Concourse Roof Replacement

Agency: State Government of Wisconsin
State: Wisconsin
Type of Government: State & Local
NAICS Category:
  • 238160 - Roofing Contractors
Posted Date: Feb 6, 2019
Due Date: Mar 21, 2019
Solicitation No: 18E1D-01 GPC
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

IMPORTANT NOTICE:

The 2013 Wisconsin Act 20 created a mandatory pre-bid contractor certification program and required that all projects over $185,000 (increased to $300,000) are let through Single Prime Bidding and Contracting. All potential bidders must become certified by the Wisconsin Department of Administration (DOA) prior to submitting bids. All bids received from contractors who are not certified will be rejected. Please access the DFD Contractor Certification web page to apply for certification. Please access the DFD Single Prime Bidding and Contracting web page for more information about Single Prime.

The 2017 Wisconsin Act 237 made numerous changes to project thresholds and bidding requirements for state construction projects. Effective April 5, 2018, the threshold for small projects and projects requiring single prime bidding and contracting, have increased to $300,000. In addition, effective July 1, 2018, this law creates an exception to single prime contracting for certain construction projects. Under the new law, if 85% or more of the estimated construction cost of a project could be completed by a single trade MEP (mechanical, electrical, plumbing, or fire protection) contractor, the DOA may bid and contract all work for that construction project directly to a single trade MEP contractor. The changes for single trade contracting take effect for projects advertised for bid after July 1, 2018.

In certain instances, these threshold increases may impact contractor certification levels. Contractors who are currently certified for $300,000 or more in any division of work may bid on small projects up to the new threshold of $300,000. Contractors who are currently certified under $300,000 may only bid on a project up to their current certification level. Beginning July 1, 2018, single trade MEP contractors may bid all work on single trade projects up to their current division of work certification level for that trade. These changes will be automatically updated on WisBuild certification records and should not require any action by the contractor. If you have any questions, please email us at: dfdcertification@wisconsin.gov .

Please note, 2015 Wisconsin Act 55 repealed Wisconsin¡¯s prevailing wage laws on state building projects, effective September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Please be aware that 2017 Wisconsin Act 59 made changes to the applicability of the sale/use tax exemption under Wis. Stat. 77.54(9m) to state construction projects for the University of Wisconsin System and Extension. Please direct questions to the Department of Revenue.

Important Notice:

Please be advised that contractor certifications are only valid for a two year period. Please update and resubmit your application at least 2 months prior to your certification expiration date to allow sufficient time for processing a certification decision. All bids received from contractors who have an expired certification will be rejected. If you have any questions, please email us at: dfdcertification@wisconsin.gov .



To view and download/order bidding documents, please follow the steps below:
?

  1. Click the link displayed under to the 'A-1, Invitation to Bidders' to view the bid invitation
  2. To view additional bidding documents, click the 'Login Required' link to login with your WisBuild username/password.
  3. If you do not have a WisBuild account, click the 'Request New WisBuild Account' link. If any issues with the account request process, contact us at (608) 266-2731.
  4. Once logged in, please complete the 'Bid Vendor Options' section and proceed to Download Bid Documents and/or Order CD.

Project Number: 18E1D-01 GPC
Project Title: Concourse Roof Replacement
Bid Date: 03/21/2019
Bid ID: 8024
Notes: MEP Bid Opening March 7, 2019
Bid Bond: True
CD Available: True
Bid Documents Available Via: CD-ROM and/or Download

View/Download Files: (Large files may result in long download times)
Document Type View/Download File
MEP A-1, Invitation to Bidders 18E1D-01-BD- MEP-A 1 Doc.pdf (174.01 KB)
MEP Volume 1 Specification Table of Contents 18E1D-01-BD -MEP-TOC.pdf (148.25 KB)
MEP Volume 1 Specifications Login Required
GPC A-1, Invitation to Bidders 18E1D-01-BD GPC A 1 Doc.pdf (175.23 KB)
GPC Volume 1 Specification Table of Contents 18E1D-01-BD GPC-TOC.pdf (146.08 KB)
GPC Volume 1 Specifications Login Required
Drawings Volume 1 Login Required


Attachment Preview

1 MEP INVITATION TO BID (Rev 11/2017)
2 DIVISION OF FACILITIES DEVELOPMENT
3
4
CONCOURSE ROOF REPLACEMENT
5
CAMP RANDALL STADIUM
6
UNIVERSITY OF WISCONSIN - MADISON
7
MADISON, WISCONSIN
8
9
Division Project No. 18E1D-01
10
11 BID OPENING for MEP BIDDERS: 2:00 P.M., March 7, 2019
12 BID OPENING for GENERAL PRIME CONTRACTOR BIDDERS: 2:00 P.M., March 21, 2019
13
14 OWNER: State of Wisconsin, Department of Administration (DOA), Division of Facilities Development,
15 hereinafter termed DFD.
16
17 NOTICE: Effective January 1, 2014, all potential bidders must be certified by DOA prior to submitting
18 bids on state construction projects over $50,000. All bids received from contractors who are not certified
19 will be rejected. Contractor certification applications and instructions for completing the form may be
20 obtained from the DOA Website DFD Contractor Certification page:
21 http://www.doa.state.wi.us/category.asp?linkcatid=857&linkid=125&locid=4 or upon request from DFD--
22 email dfdcertification@wisconsin.gov.
23
24 This project is being let using a new single prime bidding and contracting process. DFD will publicly
25 bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within
26 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each
27 applicable MEP division of work. These successful MEP bids must be included in all general prime contractor
28 bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open
29 general prime contractor bids. General prime contractor bids that do not include the successful MEP
30 bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible,
31 certified general prime contractor and this general prime contractor will enter into subcontracts with the
32 successful MEP bidders.
33
34 Sealed bids will be received at the State of Wisconsin Administration Building, 7th Floor, 101 East Wilson
35 Street, Madison, Wisconsin 53703, before the time indicated above. The bidder is responsible for the sealed
36 bid being delivered to the indicated location for receipt stamping before the time specified for the bid opening.
37 Third party delivery is entirely at the bidder's risk.
38
39 In general, the work consists of completely replacing the existing 6200 sq. ft. asphalt roofing system.
40 Project includes removal and disposal of the asphalt roofing materials and all flashing down to bare concrete
41 deck and installation of new insulation, roofing materials, roof drains, and metal flashings as specified in the
42 design manual.
43
44 Bidding documents (drawings, specifications, and addenda) may be obtained only as electronic files (in PDF
45 format): as a downloadable file from the Division’s Projects Bidding website (see website address below)
46 and/or on compact discs or DVD by ordering from the Construction Project Bidding Opportunities webpage.
47 Bidding documents may also be seen at various Builders' Exchanges. Additional project bidding information,
48 including plan holders lists are available on the Division of Facilities Development public website:
49 http://www.doa.state.wi.us/divisions/facilities-development. After opening the web page, select Current
50 Construction Project Bidding Opportunities at the bottom of the screen.
51
52 Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online.
53
54
A-1
1 Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating,
2 Ventilating, Air Conditioning); and 5) Electrical.
3
4 No deposit is required to obtain documents for bidding purposes.
5
6 Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.
7
8 NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin’s
9 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state
10 building projects no longer apply. These changes take effect for projects advertised for bid after
11 September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.
12
13 A pre-bid tour will take place on February 14, 2019 at 12:30 P.M. Interested parties shall meet in the Athletic
14 Operations Building Conference Room.
15
16 Bidding Documents will be available online immediately upon the project being advertised for bid.
17
18
***
A-2

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Appendix 8: MHC Boilder House Building Floor Plans

Brown County

Bid Due: 4/08/2096

Diagonal Road Neighborhood Porous Asphalt Paving-Phase II (Quest Project #6332761) County/City/State: La Crosse

City of La Crosse

Bid Due: 6/06/2019

MRF Roof Replacement- Fully Adhered Department: Purchasing RFP Number: 2019-29 Start Date: 05/09/2019

Portage County

Bid Due: 5/30/2019

5045-19018: GMIA Parking Structure Swinging Door Replacement Replacement of automatic pedestrian doors, frames

Milwaukee County

Bid Due: 6/05/2019