8124 Loeb Bank Restoration: Design Proposal

Agency: State Government of Oregon
State: Oregon
Type of Government: State & Local
Caegory:
  • C - Architect and Engineering Services - Construction
Posted Date: Oct 11, 2017
Due Date: Nov 13, 2017
Solicitation No: OPRD-1008-17
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
A&E Informal Proposal (RFP) 8124 Loeb Bank Restoration: Design Proposal
(Prod)
Only Manual Bids Allowed
Issued By
OPRD - Agency - OREGON DEPARTMENT OF PARKS AND RECREATION
Salem HQ
725 Summer St. NE, Suite C
Salem, Oregon
97301
Contact Margie Becker (DPO/Buyer)
Phone 1 (503) 986-0699
Fax 1 (503) 986-0648
Email m?a?r?g?i?e?.?a?.?b?e?c?k?e?r?@?O?r?e?g?o?n?.?g?o?v?
Opportunity #
OPRD-1008-17
Publish Date & Time
10/11/2017 11:17 AM
Closing Date & Time
11/13/2017 3:00 PM
Time Zone
Pacific Time
Approx. Time Remaining
All dates are mm/dd/yyyy
Attachments Exist
Issued For
OPRD - Agency - OREGON DEPARTMENT OF PARKS AND RECREATION
Salem HQ
725 Summer St. NE, Suite C
Salem, Oregon
97301
Opportunity Comments
OPRD will conduct a VOLUNTARY pre-Proposal conference on October 26, 2017 at 1 p.m. and on November 1, 2017 at 1 p.m. Interested parties may attend either date. The Conference will be held at Loeb State Park Day Use Area. Please contact Sherri Laier at 541-888-4902 ext. 245 if you have any questions about the Voluntary Pre-Proposal Conference.
Opportunity Summary
Alfred A. Loeb State Park is a 320-acre park east of Brookings, Oregon owned and managed by Oregon Parks and Recreation Department (OPRD). Likely due to channel modifications and land use changes in the watershed over the last several decades, the upper reach of the Chetco River flowing through the park is undergoing severe erosion and bank loss within the park boundary that poses safety risks and continued loss of soil.

Consultant will develop a cost-effective option that protects and/or enhances natural resources values (wildlife habitat) while providing long-term stability in terms of geomorphic processes. Once the best option is chosen, a design will be developed that will be sufficient for obtaining permits and used for construction.

Consultant shall use its team of river restoration professionals to develop site characterization, alternative analysis, applicable permit filing and acquisition, and construction ready design drawings for this project. Consultant shall include the following design elements: toe stabilization utilizing appropriate sized boulders with large wood (including root wads) and the utilization of bio-engineering methods with native plant materials.

Geographic Work Scope

The geographic work scope is located at Alfred A. Loeb State Park in Curry County, Oregon in the following Township/Range and Section: T40S R13W Section 13. The location and boundary of the project is illustrated on the attached map. The goals of this project will be to:
1. Stabilize Chetco River bank utilizing an approach suitable for the site.
2. Promote improved aquatic habitat conditions utilizing natural materials and considerations of use by salmonid species.
3. Improve riparian conditions likely to promote native vegetation establishment.
4. Improve stability of trail system.
Delivery Requirements
stated in solicitation document
Payment Terms
Net 30
FOB
(Not Applicable)
Total
Including all charges
US Dollars Only
Manual & Electronic response must express an interest. Manual response must 1st DOWNLOAD the document. Electronic Response [if allowed] ? must express interest; select Respond Online & complete response. Instructions can be found in the HELP screens
Control Number: 1947153
Master File: ORPIN-96791-17

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Notice ORCPP Notice ORCPP Bid/RFP RFP 3475 ADA and Wayfinding Master Signage Design

State Government of Oregon

Bid Due: 2/27/2018

Opportunity No Organization Name Published Date Closing Date 730-SCP091A-15 ODOT - Agency -

State Government of Oregon

Bid Due: 4/11/2025

Notice ORCPP Notice ORCPP Bid/RFP Fire Station 13 Seismic Upgrades (Prod) Only Manual

State Government of Oregon

Bid Due: 3/07/2018

Request for Proposal (RFP) TSUNAMI EVACUATION FACILITIES IMPROVEMENT PLANNING FOR REEDSPORT (Prod) Only

State Government of Oregon

Bid Due: 3/09/2018