Agency: | City of Beaverton |
---|---|
State: | Oregon |
Type of Government: | State & Local |
NAICS Category: |
|
Posted Date: | Apr 7, 2023 |
Due Date: | Apr 27, 2023 |
Original Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
Project #: |
4000-23 |
Issued by: | City of Beaverton, OR |
Publish Date: | Apr 6, 2023 2:00PM |
Bids Due Date: |
Apr 27, 2023 2:00PM (Pacific Standard Time) add to calendar |
Status: |
open |
Posted: | Apr 6, 2023 |
The City of Beaverton is accepting will only accept electronic bids for the project, Construction of ADA Curb Ramp Retrofit Upgrade Project, Project No. 4000-23 It is the City’s intent to enter into a one-year contract, with the option to renew for an additional one-year term; the total term will not exceed two years. Year one project consists of removal of 2,375 feet of curb, removal of 1,191.3 square yards of walk and driveways, 505 square yards of 4” asphalt pavement repairs approximately requiring 96 tons of asphalt, placing 2,375 feet of curb and gutter, placing 10,026 square feet of monolithic curb and sidewalk and approximately 110 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Year two project consists of 1777 feet of curb, removal of 1,285 square yards of walk and driveways, 439 square yards of 4” asphalt pavement repairs approximately requiring 84 tons of asphalt, placing 1,383 feet of curb and gutter, placing 13,412 square feet of monolithic curb and sidewalk and approximately 132 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Both projects are on-site design-build with no plans for ADA curb ramps design.
This solicitation has the following line items for which you can
submit a bid. Please review the bidding instructions in the bid
documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Required? |
BID SCHEDULE A | ||||
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 35.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 2175.00 | |
7 | Removal of Walks & Driveways | SY | 1091.30 | |
8 | Asphalt Pavement Saw Cutting | FT | 2489.00 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 46.00 | |
WEARING SURFACES | ||||
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 505.30 | |
12 | Concrete Curb, Curb and Gutter | FT | 2175.00 | |
13 | Monolithic Curb and Sidewalk | SF | 9825.50 | |
14 | Truncated Dome on New Surface | SF | 1130.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
15 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
16 | Single Mailbox Support | EA | 6.00 | |
17 | Reinstall USPS Cluster Mailbox | EA | 2.00 | |
WATER SUPPY SYSTEM | ||||
18 | Relocate Irrigation System | LS | 1.00 | |
BID SCHDULE B | ||||
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 18.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 1677.00 | |
7 | Removal of Walks and Driveways | SY | 1185.40 | |
8 | Asphalt Pavement Saw Cutting | FT | 2164.50 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 8.00 | |
WEARING SURFACES | ||||
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 439.20 | |
12 | Concrete Curb, Curb | FT | 82.50 | |
13 | Concrete Curb, Curb and Gutter | FT | 1183.20 | |
14 | Monolithic Curb and Sidewalk | SF | 12412.20 | |
15 | Truncated Dome on New Surface | SF | 736.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
16 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
17 | Single Mailbox Support | EA | 1.00 | |
18 | Reinstall USPS Cluster Mailbox | EA | 1.00 | |
WATER SUPPY SYSTEM | ||||
19 | Relocate Irrigation System | LS | 1.00 |
This project has the following solicitation documents.
Bid Document | File Size | Notes |
1,035,183 |
||
153,089 |
||
80,600 |
||
84,586 |
||
135,430 |
||
151,463 |
||
436,781 |
||
605,744 |
||
464,744 |
||
465,162 |
||
A Non-Mandatory pre-bid conference for this project will be held by conference call using Zoom on 4/18/2023 at 10:00 AM.
https://www.zoomgov.com/my/beavertonprocurement
Pre-Bid Conference Date |
Apr 18, 2023 10:00AM (Pacific Standard Time) add to calendar |
There are currently no questions that have been answered
by City of Beaverton, OR.
When the question and answer period is open, vendors may
submit their questions on this solicitation to be
answered by City of Beaverton, OR.
Name: Michael Phillips
Email:
bidmail@BeavertonOregon.gov
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Solicitation: S-63400-00011346 Responses Due in 21 Days, 22 Hours, 19 Minutes Header
State Government of Oregon
Bid Due: 9/12/2024
1700 Millrace Interior Renovation Projects Campus Planning and Facilities Mgmt > CPFM Design
University of Oregon
Bid Due: 9/10/2024
Bid Solicitation: S-KE0010-00011321 Responses Due in 22 Days, 23 Hours, 25 Minutes Header
State Government of Oregon
Bid Due: 9/11/2024
Allocation - Remediate Fire Damage at Bridge Shops - GC Pool B -
Multnomah County
Bid Due: 9/09/2024