- in the shower together
- in the silence
- in the spotlight
- in the still of the night
- in the still of the night
- in the suitcase
- in the summer rain
- in the summer time
- in the swim
- in the thick
- in the time of the butterfly
- in the time of the butterfly
- in the time of the butterfly note
- in the time of the butterfly quote
- in the trench
- in the trunk
- in the trunk of my car
- in the tub
- in the upper room
- in the vip
- in the vip party
- in the vip room
- in the vip room party
- in the void
- in the waiting line
- in the waiting room
- in the weeds
- in the will of god
- in the wind
- in the wire
|
|
| Government Bids |
Result 1 - 10 of 189 Document(s) |
DES - Pitney Bowes Postage Supplies
Illinois
- Dec 23, 2008
......of supplies other than Pitney Bowes may void these maintenance contracts. Key Information Notice Type:...
DRYDOCK AND REPAIR USCGC PAMLICO (WLIC-800)
Virginia
- Dec 23, 2008
......disposal), Clean and Inspect Ballast Tanks and Voids, Clean and Inspect Sewage and Grey Water ...Reconditioning of Propeller, Preserve Ballast Tanks and Voids Partial, Preserve Ballast Tanks and ...
DRYDOCK OF USCGC PEA ISLAND (WPB-1347)
Virginia
- Dec 20, 2008
......Forward Auxiliary Machinery Space. 14. Preserve Forward Void. 15. Renew Floating Deck System in Galley ...
Maintenance on FACARIA Flow Cytometer 3 Laser System, FACScan and FACScalibur
Maryland
- Dec 12, 2008
......parts used may defect the equipment and void any existing warranties. Contractor maintenance agreement is ...
DRYDOCK OF USCGC PEA ISLAND (WPB-1347)
Virginia
- Dec 11, 2008
......Forward Auxiliary Machinery Space. 14. Preserve Forward Void. 15. Renew Floating Deck System in Galley ...
Y--Old Mill Creek Sewer Rehab
- Dec 11, 2008
......MSD) sewers by doing various repairs including void repairs, external chemical grouting, cement grouting of ...repairs, external chemical grouting, cement grouting of voids, replacement of lateral sewers, repair of lateral ...
Y--Old Mill Creek Sewer Rehab
- Dec 10, 2008
......MSD) sewers by doing various repairs including void repairs, external chemical grouting, cement grouting of ...repairs, external chemical grouting, cement grouting of voids, replacement of lateral sewers, repair of lateral ...
Dry-dock & Repairs of CGC JARVIS (WHEC 725) and CGC RUSH (WHEC 723)
California
- Dec 10, 2008
......Plating Renewal, Air Castle Stiffener Renewal, DC Void Hull Plating Renewal, Deck Grate Framing Renewal, ...Fairwaters And Rope Guards Inspect And Repair, Voids Non-Accessible Leak Test, Tanks (Mp Fuel ...Ground Tackle Inspect And Repair, Bilges (DC Void) ...
GBU-28 Hard Target Void Sensing Fuze TD Phase Support
Florida
- Dec 05, 2008
...GBU-28 Hard Target Void Sensing Fuze TD Phase SupportSolicitation Number: FA8678-...SDD) and Production of the Hard Target Void Sensing Fuzes (HTVSFs). The HTVSF system is ...
eWFM Maintenance
Texas
- Dec 04, 2008
......software would make the warranty null and void. Therefore, it is the intent and in ...
|