Agency: | City of Beaverton |
---|---|
State: | Oregon |
Type of Government: | State & Local |
NAICS Category: |
|
Posted Date: | Feb 2, 2023 |
Due Date: | Mar 3, 2023 |
Bid Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
Project #: |
3982-23 |
Issued by: | The City of Beaverton |
Publish Date: | Feb 1, 2023 8:00PM |
Bids Due Date: |
Mar 3, 2023 2:00PM (Pacific Standard Time) add to calendar |
Status: |
open |
Posted: | Feb 1, 2023 |
The City of Beaverton is accepting will only accept electronic bids for the project, CONSTRUCTION OF ADA CURB RAMP RETROFIT UPGRADE PROJECT. , Project No. 3982-23 . It is the City’s intent to enter into one-year contract with the option to renew for additional one-year term with the total term not to exceed two years. Year one project consists of removal of 2,175 feet of curb, removal of 1,091.3 square yards of walk and driveways, 505 square yards of 4” asphalt pavement repairs approximately requiring 96 tons of asphalt, placing 2,175 feet of curb and gutter, placing 9,826 square feet of monolithic curb and sidewalk and approximately 110 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Year two project consists of 1677 feet of curb, removal of 1,185 square yards of walk and driveways, 439 square yards of 4” asphalt pavement repairs approximately requiring 84 tons of asphalt, placing 1,183 feet of curb and gutter, placing 12,412 square feet of monolithic curb and sidewalk and approximately 132 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Both projects are on-site design-build with no plans for ADA curb ramps design.
This solicitation has the following line items for which you can
submit a bid. Please review the bidding instructions in the bid
documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Required? |
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 35.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 2175.00 | |
7 | Removal of Walks & Driveways | SY | 1091.30 | |
8 | Asphalt Pavement Saw Cutting | FT | 2489.00 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 46.00 | |
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 505.30 | |
12 | Concrete Curb, Curb and Gutter | FT | 2175.00 | |
13 | Monolithic Curb and Sidewalk | SF | 9825.50 | |
14 | Truncated Dome on New Surface | SF | 1130.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
15 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
16 | Single Mailbox Support | EA | 6.00 | |
17 | Reinstall USPS Cluster Mailbox | EA | 2.00 | |
WATER SUPPY SYSTEM | ||||
18 | Relocate Irrigation System | LS | 1.00 | |
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 18.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 1677.00 | |
7 | Removal of Walks and Driveways | SY | 1185.40 | |
8 | Asphalt Pavement Saw Cutting | FT | 2164.50 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 8.00 | |
WEARING SURFACES | ||||
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 439.20 | |
12 | Concrete Curb, Curb | FT | 82.50 | |
13 | Concrete Curb, Curb and Gutter | FT | 1183.20 | |
14 | Monolithic Curb and Sidewalk | SF | 12412.20 | |
15 | Truncated Dome on New Surface | SF | 736.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
16 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
17 | Single Mailbox Support | EA | 1.00 | |
18 | Reinstall USPS Cluster Mailbox | EA | 1.00 | |
WATER SUPPY SYSTEM | ||||
19 | Relocate Irrigation System | LS | 1.00 |
This project has the following solicitation documents.
Bid Document | File Size | Notes |
883,183 |
||
1,343,400 |
||
153,089 |
||
80,600 |
||
151,463 |
||
135,430 |
||
337,226 |
||
84,586 |
||
605,744 |
||
464,744 |
||
465,162 |
. A Non-Mandatory pre-bid conference for this project will be held by conference call using Zoom on 2/24/2023 at 10:00 AM.
Pre-Bid Conference Date |
Feb 24, 2023 10:00AM (Pacific Standard Time) add to calendar |
There are currently no questions that have been answered
by The City of Beaverton.
When the question and answer period is open, vendors may
submit their questions on this solicitation to be
answered by The City of Beaverton.
Name: Michael Phillips
Email:
bidmail@BeavertonOregon.gov
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Solicitation: S-P34048-00007064 Responses Due in 33 Days, 19 Hours, 32 Minutes Header
State Government of Oregon
Bid Due: 6/27/2023
ITB 22-0032 Southridge High School - HVAC Upgrades ITB 22-0032 Southridge High School
Beaverton School District
Bid Due: 6/27/2023
Bid Solicitation: S-KS0050-00007027 Responses Due in 28 Days, 19 Hours, 17 Minutes Header
State Government of Oregon
Bid Due: 6/20/2023
Bid Solicitation: S-24800-00007077 Responses Due in 32 Days, 19 Hours, 12 Minutes Header
State Government of Oregon
Bid Due: 6/27/2023