Bacon Pump Station HVAC Project

Agency: The Sacramento Bee
State: California
Type of Government: State & Local
Caegory:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Posted Date: Mar 4, 2019
Due Date: Apr 12, 2019
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

NO 802 PUBLIC NOTICE San Juan Water District INVITATION TO BID Sealed Proposals will be received at the San Juan Water District office, located at 9935 Auburn Folsom Road, Granite Bay, California, CA 95746 until 1:30 p.m. local time on April 12, 2019, or such later date as may be set by addendum, and then will be publicly opened and read for the construction of the following public works projects: Bacon Pump Station HVAC Project This project includes, but is not limited to, the design and installation of a HVAC system at the District's Bacon Pump Station.

The HVAC project includes the design and installation of a new HVAC Unit, electrical, structural, and interior ducting improvements.

The Engineer's estimate for the HVAC projects is $35,000.

The Contract Documents for the Project, including the Request for Proposal, public works construction contract, instructions to bidders, bid forms, and specifications, may be obtained at the District's website at https://www.sjwd.org/current-rfp-s or examined at the District office, with prior notice to District representative: Tony Barela, Operations Manager, (916) 791-6939.

A copy of Contract Documents may be obtained through the District's website or upon request at the District's main office with a payment for the cost of reproduction (approximately $10 each).

This payment is non-refundable.

Bidders must comply with the Instructions to Bidders.

The District will hold a mandatory pre-bid conference at the District Office with a site visit immediately following, on March 14, 2019 at 1:00 p.m. Attire appropriate for a site visit should be worn.

It is suggested each prospective bidder review the bid documents and project site prior to the pre-bid conference.

Each prospective bidder shall be required to attend the pre-bid conference; a maximum of two representatives from each firm will be allowed to attend the after conference site walk.

Bids will not be accepted from any bidder not attending this conference.

Dated this 4 day of March 2019 San Juan Water District By: Tony Barela,Operations Manager

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bids: Westside Retention Basin Pump Replacement Project Department: Public Works, Street Category: Bids,

City of Santa Clara

Bid Due: 4/24/2019

Bids: Westside Retention Basin Pump Replacement Project Department: Public Works, Street Category: Bids,

City of Santa Clara

Bid Due: 4/24/2019

Opportunity History Original Synopsis Apr 11, 2019 6:18 pm Solicitation Number : 140R2019Q0080

Department of the Interior

Bid Due: 4/26/2019

Solicitations Solicitation Number : * 190033.AL Solicitation Status : Post Future Solicitation Title

Sacramento Municipal Utility District