Replace Pocahontas DOT Maintenance Facility Brine Building

Agency: State Government of Iowa
State: Iowa
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 561210 - Facilities Support Services
Posted Date: Aug 8, 2024
Due Date: Aug 27, 2024
Solicitation No: RFB FY2025 #003 Addendum 3
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Bid Information

Type Request for Bid - Formal - Construction
Status Issued
Number RFB FY2025 #003 Addendum 3 (Replace Pocahontas DOT Maintenance Facility Brine Building)
Issue Date & Time 7/30/2024 01:00:02 PM (CT)
Close Date & Time 8/27/2024 01:00:00 PM (CT)
Question Cut Off Date 8/19/2024 10:00:00 PM (CT)
Time Left 18 days 17 hours 50 minutes
Notes
We highly recommend online submission of responses . This expedites the process and reduces errors for both buyer and supplier.
Award: It is the intent of the Iowa DOT to award the contract to the responsible contractor whose submitted quote is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule . Other factors may also include a comprehensive review of bidders past work performance, and work capacity.
Overview
The Iowa DOT is seeking competitive bids for an Iowa licensed contractor to remove and replace the DOT maintenance facility Brine building in Pocahontas, as per the attached plans and specifications. Contractor to properly dispose of all materials from existing building and to maintain the safety of the site during the demolition of existing building and construction of new building as per the attached plans and specifications. Work to be done during regular working hours and days M - F 7:00 am to 3:30 pm CT, coordinating with site supervisor for day-to-day operations.
Site location:
405 NW 7th Street
Pocahontas, IA 50574
A Bid Bond is not required for this solicitation. A Performance Bond will be required of only the Awarded Contractor (see Attribute #3).
Inspection by Iowa State Building Code Bureau.
Awarded Contractor to adhere to warranty as defined in specifications.
Awarded contractor must be an Iowa licensed, bonded and insured contractor.
Electricians must be Iowa licenses bonded and insured.

Communication: Until a contract is awarded the sole point of contact for the solicitation is the Purchasing Agent identified in the solicitation. All questions must be uploaded on the IONWave bid system or directed solely to Teri Schulz at teri.schulz@iowadot.us or Kyle Williams at kylewilliams@iowadot.us on or before August 19, 2024 at 10:00 PM CT. Responses to questions will be communicated out to vendors via DOT’s ION wave bid system.

Responses shall be submitted within DOT’s IONwave Bid System or signed and prepared in ink or typewritten in the solicitation documents provided. Telephonic, email or facsimile responses shall not be considered .

DOT Estimated Start Date: 5/5/2025. This is the onsite start date, Awarded contract may provide submittals following the Notice to Proceed. (This is the estimated start date after all required documents are received (i.e., Insurance, performance bond and vendor signed contract)
Estimated Completion date: 9/19/2025 (This includes resolution to all punch list items, inspections and DOT acceptance typically used in construction bids).
NOTE: Contractors to propose a suggested revised completion date taking into consideration winter weather conditions. This is a required Attribute. See Attribute #11.
Site Visits: A site visit is recommended. Site visits must be completed prior to August 19, 2024. To schedule a site visit contractors must contact Teri Schulz at teri.schulz@iowadot.us or Kyle Williams at kyle.williams@iowadot.us with a date and time of when you want a site visit. Contractors will be required to bring their own equipment needed for the site visit.
Davis-Bacon wages do not apply.
____________________________________________________________________________________________________________
Recommend Pre-Bid:
Date: August 15 2024
Time: 1:00 pm CT

Meeting ID: 244 677 780 529

Passcode: ufA7Pw

Dial in by phone

+1 515-817-6093,,513417710# United States, Iowa City

Find a local number

Phone conference ID: 513 417 710#


________________________________________________________________________________________________
IDOT Bid Opening: This will be held virtually via Microsoft Teams meeting
Date: August 27 2024
Time: 1:00 p.m. CT
Join on your computer, mobile app or room device
Join the meeting now

Meeting ID: 261 531 160 795

Passcode: ktBDTJ

Dial in by phone

+1 515-817-6093,,585231083# United States, Iowa City

Find a local number

Phone conference ID: 585 231 083#

Those who join the public bid opening after 1pm may not hear all the responses read aloud but all responses will be posted publicly for viewing as soon as they become available.
Contact Information
Name Teri Schulz
Address 800 Lincoln Way
Ames, IA 50010 USA
Phone 1 (515) 239-1431
Fax
Email teri.schulz@iowadot.us
Bid Documents
Document name Format
Data pager
Data pager
  • 10
  • 15
  • 20
  • 50

1 items in 1 pages
Bid Invitation (please login to view this document) Acrobat / PDF
Bid Attachments
File Name Description File Size
Data pager
Data pager
Page size:

PageSizeComboBox
select
  • 10
  • 15
  • 20
  • 50

6 items in 1 pages
standardterms_formal 1_18_22.pdf (please login to view this document) Standard Bid Terms and Conditions - Formal 207 KB
Specs.pdf
Specifications 1.31 MB
Pre-Bid Request for sub of prod and materials.pdf
Pre-Bid Request for Substitution of Products or Materials 385 KB
Addendum 1 final.pdf
Addendum 1-Reformatted Plans 2.04 MB
Addendum 2 final.pdf
Addendum 2-added missing sections to specifications 670 KB
Addendum 3- Final.pdf
Revised drawing (MP100 – MECHANICAL AND PLUMBING PLANS)

(Addendum 3- Final.pdf- attached to this document)

This drawing replaces the MP100 found on Page 10 of Addendum 1- Final.pdf
416 KB

Attachment Preview

SECTION 00 0101
PROJECT TITLE PAGE
PROJECT MANUAL
PROJECT: D3 POCAHONTAS BRINE BUILDING REPLACEMENT
PROJECT NUMBER: BG-4P31 (001)--80-76
405 NW 7TH ST., POCAHONTAS, IOWA 50574
OWNER
ISSUED BY:
ARCHITECT
STATE OF IOWA
IOWA DEPARTMENT OF TRANSPORTATION
800 LINCOLN WAY
AMES, IOWA 50010
PURCHASING SECTION
RESOURCES AND ACQUISITIONS BUREAU
IOWA DEPARTMENT OF TRANSPORTATION
800 LINCOLN WAY
AMES, IOWA 50010
ARCHITECTURAL SERVICES
RESOURCES AND ACQUISITIONS BUREAU
IOWA DEPARTMENT OF TRANSPORTATION
800 LINCOLN WAY
AMES, IOWA 50010
DATE:
JULY 2024
END OF SECTION
D3 Pocahontas Brine Building
Replacement
BG-4P31 (001)--80-76
00 0101 - 1
Project Title Page
SECTION 00 0105
CERTIFICATIONS PAGE
ARCHITECT:
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I
AM A DULY REGISTERED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.
STEVE TROST _______________________________________________
PRINTED OR TYPED NAME
_______________________________________________________________
SIGNATURE
DATE
_______________________________________________________________
REGISTRATION EXPIRES
DATE ISSUED
PAGES OR SHEETS COVERED BY THIS SEAL: ___________________________
(SEE TABLE OF CONTENTS) __________________________________________
___________________________________________________________________
___________________________________________________________________
END OF SECTION
D3 Pocahontas Brine Building
Replacement
BG-4P31 (001)--80-76
00 0105 - 1
Certifications Page
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 - Project Title Page
B. 00 0105 - Certifications Page
C. 00 0110 - Table of Contents
D. 00 0115 - List of Drawing Sheets
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 1000 - Summary
B. 01 2000 - Price and Payment Procedures
C. 01 2100 - Allowances
D. 01 3000 - Administrative Requirements
E. 01 3216 - Construction Progress Schedule
F. 01 4000 - Quality Requirements
G. 01 4100 - Regulatory Requirements
H. 01 5000 - Temporary Facilities and Controls
I. 01 5713 - Temporary Erosion and Sediment Control
J. 01 6000 - Product Requirements
K. 01 7000 - Execution and Closeout Requirements
L. 01 7419 - Construction Waste Management and Disposal
M. 01 7800 - Closeout Submittals
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
2.03 DIVISION 03 -- CONCRETE
A. 03 0516 - Underslab Vapor Barrier - Stego Industries
B. 03 1000 - Concrete Forming and Accessories
C. 03 2000 - Concrete Reinforcing
D. 03 3000 - Cast-in-Place Concrete
2.04 DIVISION 05 -- METALS
A. 05 5000 - Metal Fabrications
2.05 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 1753 - Shop-Fabricated Wood Trusses
C. 06 4550 - Simulated Wood Trim
D. 06 8316 - Fiberglass Reinforced Paneling
2.06 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 2100 - Thermal Insulation
B. 07 2119 - Foamed-In-Place Insulation
C. 07 2500 - Weather Barriers
D3 Pocahontas Brine Building
Replacement
BG-4P31 (001)--80-76
00 0110 - 3
Table of Contents
D. 07 2600 - Vapor Retarders
E. 07 2700 - Air Barriers
F. 07 4113 - Metal Roof Panels
G. 07 4633 - Plastic Siding
H. 07 6200 - Sheet Metal Flashing and Trim
I. 07 7123 - Manufactured Gutters and Downspouts
J. 07 9200 - Joint Sealants
2.07 DIVISION 08 -- OPENINGS
A. 08 1613 - Fiberglass Doors
B. 08 3616 - Insulated Sectional Door & Operator _ Type 2
C. 08 5413 - Fiberglass Windows
D. 08 7100 - Door Hardware
E. 08 8000 - Glazing
2.08 DIVISION 09 -- FINISHES
A. 09 9000 - Painting and Coating
2.09 DIVISION 22 -- PLUMBING
A. 22 0500 - Common Work Results for Plumbing -
B. 22 0523 - General Duty Valves for Plumbing Piping -
C. 22 0529 - Hangers and Supports for Plumbing Piping and Equipment -
D. 22 0553 - Identification for Plumbing Piping and Equipment -
E. 22 1116 - Domestic Water Piping -
F. 22 1116 - Domestic Water Piping Speialties -
2.10 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 0500 - Common Work Results for HVAC -
B. 23 0593 - Testing, Adjusting, and Balancing for HVAC -
C. 23 1123 - Facility Natural-Gas Piping -
D. 23 3113 - Metal Ducts -
E. 23 3300 - Air Duct Accessories -
F. 23 3416 - Fans -
G. 23 3700 - Wall Louvers -
H. 23 5533 - Fuel-Fired Unit Heaters -
2.11 DIVISION 26 -- ELECTRICAL
A. 26 0500 - Common Work Results for Electrical -
B. 26 0505 - Selective Demolition for Electrical -
C. 26 0519 - Low-Voltage Electrical Power Conductors and Cables -
D. 26 0526 - Grounding and Bonding for Electrical Systems -
E. 26 0529 - Hangers and Supports for Electrical Systems -
F. 26 0533.13 - Conduit for Electrical Systems -
G. 26 0533.16 - Boxes for Electrical Systems -
H. 26 0553 - Identification for Electrical Systems -
I. 26 2416 - Panelboards -
D3 Pocahontas Brine Building
Replacement
BG-4P31 (001)--80-76
00 0110 - 3
Table of Contents
J. 26 2726 - Wiring Devices -
K. 26 2813 - Fuses -
L. 26 2816.16 - Enclosed Switches -
M. 26 2913 - Enclosed Controllers -
N. 26 5100 - Interior Lighting -
O. 26 5600 - Exterior Lighting -
2.12 DIVISION 31 -- EARTHWORK
A. 31 2200 - Grading
B. 31 2316 - Excavation
C. 31 2316.13 - Trenching
D. 31 2323 - Fill
2.13 DIVISION 32 -- EXTERIOR IMPROVEMENTS
A. 32 1123 - Aggregate Base Courses
B. 32 1313 - Concrete Paving
END OF SECTION
D3 Pocahontas Brine Building
Replacement
BG-4P31 (001)--80-76
00 0110 - 3
Table of Contents
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Jacobson Athletic Building-Elevator-Improvements Prebid Meeting: 8/28/2024 10:00:00 AM Prebid location: via WebEx Tours:

Iowa State University

Bid Due: 9/12/2024

Project Name Const Budget Design Professional PreBid PreBid Time Bid Date Power Plant

University of Northern Iowa

Bid Due: 9/17/2024

Bid Information Type Request for Bid - Formal - Construction Status Issued Number

State Government of Iowa

Bid Due: 9/17/2024

Bid Information Type Invitation to Bid Status Issued Number 25-8 (Goose Creek Trail

City of Davenport

Bid Due: 9/11/2024