Bid Solicitation: SPD123-SPDAD-4822
|
Header Information
|
Bid Number:
|
SPD123-SPDAD-4822
|
Description:
|
Glen Helen Small Bridge Project
|
Bid Opening Date:
|
01/31/2023 02:00:00 PM
|
Purchaser:
|
Jason Cloninger
|
Organization:
|
Special Districts
|
Department:
|
SPDADMIN - ADMINISTRATION
|
Location:
|
ADENG - Engineering
|
Fiscal Year:
|
23
|
Type Code:
|
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
12/08/2022 12:00:00 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Mandatory Prebid meeting will be held onsite January 11th 2023 at 10 am. 2555 Glen Helen Pkwy, San Bernardino, CA 92407. Meeting will be by existing wood bridge by fishing lake.
|
Bulletin Desc:
|
|
|
Ship-to Address:
|
Special Districts Admin
Reception
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: mona.montes@sdd.sbcounty.gov
Phone: (909)386-8800
|
Bill-to Address:
|
Special Districts Department
Fiscal Specialist
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: mona.montes@sdd.sbcounty.gov
Phone: (909)386-8828
|
Print Format:
|
|
File Attachments:
|
Bid Package - Section A - Bidding Requirements~3.pdf
Bid Package - Section B - Contract Agreement And Bonds -ADG-Rev.1-.pdf
Bid Package - Section C - Prevailing Wages~4.pdf
Bid Package - Section D - General Conditions~4.pdf
Bid Package - Section G - Bridge Info and Location.pdf
Bid Package - Section E - Special Condition~2.pdf
Bid Package - Section F - Technical Specifications~3.pdf
Bid Package - Section H - GeoTechnical Report.pdf
Addendum 1~8.pdf
Pre bid Attendance.pdf
Addendum 2~2.pdf
Glen Helen Bridge Questions.pdf
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
01/04/2023 05:38:53 PM
|
Header 1. Bid Opening Date changed from "01/19/2023 02:00:00 PM" to "01/26/2023 02:00:00 PM". 2. Pre-Bid Conference changed from "Mandatory Prebid meeting will be held onsite January 5th 2023 at 10 am. 2555 Glen Helen Pkwy, San Bernardino, CA 92407. Meeting will be by existing wood bridge by fishing lake." to "Mandatory Prebid meeting will be held onsite January 11th 2023 at 10 am. 2555 Glen Helen Pkwy, San Bernardino, CA 92407. Meeting will be by existing wood bridge by fishing lake.". Attachment File Changes: Header 1. File 'Addendum 1~8.pdf': File 'Addendum 1~8.pdf' added .
|
2
|
01/12/2023 11:31:28 AM
|
Attachment File Changes: Header 1. File 'Pre bid Attendance.pdf': File 'Pre bid Attendance.pdf' added .
|
3
|
01/19/2023 10:27:31 AM
|
Header 1. Bid Opening Date changed from "01/26/2023 02:00:00 PM" to "01/31/2023 02:00:00 PM". Attachment File Changes: Header 1. File 'Addendum 2~2.pdf': File 'Addendum 2~2.pdf' added . 2. File 'Glen Helen Bridge Questions.pdf': File 'Glen Helen Bridge Questions.pdf' added .
|
|
|
Item # 1:
(
913
-
66
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the demolition and proper disposal of the existing wood bridge and abutments, the procurement of a pre-fabricated steel structure bridge as specified in the Specifications, construction of abutments designed by the bridge manufacturer, installation and finishing of the new steel structured pre-fabricated bridge as well as the repair and repainting of a second small pedestrian bridge.
|
|
NIGP Code:
|
913-66
Maintenance and Repair, Bridges
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
913
-
13
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the demolition and proper disposal of the existing wood bridge and abutments, the procurement of a pre-fabricated steel structure bridge as specified in the Specifications, construction of abutments designed by the bridge manufacturer, installation and finishing of the new steel structured pre-fabricated bridge as well as the repair and repainting of a second small pedestrian bridge.
|
|
NIGP Code:
|
913-13
Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
Copyright © 2022 Periscope Holdings, Inc. - All Rights Reserved.
BERNARDINO_SBCOUNTY_AWS_PROD_BUYSPEED_1_bso
|
|