Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest

Agency: Department of Agriculture
State: Colorado
Type of Government: Federal
FSC Category:
  • Z - Maintenance, Repair or Alteration of Real Property
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Set Aside: Total Small Business
Posted Date: Jun 26, 2019
Due Date:
Solicitation No: 1282X919R0005
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Opportunity History
  • Original Synopsis
    Jun 25, 2019
    6:04 pm
Solicitation Number :
1282X919R0005
Notice Type :
Presolicitation
Synopsis :
Added: Jun 25, 2019 6:04 pm
The US Forest Service Rocky Mountain Regional Office (Region 2) Acquisition Management Branch has requirement for a contractor to replace the Horseshoe CG Bridge Superstructure on the Arapaho-Roosevelt National Forest.

The work shall consist of what is shown on the plans, stated in the specifications, and summarized below:
• Implement traffic control plan including closing bridge and road closed ahead signs.
• Remove existing bridge superstructure, timber caps/sills, and approach railing. All materials removed will become property of the contractor.
• Repair spalled concrete
• Install new timber caps/sills
• Install new timber superstructure.
• Install the bridge railing, approach railing and object markers.
• Install the aggregate surface course


The actual work is anticpated to begin in the spring of 2020, with the award being made in summer of 2019.

The complete solicitation package is 100% complete and will be attached and made available only through the FedBizOpps (FBO) website at https://fbo.gov/ on or after July 9, 2019. Anyone wishing to participate in this proposed procurement must obtain their copy from FBO. Copies will not be mailed from the Contracting Office. All amendments will be posted on FBO. Contractors will be solely responsible for obtaining amendments from this site to update files.

This requirement will be a total small business set-aside in accordance with FAR 19.5.

Applicable Construction Wage Determinations for Summit County, CO will be included with solicitation and resulting award.

Camping will be allowed, but a proper camping permit must first be obtained.


There is a prebid meeting scheduled for July 12, 2019. The exact location and time WILL be provided at the time the full solicitation is posted in FBO.


NOTE 1: All prospective contractors must be registered in the System for Award Management (SAM) database at http://www.sam/gov/ before award of contract; failure to register in the SAM database will cause your firm to be ineligible for the award and removed from consideration.


NOTE 2: As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 2902, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.


NOTE 3: All Construction shall conform to the specifications in the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, U.S. Customary Units" publication FP-14, 2014 Edition. This publication may be obtained from: https://flh.fhwa.dot.gov/resources/specs/


Contracting Office Address :
1617 Cole Blvd, Building 17
Job Corps Acquisition Support Branch
Lakewood, Colorado 80401
United States
Place of Performance :
The bridge is located in the Arapaho Roosevelt National Forest. From Silverthorne take CO-9 for 12.9 miles, turn right onto Ute Pass Road for 5.2 miles, continue on County Road 3 for 6.6 miles, turn right on County Highway 32 for 0.1 miles.
Silverthorne, Colorado
United States
Primary Point of Contact. :
Brian N. McCabe,
Contract Specialist
Phone: 3032755305
General Information
Notice Type:
Presolicitation
Posted Date:
June 25, 2019
Response Date:
-
Archiving Policy:
Manual Archive
Archive Date:
-
Original Set Aside:
N/A
Set Aside:
Total Small Business
Classification Code:
Z -- Maintenance, repair, and alteration of real property
NAICS Code:
237 -- Heavy and Civil Engineering Construction/237310 -- Highway, Street, and Bridge Construction

Related Document

Jul 9, 2019[Presolicitation] Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest
Jul 18, 2019[Presolicitation] Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest
Jul 30, 2019[Presolicitation] Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest
Aug 6, 2019[Presolicitation] Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest
Sep 4, 2019[Award] Horseshoe CG Bridge Superstructure Replacement - Arapaho-Roosevelt National Forest

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Opportunity History Original Synopsis Jul 19, 2019 11:22 am Solicitation Number : 89503119BWA000017

Department of Energy

Opportunity History Original Synopsis Aug 27, 2019 12:59 pm Solicitation Number : 36C25919R0182

Department of Veterans Affairs

Opportunity History Original Synopsis Sep 11, 2019 8:23 pm Solicitation Number : 47PJ0019R0205

General Services Administration

Bid Due: 10/17/2019

Opportunity History Original Synopsis Sep 17, 2019 12:11 pm Solicitation Number : 15B40319B00000001

Department of Justice

Bid Due: 11/05/2019