Bid Solicitation: SPD123-SPDAD-4759
|
Header Information
|
Bid Number:
|
SPD123-SPDAD-4759
|
Description:
|
AC Pipe and Soil Sampling Project
|
Bid Opening Date:
|
11/15/2022 02:59:59 PM
|
Purchaser:
|
Jason Cloninger
|
Organization:
|
Special Districts
|
Department:
|
SPDADMIN - ADMINISTRATION
|
Location:
|
ADENG - Engineering
|
Fiscal Year:
|
23
|
Type Code:
|
RB - Request For Bid
|
Allow Electronic Quote:
|
Yes
|
Alternate Id:
|
|
Required Date:
|
|
Available Date :
|
10/06/2022 08:59:59 AM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
RESCHEDULED: Mandatory Pre-Bid meeting will start at 10:00 a.m. on Thursday, October 27, 2022 at the CA 70 J Shop and Yard, 7939 Opal Avenue, Hesperia CA 93344.
|
Bulletin Desc:
|
|
|
Ship-to Address:
|
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: mona.montes@sdd.sbcounty.gov
Phone: (909)386-8800
|
Bill-to Address:
|
Special Districts Admin
Reception
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: mona.montes@sdd.sbcounty.gov
Phone: (909)386-8800
|
Print Format:
|
|
File Attachments:
|
AC Pipe and Soil Sample Collection Addendum No. 1 10-18-22.pdf
Prevailing Wage Determinations FEB 2022
Section A - Bidding Requirements~19.pdf
Section B - Contract and Bonds~8.pdf
Section C - Prevailing Wage Determinations~1.pdf
Section D - General Conditions~10.pdf
Section E - Special Conditions~10.pdf
Section F - Performance Specs~1.pdf
Section G - Pipe Sampling Location Maps.pdf
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
10/18/2022 02:05:40 PM
|
Header 1. Bid Opening Date changed from "11/10/2022 02:59:59 PM" to "11/15/2022 02:59:59 PM". 2. Pre-Bid Conference changed from "Mandatory Pre-Bid meeting will start at 10:00 a.m. on Thursday, October 20, 2022 at the CA 70 J Shop and Yard, 7939 Opal Avenue, Hesperia CA 93344." to "RESCHEDULED: Mandatory Pre-Bid meeting will start at 10:00 a.m. on Thursday, October 27, 2022 at the CA 70 J Shop and Yard, 7939 Opal Avenue, Hesperia CA 93344.". Attachment File Changes: Header 1. File 'AC Pipe and Soil Sample Collection Addendum No. 1 10-18-22.pdf': File 'AC Pipe and Soil Sample Collection Addendum No. 1 10-18-22.pdf' added .
|
|
|
Item # 1: ( 913 - 92 )
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes properly locating the identified AC waterline at each sampling location via Underground Service Alert; provide and implement adequate traffic controls measures; excavate and shore trench to reach each identified AC waterline; log, record, photograph soil conditions at and around each AC waterline; collect a representative soil sample; install line-sized tapping saddle and hot tap the identified AC waterline, collect a full thickness pipe sample, min 1-inch, max 3-inch; and install appropriately sized corp stop sealed with a threaded brass plug. Log each location via GPS, noting depth to top of pipe. Backfill, compact and pave as necessary to restore site to pre-work condition .
|
|
NIGP Code:
|
913-92
Maintenance and Repair, Water System, Main and Service Line
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
BERNARDINO_SBCOUNTY_AWS_PROD_BUYSPEED_1_bso
|