Search Results for kitchen set tool
- kitchen range
- kitchen range hoods
- kitchen range review
- kitchen remodel
- kitchen remodel before after
- kitchen remodel cost
- kitchen remodel design
- kitchen remodel plan
- kitchen remodeling
- kitchen remodeling contractor
- kitchen remodeling cost
- kitchen remodeling floor
- kitchen remodeling floor plan
- kitchen remodeling milwaukee
- kitchen remodeling plan
- kitchen remodeling prices
- kitchen remodeling services
- kitchen renovation
- kitchen renovation cost
- kitchen renovation design
- kitchen renovation plan
- kitchen renovations
- kitchen restaurant supply
- kitchen scale
- kitchen see thru
- kitchen set small table
- kitchen set tool
- kitchen set utensil
- kitchen sex
- kitchen shelf
|
|
| Government Bids |
Result 1 - 10 of 189 Document(s) |
S--Sources Sought for Kitchen Exhaust Systems, Cleaning
Missouri
- Feb 25, 2010
......identify potential offerors to clean kitchen exhaust systems at Fort Leonard ...equipment, labor, management, materials, supervision, tools, and transportation necessary to maintain ...the Government will determine the set-aside method for ...
REHABILITATION OF MULTIPURPOSE BUILDING AT USCG STATION MARATHON, FLORIDA
- Feb 08, 2010
......considering whether or not to set aside an acquisition for HUBZone ...work includes furnishing all labor, tools, equipment and materials for the ...unit, and accessories in galley (kitchen) area. B. Repair building ...
S--Clean Kitchen Exhaust Systems, Mold Remediation in Buildings, and Air Conditioning Duct Cleaning and Decontamination Services at Various Locations, Oahu, Hawaii.
- Feb 06, 2010
......identify potential offerors for Clean Kitchen Exhaust Systems, Mold Remediation in ...equipment, labor, management, materials, supervision, tools, and transportation necessary to maintain ...the Government will determine the set-aside method for ...
RECOVERY Z--RECOVERY ACT: KITCHEN COOK/CHILL EQUIPMENT SITEPREP STIMULUS PROJECT 589-09-208
Kansas
- Jan 29, 2010
......ACT: Provide all labor, materials, tools, equipment,supervision, etc. and completely ...perform all work for project Kitchen Cook/ChillEquipment Site Prep, (589-...construction project is a competitive total set-aside forService-Disabled ...
S--Facilities Support Services, NSA, Crane, IN
Indiana
- Jan 06, 2010
......is to issue a solicitation on a set aside basis to Service Disabled ...supervision, management, materials, supplies, equipment, tools, transportation, incidental engineering, and vehicles ...required.MAINTENANCE CLEANING SERVICES OF KITCHEN EXHAUST HOOD SYSTEMS - ...
RECOVERY Z--RECOVERY ACT: KITCHEN COOK/CHILL EQUIPMENT SITE PREP STIMULUS PROJECT 589-09-208
Kansas
- Dec 08, 2009
......ACT: Provide all labor, materials, tools, equipment, supervision, etc. and completely ...perform all work for project Kitchen Cook/Chill Equipment Site Prep, (...construction project is a competitive total set-aside for Service-...
West Hawai`i Emergency Program Facility, Phase 2, Keahuolu, North Kona, Hawai`i. Estimated cost is $1,300,000.00.
Hawaii
- Dec 02, 2009
......SEALED BIDS for furnishing all tools, equipment, materials and labor necessary ...areas; laundry room; non-commercial kitchen area for residents use; a paved ...this project (if any, as set forth above) are ...
Gas Cafeteria Griddle and Grill
Colorado
- Nov 23, 2009
......23/2009 Category: Food and Kitchen Supplies & Equipment Title: Gas Cafeteria ...that the equipment can be set to standard counter height. or ...to hold spices and cooking tools. The shelf will ...
West Hawai`i Emergency Program Facility, Phase 2, Keahuolu, North Kona, Hawai`i. Estimated cost is $1,300,000.00.
Hawaii
- Nov 06, 2009
......SEALED BIDS for furnishing all tools, equipment, materials and labor necessary ...areas; laundry room; non-commercial kitchen area for residents use; a paved ...this project (if any, as set forth above) are ...
Hilo Municipal Golf Course Clubhouse Building Grease Trap Replacement, Hilo, Hawai`i. Estimated cost is $116,000.00.
Hawaii
- Oct 29, 2009
......SEALED BIDS for furnishing all tools, equipment, materials and labor necessary ...of existing plumbing lines in kitchen and all repairs associated with ...this project (if any, as set forth above) are ...
|
 |
|
|
Copyright 2004 GovCB.com All rights reserved
|
|