AND INSTAL ENGINE AND RELATED PARTS FOR A 2012 F450 AMBULANCE

Federal Agency

Bid Due: 10/06/2023