- industrial floor cleaning equipment
- industrial floor cleaning machine
- industrial floor coating
- industrial floor covering
- industrial floor fan
- industrial floor mat
- industrial floor paint
- industrial floor plan
- industrial floor scale
- industrial floor sweeper
- industrial floor tile
- industrial floor washer
- industrial flooring
- industrial flooring contractor
- industrial flow meter
- industrial fluorescent lighting
- industrial food processing equipment
- industrial food processor
- industrial forklift battery
- industrial freezer
- industrial freezer door
- industrial furnace
- industrial garage door
- industrial gas burner
- industrial gas company
- industrial gas cylinder
- industrial gas heater
- industrial gas oven
- industrial gas supply
- industrial gas turbine
|
|
| Government Bids |
Result 1 - 9 of 9 Document(s) |
69--The Marine Corps has a current requirement for the procurement, delivery and installation of four (4) Modular Range Control Towers and one (1) Mobile Range Control Tower for live fire ranges.
- Jul 08, 2008
......be sliding style for ventilation. Floors should be metal with tread-...be metal with tread-plate covering. The towers should be insulated ...12 high. Walls, ceiling and floor must be of a ...
Remove and Install Floor Coverings Basewide
District of Columbia
- Jun 28, 2008
...Remove and Install Floor Coverings BasewideSolicitation Number: FA7012-08-R-0001Agency: ...orders. The applicable North American Industrial Classification Code (NAICS Code) is ...
Remove and Install Floor Coverings Basewide
District of Columbia
- May 28, 2008
...Remove and Install Floor Coverings BasewideSolicitation Number: FA7012-08-R-0001Agency: ...orders. The applicable North American Industrial Classification Code (NAICS Code) is ...
69--The government is seeking sources to for the procurement and installation of modular range control towers on three separate ranges at Marine Corps Air Station Cherry Point NC.
- May 16, 2008
......be sliding style for ventilation. Floors should be metal with tread-...be metal with tread-plate covering. The towers should be insulated ...and hurricanes. Walls, ceiling and floor must be of a ...
67 -- Sewer Inspection System
Wyoming
- Feb 25, 2008
......AND STUDIO: Must have a rubberized floor covering; insulated walls with carpet & FRP ...insulated walls with carpet & FRP coverings; 12 volt fluorescent light fixture; ...with multi-layered PVC resin industrial covering; modular ...
67 -- Sewer Inspection System
Wyoming
- Feb 19, 2008
......AND STUDIO: Must have a rubberized floor covering; insulated walls with carpet & FRP ...insulated walls with carpet & FRP coverings; 12 volt fluorescent light fixture; ...with multi-layered PVC resin industrial covering; modular ...
67 -- Sewer Inspection System
Wyoming
- Feb 13, 2008
......AND STUDIO: Must have a rubberized floor covering; insulated walls with carpet & FRP ...insulated walls with carpet & FRP coverings; 12 volt fluorescent light fixture; ...with multi-layered PVC resin industrial covering; modular ...
99 -- Smart Cell Tech
Colorado
- Dec 04, 2007
......Academy - 10 MSG/LGC, 8110 Industrial Drive Suite 200, USAF Academy, ...Reconfigurable modular tiles 15. Floating floor / loose-lay design, eliminating need ...to cover with commercial floor coverings with releasable adhesive ...
65 -- Smart Cell Tech
Colorado
- Dec 04, 2007
......Academy - 10 MSG/LGC, 8110 Industrial Drive Suite 200, USAF Academy, ...Reconfigurable modular tiles 15. Floating floor / loose-lay design, eliminating need ...to cover with commercial floor coverings with releasable adhesive ...
|