2019 Sewer Rehabilitation Project

Agency: City of Orem
State: Utah
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Nov 20, 2019
Due Date: Dec 11, 2019
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
2019 Sewer Rehabilitation Project

Written by Carlos Garcia on November 20, 2019. Posted in Bids , Notices

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using SciQuest for the construction of the 2019 Sewer Rehabilitation Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on SciQuest until December 11, 2019 and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using SciQuest at purchasing.utah.gov (Select the search bar > select Current Bids > enter “Orem” > search).

BIDDING QUESTIONS – Use SciQuest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Carlos Garcia (801-229-7318). A mandatory pre-bid meeting will be held on December 3, 2019 at the City Center, 56 North State St, Orem UT 84057, Room #105, at 3:00 pm.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained November 20, 2019 on SciQuest under Orem City 2019 Sewer Rehabilitation Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on SciQuest. There will be a $20 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK includes the installation of approximately 3,970 linear feet of 8” SDR35 PVC sanitary sewer pipe, 409 linear feet of 12” SDR35 PVC sanitary sewer pipe, (24) 60” Ø sewer manholes, (1) 48” Ø sewer manhole, 2,090 linear feet of 8” DI waterline, (4) fire hydrant assemblies, 200 linear feet of 12” SDR35 PVC storm drain pipe, 12 linear feet of 18” SDR35 PVC storm drain pipe, 82 linear feet of 21” SDR35 PVC storm drain pipe, 20 linear feet of 18” RCP irrigation pipe, (8) pre-treatment catch basins, (5) sumps, (4) concrete driveway approaches, and (5) ADA ramps. The engineer’s estimate for the work is $1.7M to $1.9M.

SITE OF WORK: The site of the WORK is located at Orem Boulevard (340 N to 400 N), the entirety of Monterey Drive, 600 North (Monterey Drive to Main Street), 500 North (Monterey Drive to Main Street), 70 West (450 North to 500 North), 75 East (800 North to 990 North), the entirety of Memmo Drive, and the entirety of 315 South.