Search Results for the last five years
- the last detail
- the last disciple
- the last ditch
- the last dragon
- the last emperor
- the last five years
- the last grenadier
- the last holiday concert
- the last home run
- the last leap year
- the last mr big
- the last mr bigg
- the last mr biggs
- the last plague
- the last poet
- the last president of usa
- the last resort cabin
- the last roll call
- the last shall be first
- the last straw
- the last supper
- the last supper original
- the last ten years
- the last thing she said
- the last to defend
- the last trapper
- the last unicorn
- the late show page
- the latest on news issue
- the leader news paper
|
|
| Government Bids |
Result 1 - 10 of 187 Document(s) |
Z--MASSEY AVENUE CORRIDOR ROAD RECONSTRUCTION AND IMPROVEMENTS
Florida
- Dec 18, 2008
......following information. Submit a maximum of five (5) projects describing the following: 1) Past ...Describe projects completed in the last three (3) years that are similar in size, ...
Z--WHARF IMPROVEMENTS, NAVAL STATION MAYPORT, FL
Florida
- Dec 18, 2008
......water utility mains; and replaces five (5) salt water pumps in the ...Describe projects completed in the last three (3) years that are similar in size, ...
Y--PARKING GARAGE, NAVAL STATION MAYPORT, FL
Florida
- Dec 18, 2008
......following information. Submit a maximum of five (5) projects describing the following: 1) Past ...Describe projects completed in the last three (3) years that are similar in size, ...
Y--Fire Protection Multiple Award Construction Contract
Illinois
- Dec 08, 2008
......000,000.00 for a Base year and four option years. This contract will be awarded ...be awarded to three to five contractors. The NAICS Code is ...than $14.0 million for the last ...
R--Litigation Support to the Air Force and Dept of JusticeAgencies
- Dec 05, 2008
......service contract with four out-year options. Contractor Experience The Litigation ...with investigations dated within the last five years. Top Secret clearances are required ...
Y--Earth Work for a Union Pacific main line in Fort Riley, Kansas
- Dec 01, 2008
......railroad track project within the last five (5) years? 6. Do you expect that your ...
C--Architect-Engineer services for the design of flood protection structures and flood repair and restoration design and implementation measures and services
Colorado
- Nov 27, 2008
......by the company within the last five years and not exceed 10 double ...
Z--Design and Construction of a Ready Service Magazine Complex at Crane, Indiana
Illinois
- Nov 26, 2008
......and address of the firm; (2) Year firm was established; (3) Names of ...than $33.5 million for the last three complete fiscal years; (8) Certifications/ Resumes and past performance ...and completed within the last five ...
Y--REPAIRS TO RUNWAYS, ARRESTING GEARS, AND DRAIN LINES BENEATH THE RUNWAYS AT NAS KINGSVILLE, TX.
Florida
- Nov 26, 2008
......or substantially performed within the last five years. Contracts with federal, state, or ...
99--AIRPORT TRAFFIC CONTROL TOWER FACILITY MODERNIZATION PROJECT AT MORRISTOWN MUNICIPAL AIRPORT, MORRISTOWN, NEW JERSEY
- Nov 24, 2008
......performance evaluation. A list of the last three (3) prime contracts and the ...subcontracts completed during the past five (5) years similar in size, complexity and ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
|
|