Sewer Main Lining and Repairs

Agency: City of Newport Beach
State: California
Type of Government: State & Local
Caegory:
  • Z - Maintenance, Repair or Alteration of Real Property
Posted Date: May 3, 2016
Due Date: May 18, 2016
Solicitation No: 6363
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

List of
Plan Holders
Project Name: Sewer Main Lining and Repairs
Project Number: 6363
Bid Opening Date: 5/18/2016 10:00:00 AM
Engineers Estimate: $700,000.00
Scope of Work: Plans, plan holders lists and specs are available via the City's Planetbids Portal at https://www.planetbids.com/portal/portal.cfm?CompanyID=22078 Contractor's Licens "A" required for this project. Project manager: Alfred Castanon 949-644-3314. In order to construct the sewer improvements as shown on the plans, it is understood that the Contractor will need to remove and dispose of and/or replace existing public and private improvements within the vicinity of the work area. The removal and/or replacement will include, but not be limited to, portions of rear property line walls/fencing, chain link fencing, wood fencing, portions of the side yard walls/fencing, trees, landscaping, irrigation, debris, weeds, trash and selective removal/ replacement of private yard s landscaping, hardscaping and irrigation improvements. The City has coordinated with the owners of the private properties in advance of this work. However, the Contractor will need to coordinate with the residents before any work with in the properties including demolition. The Contractor shall keep the work area to a minimum and keep the area clear and minimized disruptions to that which is absolutely required to perform the work. The work necessary for the completion of this contract consists of (1) distributing construction notices to affected residents; (2) construction surveying; (3) removing existing P.C.C. pavement, sidewalk, curb and hardscaping, landscaping and irrigation as needed for new work; (4) constructing sewer improvements including manholes, laterals and cleanouts; (5) constructing sidewalks, P.C.C. pavement, curb, etc.; (6) replacing private yard s landscaping, hardscaping and irrigation improvements; (7) hydro-cleaning existing sewer mains; (8) lining existing sewer main; (9) re-opening existing service lateral; (10) construct entry and exit pits for pipe jacking; (11) install sewer main using pipe jacking methods; (12) remove existing brick drop manhole; (13) plugging or bypassing existing sewers (14) all other incidental items to be completed in place required by the Plans and Specifications. In addition the Contractor shall observe the following: 1. All contacts with the individual residents shall include a City representative. 2. The Contractor will not request the use of the individual properties water or power during the course of its work. 3. The Contractor will not access the work area through the front of the residences, unless otherwise directed by the Engineer. 4. The yards shall be secured from both visual and physical intrusion by means of screened fencing in conjunction with the work. 5. All individual yard fencing, walls and/or gates, shall be restored to a condition equal to or better than that which existed prior to the start of work. 6. The Contractor will restore/ replace all hardscaping, landscaping and irrigation improvements to a condition equal to or better than that which existed prior to the start of work, unless otherwise provided for on the plans or in these specifications. The Contractor is required to restore and/or replace all yard improvements damaged or removed by the Contractor during the course of its work, unless otherwise provided for on the plans, these specifications or as directed by the Engineer. Therefore, the Contractor shall include in its Lump Sum bid for each individual lot s Removal & Reestablishment all work that does not have its own bid item that it deems necessary to be removed and replaced or protected in place and to restore that individual lot to as close to original as possible. In addition, the Contractor shall include protective measures required for each lot within its Lump Sum bid. The Contractor shall not include work that is provided with its own bid item. The successful Contractor will be required to provide a complete breakdown of the Lump Sum bid for each lot for payment purposes. The breakdown shall be provided before the first payment request is submitted. NO payment will be made until this requirement is met and approved by the City.

Contractor Name and Address Telephone Date Picked-up or Sent

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Opportunity History Complete View Original Synopsis Presolicitation Feb 15, 2019 1:55 pm Changed

Department of the Interior

Opportunity History Original Synopsis Apr 02, 2019 8:19 pm Solicitation Number : W912PL-19-S-0020

Department of the Army

Bid Due: 4/23/2019

Opportunity History Complete View Original Synopsis Sources Sought Mar 08, 2019 7:27 pm

Department of the Navy

Bid Due: 5/10/2019

Opportunity History Complete View Original Synopsis Presolicitation Feb 26, 2019 5:55 pm Changed

Department of the Air Force

Bid Due: 4/24/2019