NSCF DDC CONTROLS REPLACEMENT

Agency: State Government of Vermont
State: Vermont
Type of Government: State & Local
NAICS Category:
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Oct 12, 2020
Due Date: Dec 2, 2020
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
NSCF DDC CONTROLS REPLACEMENT Request Date: 10/12/2020 4:16:33 PM
Open Date:
Closing Date: 12/2/2020 4:30 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:

Buildings & General Svs, Facilities Division

Two Governor Aiken Avenue
Drawer 33
Montpelier , VT 05633-5801

Bid Type:
Job Contract

Locations:
Orleans
Keywords:
Construction (Building)

Bid Description:
Correctional Facility (NSCF) for the Department of Buildings and General Services located at 2559 Glen Road in Newport, Vermont. This project consists of replacement of the DDC Control systems, to include, but not limited to: • Provide a peer to peer high speed communications bus. • Replacement of all existing JCI controllers. • Provide interoperable communication capabilities for third-party controllers: BACnet, LonWorks or Modbus. • Communicate with one of the existing virtual DDC controls servers. • Replace all system components that are not compatible with the new controllers. • Replace all sensors that are over 5 years old. • Replace all sensors that allow user input. • Replace all transmitters. • Replace all pneumatic components. • Replace all actuators that are not direct-coupled. • Replace all actuators that are powered when in the "normal" position. (Beer can hydraulic actuators are an example of this). • Replace all freezestats. • Replace most of the 3-way reheat valves with 2-way valves to allow pump VFD's to track load. • Add CT's or other feedback mechanism to any motor that is commanded by the system to verify motor status, do not use dP switches. • Provide airflow stations to each AHU to show total airflow through the unit. • Work shall be sequenced to complete one building before progressing to the next. • If new items do not fit in the same location as the device it is replacing, provide new wires that are long enough or provide terminal blocks, wire nut splices are not allowed. • After all work is complete in a building turn off the compressed air to the building, and watch the building to be sure everything still functions properly. • Commission each building system when it is complete. Sealed Bids accompanied by proper Bid Security will be received by the Department of Buildings and General Services, at 109 State Street, Montpelier, Vermont 05609-3001, until 4:30 PM on December 2, 2020, at which time they will be opened and tabulated. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Private Plan Room. Contractor’s shall obtain password to access this project from Blueprints. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased. Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation Revision Date: February 27, 2019 Page | 2 resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda, and must so state the number of addenda they have received on the proposal. 3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own risk as there is one official source of information for documents as indicated above. There will be a non-mandatory pre-bid meeting at the site on October 29, 2020 at 10:00 AM Interested parties will meet in the front lobby of the facility. Please have a government issued ID. No weapons, tobacco or cell phone are allowed in the facility. Please be prompt, as if parties are late, they may be denied access. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 4:30 PM on November 12, 2020. All questions should include NSCF DDC Controls Replacement Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. Bidder’s attention is directed to: 1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly read and comply with all requirements. Please pay close attention due to changes that have been made. 2. Funding Source: This project is being funded, in whole or in part, through the state’s capital construction act(s) and shall require compliance with the Vermont Prevailing Wage and Fringe Benefit Rate requirements (reference Instructions to Bidders, Prevailing Wage Rate Requirements). A complete list of occupations and associated wage rates are available on the internet at: http://www.vtlmi.info/lmipub.htm . 3. BIDDER QUALIFICATION PROCESS DOCUMENT: The Department of Buildings and General Services is requiring that all contractors meet certain minimum qualifications to be eligible to bid on this project. 4. BID SUBMISSION INSTRUCTIONS: a. CLOSING DATE: Bids must be received by the due date and at the location specified on the front page of this RFP. Revision Date: February 27, 2019 Page | 3 b. The bid opening will be held at 109 State Street, Third Floor, Montpelier, VT and is open to the public. c. SECURITY PROCEDURES: Please be advised extra time will be needed when visiting and/or delivering information to 109 State Street. All individuals visiting 109 State Street must present a valid government issued photo ID when entering the facility. d. SEALED BID INSTRUCTIONS: All bids must be sealed and must be addressed to the State of Vermont, Office of Purchasing & Contracting, 109 State Street – Third Floor, Montpelier, VT 05609-3001. BID ENVELOPES MUST BE CLEARLY MARKED ‘SEALED BID’ AND SHOW THE PROPOSAL TITLE, OPENING DATE AND NAME OF BIDDER. e. All bidders are hereby notified that sealed bids must be received and time stamped by the Office of Purchasing & Contracting located at 109 State Street – Third Floor, Montpelier, VT 05609-3001 - by the time of the bid opening. Bids not in possession of the Office of Purchasing & Contracting at the time of the bid opening will be returned to the vendor, and will not be considered. Any delay deemed caused by Security Procedures or courier/mail delivery service will be at the bidder’s own risk. f. Office of Purchasing & Contracting may, for cause, change the date and/or time of bid openings or issue an addendum. If a change is made, the State will make a reasonable effort to inform all bidders by posting at: http://www.blueprintsetc.com . g. All bids will be publicly opened. Typically, the Office of Purchasing & Contracting will open the bid, read the name and address of the bidder, and read the bid amount. However, the Office of Purchasing & Contracting reserves the right to limit the information disclosed at the bid opening to the name and address of the bidder when, in its sole discretion, the Office of Purchasing & Contracting determines that the nature, type, or size of the bid is such that the Office of Purchasing & Contracting cannot immediately (at the opening) determine that the bids are in compliance with the RFP. As such, there will be cases in which the bid amount will not be read at the bid opening. Bid openings are open to members of the public. Bid results are a public record however, the bid results are exempt from disclosure to the public until the award has been made and the contract is executed. 5. DELIVERY METHODS: a. SECURITY PROCEDURES: Note that security procedures concerning delivery of any mail or parcels to 109 State Street may delay receipt of mail/parcel pieces by one business day. b. U.S. MAIL: Bidders are cautioned that it is their responsibility to originate the mailing of bids in sufficient time to ensure bids are received and time stamped by the Office of Purchasing & Contracting prior to the time of the bid opening. c. EXPRESS DELIVERY: If bids are being sent via an express delivery service, be certain that the RFP designation is clearly shown on the outside of the delivery envelope or box. Express delivery packages will not be considered received by the State until the express delivery package has been received and time stamped by the Revision Date: February 27, 2019 Page | 4 Office of Purchasing & Contracting. Due to security procedures express deliveries must be received by 10:30 AM in order to be received by the Office of Purchasing & Contracting that same day. d. HAND DELIVERY: Hand carried bids shall be delivered to a representative of the Office of Purchasing & Contracting prior to the bid opening. e. ELECTRONIC: Electronic bids will be accepted. f. FAX BIDS: Faxed bids will not be accepted. 6. Full Bonding is required for this job. 7. SUBMITTAL EXCHANGE®: Contractor shall obtain a license for the State to utilize Submittal Exchange for the purposes of this project. The State and its representatives will have full control of the use of Submittal Exchange by authorized users of the State. Submittal Exchange®, a web-based collaboration software system, shall be used to provide an on-line database and repository, which shall be used to transmit and track project-related documents. Based on an existing contract between the State and Submittal Exchange, the State anticipates that training and support during this project will be provided by Submittal Exchange at no additional cost to the selected contractor(s). 8. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and General Services (BGS) may require contractor evaluations on construction projects over $100,000 or at the discretion of the BGS Director. Evaluations will be used to compile contractor’s performance on BGS projects to provide a history and assessment of the contractor’s performance. 9. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation.
Special Instructions:
QUESTIONS DUE: November 12, 2020 @ 4:30 PM QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 4:30 PM on November 12, 2020.
Contact Information:
James Meyers
Phone: (802) 828-2215
Fax:
Email: BGS.OPCVendorDocs@vermont.govbg
For additional information: blueprintsetc.com/
Bid Attachments:
Site Visit: Date: 10/29/2020 10:00:00 AM

There will be a non-mandatory pre-bid meeting at the site on Thursday, October 29, 2020 at 10:00AM.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Burton Island State Park Toilet Building Renovations and New Shower Buildings REBID Request

State Government of Vermont

Bid Due: 3/24/2021

BGS-TK-160187-FLOORING AND CEILING REPLACEMENT PHASE 1, 100 MINERAL STREET, SPRINGFIELD, VT Request Date:

State Government of Vermont

Bid Due: 1/27/2021

CLERK-OF-THE-WORKS ZAMPIERI BUILDING PARKING GARAGE STRUCTURAL REPAIRS, 108 CHERRY ST., BURLINGTON, VT Request

State Government of Vermont

Bid Due: 2/03/2021

Title Question Due Answers posted Due date No posting After CLERK-OF-THE-WORKS ZAMPIERI BUILDING

State of Vermont

Bid Due: 2/03/2021