Search Results for kitchen shelving wire
- kitchen range
- kitchen range hoods
- kitchen range review
- kitchen remodel
- kitchen remodel before after
- kitchen remodel cost
- kitchen remodel design
- kitchen remodel plan
- kitchen remodeling
- kitchen remodeling contractor
- kitchen remodeling cost
- kitchen remodeling floor
- kitchen remodeling floor plan
- kitchen remodeling milwaukee
- kitchen remodeling plan
- kitchen remodeling prices
- kitchen remodeling services
- kitchen renovation
- kitchen renovation cost
- kitchen renovation design
- kitchen renovation plan
- kitchen renovations
- kitchen restaurant supply
- kitchen scale
- kitchen see thru
- kitchen set small table
- kitchen set tool
- kitchen set utensil
- kitchen sex
- kitchen shelf
|
|
| Government Bids |
Result 1 - 3 of 3 Document(s) |
INDUSTRIAL KITCHEN EQUIPMENT
North Carolina
- Aug 12, 2008
...INDUSTRIAL KITCHEN EQUIPMENTSolicitation Number: H92237-08-T-0950Agency: ...two-section, 33 cu. ft., (8) wire Shelves, laminated vinyl exterior, white ...TRUE Stripe graphic, std. (nc) SHELVING, WIRE 50 each Shelf, ...
Sealed Responses for Renovations and Building Code Upgrades for the Fairmont Minnesota National Guard Armory (Project No. 07309) will be received by the Facilities Management Office, Department of Military Affairs, State of Minnesota, Camp Ripley, 15000 Highway 115, Little Falls, Minnesota 56345-4173, until the date and time listed in the Response Due date and time noted above. After such time, responses will be opened and publicly read aloud. The estimated construction cost is $1,400,000. The project includes but is not limited to: 1) Office and classroom area renovations to include floor finishes, new ceilings, room finishes, window replacement, doors and door hardware; 2) Kitchen renovation; 3) New restrooms, showers and locker rooms; 4) New metal shelving and wire mesh partitions; 5) New HVAC systems with DDC controls; 6) Boiler replacement and distribution system; 7) Miscellaneous brick infill and minimal tuck pointing and masonry sealant; 8) New fire sprinkler, fire alarm...
Minnesota
- Jul 23, 2008
......replacement, doors and door hardware; 2) Kitchen renovation; 3) New restrooms, showers and ...and locker rooms; 4) New metal shelving and wire mesh partitions; 5) New HVAC systems ...
Sealed Responses for Renovations and Building Code Upgrades for the East St. Paul Minnesota National Guard Armory (Project No. 07310) will be received by the Facilities Management Office, Department of Military Affairs, State of Minnesota, Camp Ripley, 15000 Highway 115, Little Falls, Minnesota 56345-4173, until the date and time listed in the Response Due date and time noted above. After such time, responses will be opened and publicly read aloud. The estimated construction cost is $1,800,000.00. The project includes but is not limited to: Office, classroom, storage and vehicle maintenance bay renovations to include floor finishes, new ceilings, room finishes, window replacement, doors and door hardware. Excavation of foundation, waterproofing and drain tile installation along basement foundation. Asphalt overlay of parking area. Provide concrete turn pads at military vehicle compound. 320sf addition to accommodate basement egress and kitchen storage. Kitchen renovation. New...
Minnesota
- Jul 01, 2008
......to accommodate basement egress and kitchen storage. ...and locker rooms. New metal shelving and wire mesh partitions. New HVAC systems ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
|
|